Home / Browse projects / Pune, Maharashtra / Kumar Palladium Plaza
Kumar Palladium Plaza
RG-MH-22424 · RERA P52100032535 · Last updated on MahaRERA portal: 19 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Completion date moved by 48 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kumar Palladium Plaza is a Commercial project by GAGAN GLOBAL DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100032535 on 10 Jan 2022. Possession is promised by 31 Dec 2029. The completion date has moved by 48 months from the original filing. 158 of the 261 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameKumar Palladium Plaza
- TypeCommercial
- Location
- Nagar Road
- Near D cathlon Showroom
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032535
- ReraGenie IDRG-MH-22424
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Jan 2022
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed111 files
Current status
Figures as on 19 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kumar Palladium Plaza Commercial | NA | 5 | 5 | 0 | 261 | 261 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Kumar Palladium Plaza Commercial: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed261
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kumar Palladium Plaza Commercial | NA | Rs 76.84 cr | Rs 52.60 cr |
| - | NA | Rs 76.84 cr | Rs 52.60 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A DESIGN STUDIO Ar Mangesh Gotal |
| Engineer | Mr Abhijeet Shekhar |
| Chartered Accountant | ABHISHEK TAPARIA & ASSOCIATES |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | S P A K & CO |
| Partner | Role in project |
|---|---|
| GAGAN GLOBAL DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in completion of the project "KUMAR PALLADIUM PLAZA" bearing Maha RERA Registration No. P52100032535 is primarily attributable to a combination of unforeseen and unavoidable circumstances beyond our control. The project execution was significantly impacted due to disruptions in construction activities arising from regulatory approvals and procedural delays from concerned authorities. Additionally, intermittent shortages of construction materials, escalation in material costs, and labour availability constraints further slowed the progress of work. Moreover, the after-effects of the C
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1853/2022 | Joint Civil Judge Senior Division Pune | on Evidence stage |
| 1853/2022 | JOINT CIVIL JUDGE SENIOR DIVISION | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Apr 2025
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: GGD Form 1 Kumar Palladium Plaza.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: Palladium Plaza Engineers Certificate.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: GGD KP Form 3 June 2026.pdf | 19 Aug 2026 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 15 Jul 2026 |
| Form 5 (FY 2022-2023)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Palladium Plaza_Form 1_Mar 26.pdf | 12 Jun 2026 |
| Withdrawal Update Form 2File: Palladium_Form 2_March 26.pdf | 12 Jun 2026 |
| Withdrawal Update Form 3File: GGD Kumar Palladium Plaza form-3 Sep-25_compressed.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: Palladium Plaza_Form 1_Sep 25.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Palladium_Form 2_Sep 25.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: GGD Kumar Palladium Plaza form-3 Sep-25_compressed.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: Form 1 K Palladium Plaza.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Palladium_Form 2_June 25.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: GGD Kumar Palladium Plaza form-3 Jun-25_compressed.pdf | 18 May 2026 |
| Form 1File: Form 1 - Palladium Plaza.pdf | 4 Feb 2026 |
| Form 2File: Form 2 - Palladium Plaza.pdf | 4 Feb 2026 |
| Form 3File: Form 3 - Palladium Plaza.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Data - Palladium Plaza_compressed.pdf | 4 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K Palladium Plaza.pdf | 29 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palladium Plaza_compressed.pdf | 26 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC - Palladium Plaza.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palladium Plaza Engineer's Certificate.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palladium plaza.PDF | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory Plaza.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan-March 2024 - Palladium Plaza.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kumar Palladium Plaza Form-3_compressed.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 K Palladium Plaza.PDF | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palladium Plaza Engineers Certificate.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Palladium Plaza Sold unsold compressed_compressed.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gagan Global Devlopment Form 3 March 2023_compressed.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Palladium Plaza.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kumar palladium plaza.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Palladium Plaza.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Palladium Plaza.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palladium Plaza Form 2.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Palladium Plaza - 12-23 quarter.PDF | 20 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palladium Plaza - 9-23 quarter.PDF | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold - K Palladium Plaza - 3-2023 quarter.pdf | 20 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Palladium Plaza - 2022-2023.PDF | 20 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Palladium Plaza.PDF | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palladium Plaza_compressed.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Palladium Plaza.PDF | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palladium Plaza.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palladium Plaza.pdf | 17 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palladium plaza.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palladium Plaza.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Palladium Plaza Clubbed_compressed.pdf | 15 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24 - Palladium Plaza.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24 - Palladium Plaza.pdf | 24 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-22 - Palladium Plaza.pdf | 26 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23 - Palladium Plaza.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Kumar Palladium Plaza.pdf | 12 Apr 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC - Format D - Palladium Plaza - Application for change.pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palladium Plaza.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Palladium Plaza.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Palladium Plaza.pdf | 8 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration - Legal Encumbrances.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Declaration - Legal Encumbrances.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Palladium Plaza.PDF | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palladium Plaza_Engineer's Certificate.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Palladium Plaza 1.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Palladium Plaza 2.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Palladium Plaza.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Palladium Plaza.PDF | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palladium Plaza_Engineer's Certificate.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Palladium Plaza 1.PDF | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Palladium Plaza 2.PDF | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Palladium Plaza.PDF | 29 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Palladium Plaza.PDF | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Kumar Palladium Plaza 1.PDF | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Kumar Palladium Plaza 2.PDF | 19 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Palladium Plaza Commercial - 2021-22.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Palladium Plaza Commercial - 2022-23.pdf | 7 Jul 2023 |
| Layout approvalFile: Layout_compressed.pdf | 8 May 2023 |
| Building plan approvalFile: Basement and ground floor_compressed.pdf | 8 May 2023 |
| Building plan approvalFile: Second and Terrace Floor_compressed.pdf | 8 May 2023 |
| Building plan approvalFile: First Floor_compressed.pdf | 8 May 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 8 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement and ground floor_compressed.pdf | 8 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kumar Palladium Plaza on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near D cathlon Showroom13,700+ in Pune
Filed coordinates, straight-line distance. 119 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: GAGAN GLOBAL DEVELOPERS
GAGAN GLOBAL DEVELOPERS has 3 registrations on MahaRERA, including MICASAA PHASE 2 and Kumar Palladium Plaza. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kumar Palladium Plaza is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kumar Palladium Plaza?
The registered promoter entity is GAGAN GLOBAL DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAJFG2185K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kumar Palladium Plaza?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kumar Palladium Plaza?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kumar Palladium Plaza?
The professionals named in the filing: Architect: A DESIGN STUDIO Ar Mangesh Gotal; Engineer: Mr Abhijeet Shekhar; Chartered Accountant: ABHISHEK TAPARIA & ASSOCIATES; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: S P A K & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kumar Palladium Plaza?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback