Registered No litigation declared Residential / Group Housing project

KUMAR PEBBLE PARK JOY 1 - C1

By KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED

RG-MH-34116 · RERA P52100048543 · Last updated on MahaRERA portal: 7 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
0 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

KUMAR PEBBLE PARK JOY 1 - C1 is a Residential / Group Housing project by KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100048543 on 6 Jan 2023. Possession is promised by 31 Dec 2026. 56 of the 56 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUMAR PEBBLE PARK JOY 1 - C1
  • TypeResidential / Group Housing
  • Location
    • HANDEWADI ROAD
    • HADAPSAR
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048543
  • ReraGenie IDRG-MH-34116

Builder

  • NameKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200PN2013PTC147354
  • GSTIN27AAFCK1688N1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorRajas Vimalkumar Jain
  • Other registrations6 more →
  • Completed3 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

100%56 of 56 units booked
100.0%Work done, per cost certificate

Figures as on 7 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUMAR PEBBLE PARK JOY 1 - C1NA161456056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

KUMAR PEBBLE PARK JOY 1 - C1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered1
Open Space15

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area426 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI4956.83
Proposed, not sanctioned4,957 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM-4 VIRWANI PLAZA 11 EAST STREET CAMP PUNE 411001
Estimated costRs 15.86 cr
Cost incurredRs 15.86 cr
Work done100.0%
BuildingWingEstimatedIncurred
KUMAR PEBBLE PARK JOY 1 - C1NARs 11.61 crRs 11.61 cr
-NARs 4.25 crRs 4.25 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER VALIMBE
EngineerMr Abhijeet Shekar
Chartered AccountantSUPRIYA ABHIJIT MUNDADA
Chartered AccountantSPAK & CO.
PartnerRole in project
KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: KPPPL KPP Joy 1.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 Kumar Pebble Park Joy1 (C1) Bldg.pdf2 Feb 2026
Withdrawal Update Form 2File: Joy-1 Pebble_Park Engineers Certificate.pdf2 Feb 2026
Withdrawal Update Form 3File: KPPPL Joy 1 CA Certificate.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 1 Kumar Pebble Park Joy1 (C1) Bldg.pdf9 Nov 2025
Withdrawal Update Form 2File: Joy-1 Pebble Park Engineeru0027s Certificate.pdf9 Nov 2025
Withdrawal Update Form 3File: Form 3 K Pebble Park Joy 1.pdf9 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kumar Pebble Park Joy 1.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kumar Pebble Park Joy 1 (C1) Bldg.PDF19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Joy-1 Pebble Park Engineer's Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: KUMAR PEBBLE PARK - JOY 1 (C1).PDF19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K Pebble Park Joy1 Bldg.PDF15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kumar Pebble Park Joc 1 C1_compressed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Joy-1 Engineers Certificate.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: KUMAR PEBBLE PARK - JOY 1.PDF15 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbraces - Joy 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Kumar Pebble Park Joy 1 C1.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbraces - Joy 1.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Pebble Park Joy1 Bldg.PDF20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Pebble Park Joy 1.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Kumar Pebble Park - Joy 1 (C1).PDF20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Pebble Park Joy 1.PDF26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Pebble Park Joy1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Pebble Park Joy 1.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - Kumar Pebble Park Joy1.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Kumar Pebble Park Joy 1-C1 - 2023-24.pdf7 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Kumar Pebble Park Joy1 - 2023-24.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Joy 1.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Joy 1 - 2023.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Pebbple Park Joy 1.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Pebble Park Joy 1.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Joy1.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Joy 1 - 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Pebble Park Joy 1.PDF18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Joy-1_Pebble_Park_Engineer's Certificate.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Joy 1.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Pebble Park Joy 1.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance-Joy1 -C1.pdf15 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance-Joy1 -C1.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JOY 1.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Joy 1.PDF13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Joy-1_Pebble_Park_Engineer's Certificate.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Joy 1.PDF11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pebble Park - joy 1.pdf16 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Engineer's Certificate_Joy-1.pdf9 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Joy C 1.PDF29 Jul 2023
Disclosure of sold/ booked inventoryFile: Kumar Pebble Park - Joy 1 C1.PDF19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: joy 1 ca certificate.pdf28 Dec 2022
Details of encumbrances concerned to FinanceFile: Finanace Encumbrance Joy 1.pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: Finanace Encumbrance Joy 1.pdf3 Dec 2022
Copy of the legal title reportFile: Adv Erande Search Title Hadapsar.pdf22 Nov 2022
Deviation Report with respect to Allotment letterFile: allotment No Deviation.pdf15 Nov 2022
Proforma of Allotment letterFile: Kumar Joy 1 Allotment Letter.pdf11 Nov 2022
CERSAI detailsFile: CERSAI Search Report.pdf4 Nov 2022
Proforma of Agreement for saleFile: Kumar Joy 1 Unit Agreement - RERA.pdf4 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Kumar Joy 1 Unit Agreement RERA Deviations Dummy.pdf4 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf22 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf22 Oct 2022
Declaration about Commencement CertificateFile: Declaration Form D Commencement Certificate.pdf22 Oct 2022
Declaration in FORM BFile: FORM B AFFIDAVIT kpppl.pdf22 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about separate Bank Account updated.pdf22 Oct 2022
PAN CardFile: KPPPL PAN.PDF11 Oct 2022
Layout approvalFile: Layout.pdf10 Oct 2022
Building plan approvalFile: Basement.pdf10 Oct 2022
Building plan approvalFile: C1 C2 C3 Bldg Refuge Floor Plan.pdf10 Oct 2022
Building plan approvalFile: C1 C2 C3 Bldg Section Elevation.pdf10 Oct 2022
Building plan approvalFile: C1 C2 C3 Bldg Section.pdf10 Oct 2022
Building plan approvalFile: C1 C2 C3 Bldg Typical Floor Plan.pdf10 Oct 2022
Building plan approvalFile: Ground Parking.pdf10 Oct 2022
Building plan approvalFile: Podium Ground Parking.pdf10 Oct 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Basement.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: C1 C2 C3 Bldg Refuge Floor Plan.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: C1 C2 C3 Bldg Section Elevation.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: C1 C2 C3 Bldg Section.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: C1 C2 C3 Bldg Typical Floor Plan.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Ground Parking.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Podium Ground Parking.pdf10 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf10 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Joy1.pdf10 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kumar Primeview E1P52100052845pune, Pune239Oct 2023OngoingDec 2028Not due yet

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUMAR PEBBLE PARK JOY 1 - C1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HADAPSAR13,700+ in Pune

2 kmKUMAR PEBBLE PARK JOY 1 Completed 35Lapsed / revoked 15Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED

KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED has 7 registrations on MahaRERA, including KUMAR PALMCREST A4 BUILDING and KUMAR PALMNEST. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KUMAR PEBBLE PARK JOY 1 - C1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUMAR PEBBLE PARK JOY 1 - C1?

The registered promoter entity is KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2013PTC147354 and GSTIN 27AAFCK1688N1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUMAR PEBBLE PARK JOY 1 - C1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUMAR PEBBLE PARK JOY 1 - C1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUMAR PEBBLE PARK JOY 1 - C1?

The professionals named in the filing: Architect: SAMEER VALIMBE; Engineer: Mr Abhijeet Shekar; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA; Chartered Accountant: SPAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUMAR PEBBLE PARK JOY 1 - C1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUMAR PEBBLE PARK JOY 1 - C1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUMAR PEBBLE PARK JOY 1 - C1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.