Home / Browse projects / Pune, Maharashtra / Kumar Parc Residences - B2

Registered Litigation declared Residential / Group Housing project

Kumar Parc Residences - B2

By Kumar Properties Infratech Developers Pvt Ltd

RG-MH-43763 · RERA P52100049839 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 104.98 crore secured on the land, in favour of Piramal Enterprises Ltd, Piramal Finance Ltd

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 97%
9 of 230Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

Kumar Parc Residences - B2 is a Residential / Group Housing project by Kumar Properties Infratech Developers Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100049839 on 6 Mar 2023. Possession is promised by 31 Dec 2027. 221 of the 230 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameKumar Parc Residences - B2
  • TypeResidential / Group Housing
  • Location
    • Hadapsar Mundhwa Road
    • Magarpatta
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049839
  • ReraGenie IDRG-MH-43763

Builder

  • NameKumar Properties Infratech Developers Pvt Ltd
  • Entity typeCompany
  • CINU45209PN2019PTC183489
  • DirectorHitesh Kewalkumar Jain
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed128 files

Current status

96%221 of 230 units booked
60.0%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B2 - A WingNA31291150115
B2 - B WingNA31291150115

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 97%.

B2 - A Wing65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B2 - B Wing61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises53%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.44%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed227

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots227
Closed/Covered227
BuildingClosed/CoveredTotal
B2 - A Wing114114
B2 - B Wing113113

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area40,500 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPiramal Enterprises Ltd, Piramal Finance Ltd
Secured amountRs 104.98 crore
CERSAI search filedYes
Declared on24 Dec 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI26890.69
Proposed, not sanctioned26,891 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP HOUSING SOCIETYGEN. THIMAYA RAODEAST STREET CAMPPUNEMAHARASHTRA411001
Estimated costRs 123.48 cr
Cost incurredRs 74.11 cr
Work done60.02%
BuildingWingEstimatedIncurred
B2 - A WingNARs 46.93 crRs 28.31 cr
B2 - B WingNARs 46.75 crRs 28.12 cr
-NARs 29.80 crRs 17.68 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal J Deshpande
EngineerHarshad Pendse
EngineerAmit Shilimkar
Chartered AccountantSupriya Mundada
Chartered AccountantGMKS & Co. Chartered Accountants
PartnerRole in project
Kumar Properties Infratech Developers Pvt Ltd-

Litigation declared2

CaseCourtStatus
325/2011Civil Judge Senior DivisionPending
325/2011Civil Judge Junior DivisionOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1_260306_Building Layout_1.pdf26 May 2026
Building plan approvalFile: 2_260306_Basement Parking Plan.pdf26 May 2026
Building plan approvalFile: 3_260306_Podium Parking Plan.pdf26 May 2026
Building plan approvalFile: 4_260306_Building Plan_typ fl.pdf26 May 2026
Building plan approvalFile: 5_260306_Building Plan_29 fl.pdf26 May 2026
Building plan approvalFile: 5_260306_Section.pdf26 May 2026
Building plan approvalFile: 6_260306_Elevation.pdf26 May 2026
Layout approvalFile: 250811_Layout_1.pdf26 May 2026
Form 2A (FY 2025-2026)File: 5_Form 2A March 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf18 Apr 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf18 Apr 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf18 Apr 2026
Building plan approvalFile: 240109_B2_Stilt typ fl.pdf15 Jan 2026
Building plan approvalFile: 240826_B2_Stilt Typ Fl Pl.pdf15 Jan 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf13 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf13 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf13 Jan 2026
Layout approvalFile: 240109_Layout.pdf16 Dec 2025
Building plan approvalFile: 240109_B Park Plan.pdf16 Dec 2025
Building plan approvalFile: 240109_Pod Park Plan.pdf16 Dec 2025
Building plan approvalFile: 240109_B2_2nd & ref fl.pdf16 Dec 2025
Building plan approvalFile: 240109_B2_29th & terr fl.pdf16 Dec 2025
Building plan approvalFile: 240109_B2_Section.pdf16 Dec 2025
Building plan approvalFile: 240109_B2_Elevation.pdf16 Dec 2025
Layout approvalFile: 240826_Layout.pdf16 Dec 2025
Building plan approvalFile: 240826_B Park Plan.pdf16 Dec 2025
Building plan approvalFile: 240826_Pod Park Plan.pdf16 Dec 2025
Building plan approvalFile: 240826_B2_2nd Ref Fl Pl.pdf16 Dec 2025
Building plan approvalFile: 240826_B2_29th Terr Fl Pl.pdf16 Dec 2025
Building plan approvalFile: 240826_B2_Section.pdf16 Dec 2025
Building plan approvalFile: 240826_B2_Elevation.pdf16 Dec 2025
Building plan approvalFile: 240826_Layout.pdf26 Nov 2025
Building plan approvalFile: 240826_B2_Stilt Typ Fl Pl.pdf26 Nov 2025
Building plan approvalFile: 240826_B2_29th Terr Fl Pl.pdf26 Nov 2025
Building plan approvalFile: 240826_B2_2nd Ref Fl Pl.pdf26 Nov 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf16 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf16 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate.pdf16 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate.pdf16 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf16 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Parc Resi B2.pdf30 Sep 2025
Layout approvalFile: 250811_Layout_1.pdf26 Sep 2025
Layout approvalFile: 250811_Layout_2.pdf26 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed (1).pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: 5_disclosure of Sold Inventory.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-Parc Residences B2 March 24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory_compressed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 15_Kumar Parc Residences - B2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed (2).pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Layout approvalFile: 240127_Layout.pdf12 Feb 2024
Building plan approvalFile: 240127_Sheet 14_B2_Stilt typ fl.pdf12 Feb 2024
Copy of Layout Approval (in case of layout)File: 240127_Layout.pdf12 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 240127_Sheet 14_B2_Stilt typ fl.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 240127_CC.pdf12 Feb 2024
Declaration about Commencement CertificateFile: 240212_B2_Declaration about CC.pdf12 Feb 2024
Proforma of Agreement for saleFile: 240202_B2_Agreement for Sale_R4.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: 15_Kumar Parc Residences - B2.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_B2.pdf20 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kumar Parc Residences - A2P52100055344Magarpatta, Pune360Mar 2024Certificate SignedMay 2028Not due yet
Kumar Parc residences - A1P52100032022Hadapsar, Pune360Dec 2021Certificate SignedNov 2026Not due yet
Kumar Parc Residences - C MhadaP52100047940Hadapsar, Pune140Dec 2022Certificate SignedNov 2025Not delivered

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kumar Parc Residences - B2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Magarpatta13,700+ in Pune

2 kmKumar Parc Residences - Completed 82Lapsed / revoked 23Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: Kumar Properties Infratech Developers Pvt Ltd

Kumar Properties Infratech Developers Pvt Ltd has 5 registrations on MahaRERA, including Kumar Parc residences - A1 and Kumar Parc Residences - C Mhada. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kumar Parc Residences - B2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kumar Parc Residences - B2?

The registered promoter entity is Kumar Properties Infratech Developers Pvt Ltd, a company as per the filing. Its CIN U45209PN2019PTC183489 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kumar Parc Residences - B2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kumar Parc Residences - B2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kumar Parc Residences - B2?

The professionals named in the filing: Architect: Vishal J Deshpande; Engineer: Harshad Pendse; Engineer: Amit Shilimkar; Chartered Accountant: Supriya Mundada; Chartered Accountant: GMKS & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kumar Parc Residences - B2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kumar Parc Residences - B2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kumar Parc Residences - B2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.