Home / Browse projects / Pune, Maharashtra / Kumar Parc Residences - C Mhada
Kumar Parc Residences - C Mhada
By Kumar Properties Infratech Developers Pvt Ltd
RG-MH-56853 · RERA P52100047940 · Last updated on MahaRERA portal: 26 Aug 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
- 15 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
- Rs 14.78 crore secured on the land, in favour of Piramal Enterprises Ltd
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kumar Parc Residences - C Mhada is a Residential / Group Housing project by Kumar Properties Infratech Developers Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100047940 on 1 Dec 2022. The registration is recorded completed; possession was promised by 30 Nov 2026. The completion date has moved by 12 months from the original filing. 124 of the 140 units on this registration are recorded sold or booked, and 8 of 9 construction stages are filed complete. 15 complaints are on record with the regulator.
At a glance
Project
- NameKumar Parc Residences - C Mhada
- TypeResidential / Group Housing
- Location
- Mundhwa Kharadi Road
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047940
- ReraGenie IDRG-MH-56853
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Dec 2022
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Nov 2025)
- Buildings1 building record
- Documents filed113 files
Current status
Figures as on 26 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kumar Parc Residences - C Mhada | NA | 15 | 14 | 140 | 0 | 140 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 9 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.
Kumar Parc Residences - C Mhada: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed221
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kumar Parc Residences - C Mhada | NA | Rs 22.10 cr | Rs 15.56 cr |
| - | NA | Rs 5.37 cr | Rs 4.06 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal J Deshpande |
| Engineer | Harshad Pendse |
| Chartered Accountant | Supriya Mundada |
| Chartered Accountant | GMKS & Co. Chartered Accountants |
| Partner | Role in project |
|---|---|
| Kumar Properties Infratech Developers Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 08/06/2026 and we have also initiated the process for the possession as well. In view of this as the said project obtained full OC uploading consents from allottees will not be required. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring timely execution, and addressing any issues that may arise. This proactive approach aims to ensure a
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 325/2011 | Civil Judge Senior Division | Pending |
| 325/2011 | Civil Judge | Ongoing |
Complaints filed with MahaRERA15
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603725 | Gopesh Kailas Mitkar | Kumar Properties Infratech Developers Pvt Ltd | 17/06/2026 |
| CC12603953 | Prashant Keshav Shelar | Kumar Properties Infratech Developers Pvt Ltd | 25/06/2026 |
| CC12603796 | Samadhan Sunil Shinde | Kumar Properties Infratech Developers Pvt Ltd | 19/06/2026 |
| CC12603811 | Ganesh Navnath Saruk | Kumar Properties Infratech Developers Pvt Ltd | 20/06/2026 |
| CC12603830 | JAYVANT BABARAM CHOUKULKAR | Kumar Properties Infratech Developers Pvt Ltd | 20/06/2026 |
| CC12603888 | Mohammed Arzan Saleh Mohammed Momin | Kumar Properties Infratech Developers Pvt Ltd | 23/06/2026 |
| CC12603921 | M Nasir M Mansur Abla | Kumar Properties Infratech Developers Pvt Ltd | 24/06/2026 |
| CC12603931 | Pramila Amit Kowe | Kumar Properties Infratech Developers Pvt Ltd | 25/06/2026 |
| CC12604412 | Dinesh Nanasaheb Narale | Kumar Properties Infratech Developers Pvt Ltd | 15/07/2026 |
| CC12604517 | Dattatray Ramdas Lokhande | Kumar Properties Infratech Developers Pvt Ltd | 18/07/2026 |
| CC12604558 | Mahesh Mohan Mane | Kumar Properties Infratech Developers Pvt Ltd | 20/07/2026 |
| CC12604623 | Laxmi Meet Vithalani | Kumar Properties Infratech Developers Pvt Ltd | 23/07/2026 |
| CC12605236 | Sourabh Parshuram Gaikwad | Kumar Properties Infratech Developers Pvt Ltd | 17/08/2026 |
| CC12605330 | Ashish Laxman Tayade | Kumar Properties Infratech Developers Pvt Ltd | 21/08/2026 |
| CC12605338 | onkar suryabhan lohokare | Kumar Properties Infratech Developers Pvt Ltd | 21/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Architect Certificate.pdf | 26 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf | 26 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf | 26 Aug 2026 |
| Occupational CertificateFile: Occupancy Certificate.pdf | 26 Aug 2026 |
| Occupational CertificateFile: OC Verification Mail.pdf | 26 Aug 2026 |
| Occupational CertificateFile: Commencement Certificate.pdf | 26 Aug 2026 |
| Occupational CertificateFile: CC Plan.pdf | 26 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - March 2026.pdf | 25 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - March 2026.pdf | 25 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - March 2026.pdf | 25 Aug 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 17 Jul 2026 |
| Form 2A (FY 2022-2023)File: 4_Form 2A March 2023.pdf | 12 Jun 2026 |
| Form 2A (FY 2023-2024)File: 4_Form 2A March 2024.pdf | 12 Jun 2026 |
| Form 2A (FY 2024-2025)File: 4_Form 2A March 2025.pdf | 12 Jun 2026 |
| Form 2A (FY 2025-2026)File: 4_Form 2A March 2026.pdf | 12 Jun 2026 |
| Layout approvalFile: 1_260306_Building Layout.pdf | 2 Apr 2026 |
| Building plan approvalFile: 2_260306_Parking Layout Basement.pdf | 2 Apr 2026 |
| Building plan approvalFile: 3_260306_ Podium Parking Layout.pdf | 2 Apr 2026 |
| Building plan approvalFile: 4_260306_Building C-LIG Floor Plans.pdf | 2 Apr 2026 |
| Building plan approvalFile: 5_260306_Building C-LIG-Floor Plans.pdf | 2 Apr 2026 |
| Building plan approvalFile: 6_260306_Building C-LIG-Sect Ele.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA certificate_Signed.pdf | 16 Oct 2025 |
| Layout approvalFile: 250811_Layout_1.pdf | 26 Sep 2025 |
| Layout approvalFile: 250811_Layout_2.pdf | 26 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Parc Residences_C_Signed.pdf | 23 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-Parc Residences c Mhad March 24.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cel.pdf | 8 Mar 2024 |
| Layout approvalFile: 240127_Layout.pdf | 12 Feb 2024 |
| Building plan approvalFile: 240127_Sheet 11_Bldg C_1st Fl Pl.pdf | 12 Feb 2024 |
| Building plan approvalFile: 240127_Sheet 12_Bldg C_Fl and Ref Pl.pdf | 12 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 240127_Layout.pdf | 12 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240127_Sheet 11_Bldg C_1st Fl Pl.pdf | 12 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240127_Sheet 12_Bldg C_Fl and Ref Pl.pdf | 12 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 240127_CC.pdf | 12 Feb 2024 |
| Declaration about Commencement CertificateFile: 240212_C_Declaration about CC.pdf | 12 Feb 2024 |
| Proforma of Agreement for saleFile: 240202_C_Agreement for Sale_R7.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Cost Working.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 60_Kumar Parc Residences C Mhada.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2023 |
| Layout approvalFile: 230427_Layout.pdf | 27 Apr 2023 |
| Building plan approvalFile: 230426_Sheet No 9_Bldg C_1st FL Pl.pdf | 27 Apr 2023 |
| Building plan approvalFile: 230426_Sheet No 10_Bldg C_Flr and Ref Pl.pdf | 27 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 230427_Layout.pdf | 27 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230426_Sheet No 9_Bldg C_1st FL Pl.pdf | 27 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230426_Sheet No 10_Bldg C_Flr and Ref Pl.pdf | 27 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 230426_CC.pdf | 27 Apr 2023 |
| Declaration about Commencement CertificateFile: 230426_C_Declaration about CC.pdf | 27 Apr 2023 |
| Proforma of Agreement for saleFile: 230426_C_Agreement for Sale_R6.pdf | 27 Apr 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Kumar Parc Residences - A2P52100055344 | Magarpatta, Pune | 360 | Mar 2024 | Certificate Signed | May 2028 | Not due yet |
| Kumar Parc Residences - B2P52100049839 | Magarpatta, Pune | 230 | Mar 2023 | Certificate Signed | Dec 2027 | Not due yet |
| Kumar Parc residences - A1P52100032022 | Hadapsar, Pune | 360 | Dec 2021 | Certificate Signed | Nov 2026 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
Keep Kumar Parc Residences - C Mhada on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hadapsar13,700+ in Pune
Filed coordinates, straight-line distance. 196 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: Kumar Properties Infratech Developers Pvt Ltd
Kumar Properties Infratech Developers Pvt Ltd has 5 registrations on MahaRERA, including Kumar Parc residences - A1 and Kumar Parc Residences - C Mhada. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kumar Parc Residences - C Mhada is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kumar Parc Residences - C Mhada?
The registered promoter entity is Kumar Properties Infratech Developers Pvt Ltd, a company as per the filing. Its CIN U45209PN2019PTC183489 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kumar Parc Residences - C Mhada?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kumar Parc Residences - C Mhada?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kumar Parc Residences - C Mhada?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kumar Parc Residences - C Mhada?
The professionals named in the filing: Architect: Vishal J Deshpande; Engineer: Harshad Pendse; Chartered Accountant: Supriya Mundada; Chartered Accountant: GMKS & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kumar Parc Residences - C Mhada?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback