Home / Browse projects / Raigarh, Maharashtra / LABDHI GARDENS PHASE 6

Registered No litigation declared Residential / Group Housing project

LABDHI GARDENS PHASE 6

By Labdhi Lifestyle Limited

RG-MH-83412 · RERA P52000019683 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 98%
52 of 83Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

LABDHI GARDENS PHASE 6 is a Residential / Group Housing project by Labdhi Lifestyle Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000019683 on 20 Feb 2019. Possession is promised by 30 Dec 2026. 31 of the 83 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameLABDHI GARDENS PHASE 6
  • TypeResidential / Group Housing
  • Location
    • Dahivali tarf varedi
    • Labdhi Gardens
    • Neral -Karjat
    • Dahiwali T. Waredi
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000019683
  • ReraGenie IDRG-MH-83412

Builder

  • NameLabdhi Lifestyle Limited
  • Entity typeCompany
  • ChairpersonMahendra M Jain
  • Managing DirectorAJAY SABOO
  • Other registrations10 more →
  • Completed6 of 11

Key dates

this monthRegisteredFeb 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Current status

37%31 of 83 units booked
99.8%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WISTERIANA8783083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

WISTERIA: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes60%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes96%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed209

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots209
Closed/Covered1
Open Space208

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,326 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2025

Approvals and building plan

Sanctioning authorityCollector
Permissible FSI2326.12
Proposed, not sanctioned2,326 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchZAVERI BAZAR,MUMBAI-400002
Estimated costRs 6.53 cr
Cost incurredRs 6.52 cr
Work done99.85%
BuildingWingEstimatedIncurred
WISTERIANARs 6.53 crRs 6.52 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Raisingh M Ahuja
EngineerDhaneshwar Rasal
Chartered AccountantKailash Chand Jain & Co
Chartered AccountantSuthar Tawde & Associates
PartnerRole in project
Labdhi Lifestyle Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Phase 6 Wisteria_30062026 DSC.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate 30062026 Phase 6 Wisteria DSC.pdf14 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Phase 6- V2_1_11zon DSC.pdf14 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Phase 6 Wisteria DSC.pdf28 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Phase 6 Wisteria DSC.pdf28 Apr 2026
Withdrawal Update Form 3File: LG Phase 6 Wisteria Form 3 CA Certificate 31032026 DSC.pdf28 Apr 2026
Form 1File: Form 1 Architect Certificate 31122025 Wisteria Phase 6.pdf5 Feb 2026
Form 2File: ENGINEERS CERTIFICATE ph 6 31122025 DSC.pdf5 Feb 2026
Form 3File: LG Phase 6 Wisteria Form 3 CA Certificate 31122025.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: LG Phase 6 31122025 DSC.pdf5 Feb 2026
Form 1File: Form 1 Phase 6 Wisteria 30092025.pdf5 Dec 2025
Form 2File: ENGINEERS CERTIFICATE ph 6 30092025 DSC.pdf5 Dec 2025
Form 3File: ENGINEERS CERTIFICATE ph 6 30092025 DSC.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: LG Phase 6 DSC.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: Phase 6 Form 5 Signed.pdf25 Nov 2025
Form 1File: Form 1 Wisteria 30062025 Phase 6.pdf29 Sep 2025
Form 2File: Form 2 Wisteria Phase 6 30062025 DSC.pdf29 Sep 2025
Form 3File: Form 3 LG Phase 6 30062025.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: LG Phase 6 DSC.pdf29 Sep 2025
Form 1File: Form 1 Architect Certificate 31122024 Wisteria Phase 6.pdf24 Jun 2025
Form 2File: ENGINEERS CERTIFICATE ph 6 31122024.pdf24 Jun 2025
Form 3File: Form 3 Phase 6 Wisteria Form 3 CA Certificate 31122024 DSC.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Phase 6 Wisteria 31122024 DSC.pdf24 Jun 2025
Form 1File: Form 1 Wisteria Phase 6 31032025.pdf24 Jun 2025
Form 2File: Form 2 Phase 6 Wisteria 31032025.pdf24 Jun 2025
Form 3File: LG Phase 6 Wisteria Form 3 CA Certificate 31032025 DSC.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: LG Phase 6 Wisteria 31032025 DSC.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31122024 Westeria Phase 6.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE ph 6 31122024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30092024 Wisteria Phase 6.pdf25 Nov 2024
Certificates of CA (Form 3)File: Form 3 LG Phase 6 wisteria 30092024.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Phase 6 30092024 Wisteria.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 LG Phase 6.pdf20 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 LG Phase 6.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Phase 6 Architect Certificate 30062024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 6 Engineers Certificate 30062024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Phase 6 Q1 2024 25 30062024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 Phase 6 31032024 LLL.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Wisteria Form 2A phase 6 31032024.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Wisteria Form 2A phase 6 31032024.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate 31032024 Wisteria Phase 6.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Ph 6 Wisteria 31032024.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31122023 Wisteria Phase 6.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE ph 6 3112.pdf20 Jan 2024
Certificates of CA (Form 3)File: 5 LLL Phase 6 Form 3 31122023.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Certificate 2A Labdhi Garden PH 6 FY 2021 2022.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Certificate 2A Labdhi Garden PH 6 FY 2022 2023.pdf18 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 6 FY 2022 2023.pdf17 Nov 2023
Certificates of CA (Form 3)File: LLL_Form_3_Q2_FY_2023-24_Phase_6.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30092023 Wisteria Phase 6.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate Ph-6.pdf16 Oct 2023
Certificates of CA (Form 3)File: Labdhi Form 3 Phase 6 300623.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30062023 Wisteria Phase 6.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Ph 6.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Phase 6 31122022.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31032023 Aaster Phase 9.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31032023 Wisteria Phase 6.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Labdhi Garden Phase 6 31032023.pdf11 Jul 2023
Certificates of CA (Form 3)File: LLL Form 3 Q3 Phase 6 Wisteria 31122022.pdf11 Jul 2023
Certificates of CA (Form 3)File: LLL Form 3 Q4 Phase 6 Wisteria Scanned 31032023.pdf11 Jul 2023
Certificates of CA (Form 3)File: Labdhi Lifestyle ltd Form 3 Gardens Phase 6 Wisteria KarjatQ4 201819_compressed.pdf12 Jun 2023
Certificates of CA (Form 3)File: Labdhi Lifestyle ltd Form 3Gardens Phase 6 Wisteria KarjatQ1 201920_compressed.pdf12 Jun 2023
Certificates of CA (Form 3)File: Labdhi Lifestyle ltd Form 3Gardens Phase 6 Wisteria KarjatQ2 201920_compressed.pdf12 Jun 2023
Certificates of CA (Form 3)File: Labdhi Lifestyle ltd Form 3Gardens Phase 6 Wisteria KarjatQ3 201920_compressed.pdf12 Jun 2023
Certificates of CA (Form 3)File: Labdhi Lifestyle ltd Form 3Gardens Phase 6 Wisteria KarjatQ4 201920_compressed.pdf12 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19_Phase 6.pdf6 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20_Phase 6.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 6 W Building 31122022.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5_Phase - 6_FY 2020-21.pdf22 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_Phase 6_FY 2021-22.pdf22 Dec 2022
Certificates of CA (Form 3)File: Form 3- Labdhi Gardens Phase 6 ( Wisteria).pdf12 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Ph-6 Wisteria_11zon.pdf28 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate Ph-6_11zon.pdf1 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Phase 6_Form 2A_FY-2019-20.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Phase 6_Form 2A_FY-2020-21.pdf20 Jul 2022
Certificates of CA (Form 3)File: Form 3_LG_Ph-6_Jun-22_11zon.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_LG_Ph-6_Wisteria_Jun-22_11zon.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_LG_Ph-6_Wisteria_Jun-22_11zon.pdf16 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Ph 6_Wisteria_Mar-22.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Ph 6_Wisteria_Dec-21_11zon.pdf7 Jul 2022

How this compares with Raigarh

37%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LABDHI GARDENS PHASE 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Labdhi Gardens,Neral -Karjat5,900+ in Raigarh

2 kmLABDHI GARDENS PHASE 6Completed 41Lapsed / revoked 47Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 105 registered projects within 2 km.

Builder: Labdhi Lifestyle Limited

Labdhi Lifestyle Limited has 11 registrations on MahaRERA, including LABDHI GARDENS PHASE 1 and LABDHI GARDENS PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if LABDHI GARDENS PHASE 6 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LABDHI GARDENS PHASE 6?

The registered promoter entity is Labdhi Lifestyle Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LABDHI GARDENS PHASE 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LABDHI GARDENS PHASE 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LABDHI GARDENS PHASE 6?

The professionals named in the filing: Architect: Ar Raisingh M Ahuja; Engineer: Dhaneshwar Rasal; Chartered Accountant: Kailash Chand Jain & Co; Chartered Accountant: Suthar Tawde & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LABDHI GARDENS PHASE 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LABDHI GARDENS PHASE 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LABDHI GARDENS PHASE 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.