ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / KUBER HEIGHTS

Registered No litigation declared Residential / Group Housing project

KUBER HEIGHTS

By NAYANTARA BUILDERS AND DEVELOPERS

RG-MH-55273 · RERA P51700047505 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 18 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 90%
41 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

KUBER HEIGHTS is a Residential / Group Housing project by NAYANTARA BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700047505 on 3 Nov 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 18 months from the original filing. 16 of the 57 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUBER HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • NEAR MADHVAI COLLEGE AYRE ROAD DOMBIVLI EAST
    • NEAR MADHAVI COLLEGE AYRE ROAD DOMBIVLI EAST
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700047505
  • ReraGenie IDRG-MH-55273

Builder

  • NameNAYANTARA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSARAVANAN SANKARAN NADAR, JITENDRA ASHOK CHAVAN, SANJAY GANPAT MADHAVI, VISHWAS TULSHIRAM PATIL, KAUSTUBH SOMNATH PATIL, ANITA MANOHAR KALAN, MANOHAR SHANTARAM KALAN

Key dates

this monthRegisteredNov 2022First promiseSep 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Nov 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed58 files

Current status

28%16 of 57 units booked
76.9%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KUBER HEIGHTSNA9749857

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

KUBER HEIGHTS: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,576 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Dec 2025
LandownerVillageDistrict
RAKESH BABU PATILDOMBIVLIThane
RANJANA RAMDAS PATILDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI2989.35
Proposed, not sanctioned2,045 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCOMMERCE CENTRE TANDON ROAD OPPOSITE PARKAR SADAN DOMBIVLI EAST 4210201
Estimated costRs 6.85 cr
Cost incurredRs 5.26 cr
Work done76.86%
BuildingWingEstimatedIncurred
KUBER HEIGHTSNARs 5.85 crRs 5.26 cr
-NARs 1.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUDAY MANSUKHLAL CHOPDA MANSUKHLAL CHOPDA
EngineerRAJESH THAKARE THAKARE
Chartered AccountantKAMLESH KALYANRAO DESHPANDE DESHPANDE
PartnerRole in project
NAYANTARA BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06012619313Sep 2025 → Mar 2027

Reason as filed by the promoterSHORTAGE OF MATERAILA AND LABOUR

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 2b2724aa-fc0d-4cb7-81b5-a1b00dc9576e.pdf30 Jun 2026
Withdrawal Update Form 2File: Ayre Rakesh patil engineers certificate_0001.pdf30 Jun 2026
Withdrawal Update Form 3File: 1313131.pdf30 Jun 2026
Withdrawal Update Form 1File: 2b2724aa-fc0d-4cb7-81b5-a1b00dc9576e.pdf4 Mar 2026
Withdrawal Update Form 1File: 2b2724aa-fc0d-4cb7-81b5-a1b00dc9576e.pdf4 Mar 2026
Withdrawal Update Form 2File: Ayre Rakesh patil engineers certificate_0001.pdf4 Mar 2026
Withdrawal Update Form 2File: Ayre Rakesh patil engineers certificate_0001.pdf4 Mar 2026
Withdrawal Update Form 3File: 1313131.pdf4 Mar 2026
Withdrawal Update Form 3File: 1313131.pdf4 Mar 2026
Withdrawal Update Form 1File: 2b2724aa-fc0d-4cb7-81b5-a1b00dc9576e.pdf23 Dec 2025
Withdrawal Update Form 1File: 2b2724aa-fc0d-4cb7-81b5-a1b00dc9576e.pdf23 Dec 2025
Withdrawal Update Form 2File: Ayre Rakesh patil engineers certificate_0001.pdf23 Dec 2025
Withdrawal Update Form 2File: Ayre Rakesh patil engineers certificate_0001.pdf23 Dec 2025
Withdrawal Update Form 3File: 1313131.pdf23 Dec 2025
Withdrawal Update Form 3File: 1313131.pdf23 Dec 2025
Form 1File: ARCHITECT RERA CERTIFICATE - 30-06-2025 (1).pdf19 Jul 2025
Form 2File: Form 2 Engineer (1).pdf19 Jul 2025
Form 3File: Kuber Heights CA certificate form 1_0001 - converted.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: eeeee.pdf19 Jul 2025
Form 1File: ARCHITECT RERA CERTIFICATE - 30-06-2025 (1).pdf19 Jul 2025
Form 2File: Form 2 Engineer (1).pdf19 Jul 2025
Form 3File: Kuber Heights CA certificate form 3 30-6-25_0001.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: eeeee.pdf19 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Nayantara Builders and developers disclosure other real estate Annexure A.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Nayantara Builders and Developers disclosure sold-booked inventory.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Nayantara Builders Developers Form 2A 20-21.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nayantara Builders Developers Form 2A 20-21.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nayantara Builders Developers Form 2A 20-21.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Nayantara Builders Developers F1orm 2A 22-23.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nayantara Builders and Developers architect certificate form 1.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kuber heights.pdf16 Sep 2022
Proforma of Agreement for saleFile: DRAFT.pdf24 Aug 2022
Proforma of Allotment letterFile: DRAFT.pdf24 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Document 53.pdf24 Aug 2022
Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf6 Aug 2022
Proforma of Agreement for saleFile: 2 Proforma of the allotment letter and agreement for sale.pdf6 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Nayantara builders developers separate bank account_0001.pdf6 Aug 2022
PAN CardFile: Nayantara builders developers pancard.pdf23 Jul 2022
Copy of the legal title reportFile: Legal Title Report Rakesh Patil.pdf23 Jul 2022
Details of encumbrances concerned to FinanceFile: ENCUMBARANCE TO FINANCE.pdf23 Jul 2022
Details of encumbrances concerned to LegalFile: ENCUMBARANCE TO LEGAL.pdf23 Jul 2022
CERSAI detailsFile: Nayantara builders developers Cersai letter.pdf23 Jul 2022
Deviation Report with respect to Allotment letterFile: Nayantara builders developers allotment letter.pdf23 Jul 2022
Layout approvalFile: BLUE PRINT PLAN RAKESH PATIL ONE.pdf4 Jul 2022
Layout approvalFile: KUBER HEIGHTS blue print plan11.pdf4 Jul 2022
Building plan approvalFile: BLUE PRINT PLAN RAKESH PATIL ONE.pdf4 Jul 2022
Building plan approvalFile: KUBER HEIGHTS blue print plan11.pdf4 Jul 2022
Copy of Layout Approval (in case of layout)File: BLUE PRINT PLAN RAKESH PATIL ONE.pdf4 Jul 2022
Copy of Layout Approval (in case of layout)File: KUBER HEIGHTS blue print plan11.pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PLAN RAKESH PATIL ONE.pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: KUBER HEIGHTS blue print plan11.pdf4 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Rakesh Patil Bandhkam prarambh pramanpatr_0001.pdf4 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Rakesh Patil Commencement Certificate_0001.pdf4 Jul 2022
Declaration about Commencement CertificateFile: Rakesh patil Declaration commencement certificate format D 1_0001.pdf4 Jul 2022
Declaration about Commencement CertificateFile: Rakesh patil Declaration commencement certificate format D 2_0001.pdf4 Jul 2022
Declaration in FORM BFile: Declaration Form B -Prashant M Shukla_0001.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE - NEW KUBER HEIGHTS (1) (1).pdf2 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ayre Rakesh patil engineers certificate_0001.pdf2 Jul 2022

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUBER HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR MADHAVI COLLEGE AYRE ROAD DOMBIVLI EAST7,600+ in Thane

Builder: NAYANTARA BUILDERS AND DEVELOPERS

NAYANTARA BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including KUBER HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KUBER HEIGHTS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUBER HEIGHTS?

The registered promoter entity is NAYANTARA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUBER HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUBER HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUBER HEIGHTS?

The professionals named in the filing: Architect: UDAY MANSUKHLAL CHOPDA MANSUKHLAL CHOPDA; Engineer: RAJESH THAKARE THAKARE; Chartered Accountant: KAMLESH KALYANRAO DESHPANDE DESHPANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUBER HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUBER HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUBER HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.