Home / Browse projects / Nagpur, Maharashtra / KUKREJA EMBASSY-II

Registered No litigation declared Residential / Group Housing project

KUKREJA EMBASSY-II

By KUKREJA INFRASTRUCTURES

RG-MH-05212 · RERA P50500076706 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Nov 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
34 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

KUKREJA EMBASSY-II is a Residential / Group Housing project by KUKREJA INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500076706 on 21 Jun 2024. Possession is promised by 30 Nov 2028. 2 of the 36 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUKREJA EMBASSY-II
  • TypeResidential / Group Housing
  • Location
    • JARIPATKA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500076706
  • ReraGenie IDRG-MH-05212

Builder

  • NameKUKREJA INFRASTRUCTURES
  • Entity typePartnership
  • PartnerVIRENDRA GHANSHYAM KUKREJA
  • Other registrations7 more →
  • Completed2 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedNov 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jun 2024
  • Promised completion30 Nov 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

6%2 of 36 units booked
51.0%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUKREJA EMBASSY-IINA171336036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

KUKREJA EMBASSY-II: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises26%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.56%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes44%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes53%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes18%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes36%
Electrical meter room, sub-station, receiving stationYes48%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered71

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,851 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Ghanshyam Hasanand KukrejaNagpur (M Corp.)Nagpur
Virendra Ghanshyamdas KukrejaNagpur (M Corp.)Nagpur
Shravan Ghanshyamdas KukrejaNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION (NMC)
Permissible FSI7037.94
Proposed, not sanctioned6,638 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTiranga Square, Nandanvan Road, Nagpurcity, Nagpur-440024
Estimated costRs 23.56 cr
Cost incurredRs 12.01 cr
Work done51.0%
BuildingWingEstimatedIncurred
KUKREJA EMBASSY-IINARs 23.56 crRs 12.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR LOKESH KADU
EngineerVIKRANT CHAUBEY
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantK.P. SAHASRABUDHE & CO.
Chartered AccountantVINOD VISHAL & ASSOCIATES
PartnerRole in project
KUKREJA INFRASTRUCTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1.pdf23 Apr 2026
Form 2File: FORM-2.pdf23 Apr 2026
Form 3File: FORM-3.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD.pdf23 Apr 2026
Form 1File: FORM-1.pdf23 Apr 2026
Form 2File: FORM-2.pdf23 Apr 2026
Form 3File: FORM-3.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD.pdf23 Apr 2026
Form 1File: FORM-1.pdf23 Apr 2026
Form 2File: FORM-2.pdf23 Apr 2026
Form 3File: FORM-3.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD.pdf23 Apr 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 KUKREJA EMBASSY-2 SCANNED AND SIGNED.pdf19 Apr 2026
Withdrawal Update Form 2File: KUKREJA EMBASSY-II_DEC-24.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3_DEC-24.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 KUKREJA EMBASSY-2 SCANNED AND SIGNED.pdf20 Jan 2026
Withdrawal Update Form 2File: KUKREJA EMBASSY-II_DEC-24.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3_DEC-24.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1 JUN-25 GENERATED.pdf3 Nov 2025
Withdrawal Update Form 1File: FORM-1 SEPT-25 KUKREJA EMBASSY-2 SCANNED AND SIGNED.pdf3 Nov 2025
Withdrawal Update Form 2File: KUKREJA EMBASSY-II_DEC-24.pdf3 Nov 2025
Withdrawal Update Form 2File: KUKREJA EMBASSY-II_DEC-24.pdf3 Nov 2025
Withdrawal Update Form 3File: FORM-3_DEC-24.pdf3 Nov 2025
Withdrawal Update Form 3File: FORM-3_DEC-24.pdf3 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KE-2 Quality Assurance 2024-25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KE2 Architects certificate.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kukreja Embassy 2 ca certificate 31 Dec 2024.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Kukreja embassy 2 sold-booked inventory 30 June 2024.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Kukreja embassy 2 sold-booked inventory 30 Sep 2024.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Kukreja embassy 2 sold-booked inventory 31 Dec 2024.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Kukreja embassy 2 sold-booked inventory 31 Mar 2025.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EMBASSY II_002739.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Embassy 2_S-24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kukreja Embassy-II_Form-1- Architect Certificate_June-24.pdf3 Aug 2024
Declaration about Commencement CertificateFile: form d_Embassy-2.pdf12 Jun 2024
Declaration in FORM BFile: 3 Declaration in FORM B (1).pdf12 Jun 2024
CERSAI detailsFile: cersai.pdf12 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Kukreja Embassy-II (1).pdf12 Jun 2024
Proforma of Agreement for saleFile: ATS- EMBASSY 2.pdf12 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (14).pdf12 Jun 2024
Other - LegalFile: Sohanlal Jaggi.pdf12 Jun 2024
Other - LegalFile: Suchetsingh Bhullar N.pdf12 Jun 2024
Other - LegalFile: Baniya plot1-30.pdf12 Jun 2024
Other - LegalFile: Baniya plot-31-61.pdf12 Jun 2024
Other - LegalFile: AOD.pdf12 Jun 2024
Other - TechnicalFile: AOD.pdf12 Jun 2024
Other - TechnicalFile: AGREEMENT.pdf12 Jun 2024
Other - TechnicalFile: POWER.pdf12 Jun 2024
Proforma of Allotment letterFile: ALLOTMENT.pdf11 Jun 2024
Other - LegalFile: AGREEMENT.pdf11 Jun 2024
Other - LegalFile: POWER.pdf11 Jun 2024
Other - FinanceFile: POWER.pdf11 Jun 2024
Other - TechnicalFile: Decleration Cum Underteking.pdf11 Jun 2024
Declaration in FORM BFile: Form B Ghanshyamdas Kukreja.pdf7 Jun 2024
Building plan approvalFile: E SANCTION MAP EMBASSY2 PDF-1.pdf6 Jun 2024
Building plan approvalFile: E SANCTION MAP EMBASSY2 PDF-2.pdf6 Jun 2024
Building plan approvalFile: E SANCTION MAP EMBASSY2 PDF-3.pdf6 Jun 2024
Layout approvalFile: E SANCTION MAP EMBASSY2 PDF-1.pdf6 Jun 2024
PAN CardFile: PAN Card.pdf6 Jun 2024
Copy of the legal title reportFile: Search Report Emabssy 2_.pdf6 Jun 2024
Details of encumbrances concerned to FinanceFile: ENCUM_FINANCE.pdf6 Jun 2024
Details of encumbrances concerned to FinanceFile: Encumberance Legal.pdf6 Jun 2024
Details of encumbrances concerned to LegalFile: ENCUM_FINANCE.pdf6 Jun 2024
Details of encumbrances concerned to LegalFile: Encumberance Legal.pdf6 Jun 2024
Copy of Layout Approval (in case of layout)File: E SANCTION MAP EMBASSY2 PDF-1.pdf6 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E SANCTION MAP EMBASSY2 PDF-1.pdf6 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E SANCTION MAP EMBASSY2 PDF-2.pdf6 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E SANCTION MAP EMBASSY2 PDF-3.pdf6 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: E PERMIT EMBASSY2 PDF.pdf6 Jun 2024
Declaration in FORM BFile: Form B Virendra Kukreja.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest - Virendra Partner.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest-Shravan Partner.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest- Ghanshamdas Land owner.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest-Virendra Land owner.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest-Shravan Landwoner.pdf6 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf6 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Decleration.pdf5 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Suncity IPlot No 6-7-8 Dixit Nagar Nagpur94CompletedNov 2017Jul 2017

How this compares with Nagpur

6%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUKREJA EMBASSY-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JARIPATKA2,800+ in Nagpur

2 kmKUKREJA EMBASSY-IICompleted 16Lapsed / revoked 7Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: KUKREJA INFRASTRUCTURES

KUKREJA INFRASTRUCTURES has 8 registrations on MahaRERA, including SUNCITY 2 and KUKREJA INFINITY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KUKREJA EMBASSY-II is delayed beyond 30 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUKREJA EMBASSY-II?

The registered promoter entity is KUKREJA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUKREJA EMBASSY-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUKREJA EMBASSY-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUKREJA EMBASSY-II?

The professionals named in the filing: Architect: AR LOKESH KADU; Engineer: VIKRANT CHAUBEY; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: K.P. SAHASRABUDHE & CO.; Chartered Accountant: VINOD VISHAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUKREJA EMBASSY-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUKREJA EMBASSY-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUKREJA EMBASSY-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.