Completed No litigation declared Residential / Group Housing project

KUSH SYMPHONY

By Kush Buildcon LLP

RG-MH-29860 · RERA P51800030410 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

KUSH SYMPHONY is a Residential / Group Housing project by Kush Buildcon LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030410 on 20 Aug 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameKUSH SYMPHONY
  • TypeResidential / Group Housing
  • Location
    • Dr Rajendra Prasad Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030410
  • ReraGenie IDRG-MH-29860

Builder

  • NameKush Buildcon LLP
  • Entity typePartnership
  • PartnerParag Suresh Shah
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2021First promiseDec 2023Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Aug 2021
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUSH SYMPHONYNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KUSH SYMPHONY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,070 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KUSH SYMPHONYKurlaMumbai Suburban

Approvals and building plan

Permissible FSI2352.96
Proposed, not sanctioned1,028 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 7 Bharta Arch Andheri West Mumbai 400053

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Niten P Dedhia
EngineerMr Mahesh K Boricha
Chartered AccountantMr Nirav Sukhadia
PartnerRole in project
Kush Buildcon LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018785Dec 2023 → Dec 2024

Reason as filed by the promoterDUE TO COVID 19 NOT ABLE TO COMPLETE PROJECT PLEASE GRANT US EXTENSION TILL 30/12/2024

EXT51800025783Dec 2023 → Jun 2025

Reason as filed by the promoterThe construction work for project is almost completed and was delayed due to some additional work related to CFO, electric meter room, pump room and for increase in size of underground water tank. As on date the project is nearing completion and final CFO NOC from CFO is expected soon. Further we have started with completing the compliances required for obtaining OC certificate and the same is expected soon.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - R.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERAQ4.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RE.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf5 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Kush Symphony of New Sudha CHSL - Full.pdf5 Apr 2025
Declaration in FORM BFile: FORM B.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: List of Inventory.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 2A 23-24.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA - Kush Symphony - Form 5 - FY 23-24.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: List of Inventory - Kush Symphony - Full.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 10 23.pdf24 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 01 24.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 10 23.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 01 24.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 10 23.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 01 24.pdf24 Feb 2024
Declaration in FORM BFile: FORM B - Final print on Rs 100 Stamp Paper.pdf12 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer form 2A FY 21-22 - Kush Symphony.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer form 2A FY 22-23 - Kush Symphony.pdf11 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf11 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA - Kush Symphony - Form 5 - FY 22-23 - Final.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf29 Sep 2023
Proforma of Agreement for saleFile: Draft - Kush Symphony - AFS - Final RERA.pdf30 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 Mulund.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - RERA.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - RERA.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - RERA.pdf10 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - RERA.pdf10 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf10 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA .pdf18 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - RERA.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - RERA.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - RERA - New Sudha.pdf14 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - RERA - New Sudha.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - Site Supervisor - RERA - New Sudha.pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - RERA.pdf14 Oct 2021
Layout approvalFile: IOD - New Sudha - Plan 1.pdf13 Aug 2021
Layout approvalFile: IOD - New Sudha - Plan 2.pdf13 Aug 2021
Layout approvalFile: IOD - New Sudha - Plan 3.pdf13 Aug 2021
Copy of Layout Approval (in case of layout)File: IOD - New Sudha - Plan 1.pdf13 Aug 2021
Copy of Layout Approval (in case of layout)File: IOD - New Sudha - Plan 2.pdf13 Aug 2021
Copy of Layout Approval (in case of layout)File: IOD - New Sudha - Plan 3.pdf13 Aug 2021
Building plan approvalFile: IOD - New Sudha.pdf10 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD - New Sudha.pdf10 Aug 2021
Copy of the legal title reportFile: Title Certificate - Kush Symphony - RERA Formate.pdf5 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: First CC - New Sudha - Mulund West.pdf5 Aug 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf5 Aug 2021
PAN CardFile: Kush Buildcon LLP - PAN.pdf3 May 2021
Details of encumbrancesFile: No Encumbrance Self Declaration.pdf3 May 2021
Declaration in FORM BFile: FORM B - Final print on Rs 100 Stamp Paper.pdf3 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - RERA - New Sudha.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cettificate - Final.pdf3 May 2021
Proforma of Allotment letterFile: Letter Against Draft Agreement and Allotment - RERA.pdf3 May 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kush PearlDamu Anna Date Marg Dahanukarwadi Kandivali west Mumbai 40006729CompletedSep 2016Sep 2016
Purshottam KunjSameer Chandavarkar Lane Dahanukarwadi Kandivali west Mumbai 40006724CompletedMar 2013Mar 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUSH SYMPHONY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmKUSH SYMPHONYCompleted 42Lapsed / revoked 14Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: Kush Buildcon LLP

Kush Buildcon LLP has 4 registrations on MahaRERA, including Kush Prestige and Kush Sapphire. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KUSH SYMPHONY is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUSH SYMPHONY?

The registered promoter entity is Kush Buildcon LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUSH SYMPHONY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUSH SYMPHONY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUSH SYMPHONY?

The professionals named in the filing: Architect: Mr Niten P Dedhia; Engineer: Mr Mahesh K Boricha; Chartered Accountant: Mr Nirav Sukhadia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUSH SYMPHONY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUSH SYMPHONY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUSH SYMPHONY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.