Home / Browse projects / Pune, Maharashtra / KUBER ANTONIA C WING
KUBER ANTONIA C WING
RG-MH-27672 · RERA P52100053142 · Last updated on MahaRERA portal: 16 Apr 2026
Source: official MahaRERA filing
Red flags
- Rs 10.00 crore secured on the land, in favour of SHRIRAM HOUSING FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUBER ANTONIA C WING is a Residential / Group Housing project by VIKAS VILAS BHALGAT in Pune, Maharashtra, registered with MahaRERA as P52100053142 on 17 Oct 2023. The registration is recorded completed; possession was promised by 24 Apr 2027. 53 of the 60 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameKUBER ANTONIA C WING
- TypeResidential / Group Housing
- Location
- PUNE MUMBAI HIGHWAY
- NEXT TO HOTEL TIPTOP
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053142
- ReraGenie IDRG-MH-27672
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Oct 2023
- Promised completion24 Apr 2027
- Revised completionNone
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 16 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C WING | NA | 15 | 12 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
C WING: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed70
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| MR SAMBHAJI GANGARAM BHANDARE | Pune (M Corp.) | Pune |
| MR DILIP GANGARAM BHANDARE | Pune (M Corp.) | Pune |
| MR VILAS GANGARAM BHANDARE | Pune (M Corp.) | Pune |
| MR VIJAY GANGARAM BHANDARE | Pune (M Corp.) | Pune |
| MR ARUN GANGARAN BHANDARE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C WING | NA | Rs 18.00 cr | Rs 17.64 cr |
| - | NA | Rs 1.00 cr | Rs 1.00 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECT ASSOCIATES |
| Architect | Cubix Architects Associates |
| Engineer | G A BHILARE CONSULTANT PVT LTD |
| Engineer | DHANANJAY DINKAR DESAI |
| Chartered Accountant | RIAZ PATEL |
| Chartered Accountant | SPAK & CO |
| Chartered Accountant | SPAK & CO. |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| KUBER PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: PCMC mail for Kuber antonia D and C Occupancy varification.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: Architect certificate C wing 30-6-2025.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Architect certificate C wing 30-6-2025.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Architect certificate C wing 30-6-2025.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Engineer certificate C wing 30-12-2026.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: fORM 3 30-6-2025 c WING.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: fORM 3 30-9-2026 C wing.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: fORM 3 c WING 30-12-2025.pdf | 27 Mar 2026 |
| Occupational CertificateFile: oc.pdf | 27 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A c wing.pdf | 29 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for C wing.pdf | 10 May 2025 |
| Disclosure of sold/ booked inventoryFile: C Wing-3.pdf | 4 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality certificate C wing.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: work completion certificate of antonia C.pdf | 6 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Antonia C Wing_Mar 2024.pdf | 2 Dec 2024 |
| Details of encumbrancesFile: ENCUMBRANCES - KUBER ANTONIA.pdf | 10 Oct 2024 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 10 Oct 2024 |
| Details of encumbrancesFile: ENCUMBRANCES - KUBER ANTONIA.pdf | 10 Oct 2024 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 10 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE C 20-7-2024.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING C(2).pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUATITY ASSURANCE C Wing.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate C.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 22 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING c(1).pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20 C.pdf | 28 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22 C.pdf | 28 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 04 23 C.pdf | 28 Oct 2023 |
| Proforma of Agreement for saleFile: Final Agreement Draft C Building (1) (1).pdf | 19 Oct 2023 |
| Proforma of Agreement for saleFile: Model Agreement to sale Kuber Antonia-NEW.pdf | 18 Oct 2023 |
| Proforma of Agreement for saleFile: Model Agreement to sale new.pdf | 12 Oct 2023 |
| Copy of the legal title reportFile: Search_Title 153.pdf | 26 Sep 2023 |
| Layout approvalFile: sanction layout Kuber antonia_compressed.pdf | 13 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: sanction layout Kuber antonia_compressed.pdf | 13 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTIFICATE C.pdf | 13 Sep 2023 |
| Declaration about Commencement CertificateFile: Format -D.pdf | 13 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter.pdf | 6 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_Aggrement to sale.pdf | 6 Sep 2023 |
| Building plan approvalFile: sanction layout Kuber antonia.pdf | 29 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction layout Kuber antonia.pdf | 29 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf | 14 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 9 Feb 2023 |
| Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER - Copy (1).pdf | 3 Feb 2023 |
| Declaration in FORM BFile: form B.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest in Other Real Estate organisations.pdf | 27 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about saparate Bank account real estate project.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: encumburance legal.pdf | 17 Jan 2023 |
| Details of encumbrances concerned to LegalFile: encumburance legal.pdf | 17 Jan 2023 |
| Building plan approvalFile: C wing sanction layout.pdf | 22 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: C wing sanction layout.pdf | 22 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_C.pdf | 22 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca filled form 3_compressed (1).pdf | 22 Mar 2022 |
| PAN CardFile: VVB - PAN.pdf | 21 Mar 2022 |
| Details of encumbrancesFile: Non Incumbereances Declaration - Antonia 1.pdf | 21 Mar 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| KUBER IMPERIAP52100016321 | WAKAD, Pune | 106 | May 2018 | Completed | Apr 2024 | Dec 2022 |
| KUBER KUNJBANP52100001616 | Pune (M Corp.), Pune | 24 | Jul 2017 | Certificate Signed | Jul 2019 | Jul 2018 |
| KUBER MADHUKOSH | KOLHE MALA NARAYANGAON PUNE | 88 | - | Completed | Jun 2014 | Jun 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep KUBER ANTONIA C WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEXT TO HOTEL TIPTOP13,700+ in Pune
Filed coordinates, straight-line distance. 259 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: VIKAS VILAS BHALGAT
VIKAS VILAS BHALGAT has 9 registrations on MahaRERA, including KUBER KUNJBAN and KUBER IMPERIA. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if KUBER ANTONIA C WING is delayed beyond 24 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUBER ANTONIA C WING?
The registered promoter entity is VIKAS VILAS BHALGAT, an individual as per the filing. Its GSTIN 27AAUPB3631J1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUBER ANTONIA C WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUBER ANTONIA C WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUBER ANTONIA C WING?
The professionals named in the filing: Architect: CUBIX ARCHITECT ASSOCIATES; Architect: Cubix Architects Associates; Engineer: G A BHILARE CONSULTANT PVT LTD; Engineer: DHANANJAY DINKAR DESAI; Chartered Accountant: RIAZ PATEL; Chartered Accountant: SPAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUBER ANTONIA C WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback