KRISHNA SUMAN

By Krishna Suman

RG-MH-70202 · RERA P51400077311 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
50 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

KRISHNA SUMAN is a Residential / Group Housing project by Krishna Suman in Jalna, Maharashtra, registered with MahaRERA as P51400077311 on 6 Aug 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 3 months from the original filing. 6 of the 56 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA SUMAN
  • TypeResidential / Group Housing
  • Location
    • NEAR MANTHA ROAD
    • SUMAN RESIDENCY
    • Jalna (M Cl)
    • Jalna
    • 431203
  • Pincode431203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51400077311
  • ReraGenie IDRG-MH-70202

Builder

  • NameKrishna Suman
  • Entity typePartnership
  • PartnersBhaishree Infra and Facilities Management LLP, Ritesh Radhesham Mantri, Rahul Murarilal Gupta

Key dates

1 months past promisethis monthRegisteredAug 2024First promiseJun 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2026)
  • Buildings2 building records
  • Documents filed75 files

Current status

11%6 of 56 units booked
38.6%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA8036036
BNA7020020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

A71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Open Space102
BuildingOpen SpaceTotal
A6767
B3535

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,923 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sumandevi Bhagwandas SoniJalna (M Cl)Jalna

Approvals and building plan

Sanctioning authorityASST. DIRECTOR OF TOWN PLANNING JALNA CITY MUNCIPAL CORPORATION JALNA
Permissible FSI7309.62
Proposed, not sanctioned7,310 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchISHITA COMPLEX, SHOP NO.6,7,8, OPP.PATAL HANUMAN MANDIR, RAMNAGAR ROAD, NEAR SHIVAJI PUTALA, JALNA ,JALNA ,MAHARASHTRA PIN 431203
Estimated costRs 13.77 cr
Cost incurredRs 5.31 cr
Work done38.6%
BuildingWingEstimatedIncurred
ANARs 8.46 crRs 3.27 cr
BNARs 5.30 crRs 2.05 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Rajmane
EngineerRavindra Bansode
EngineerKaran Agrawal
Chartered AccountantPankaj Gilda
PartnerRole in project
Krishna Suman-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18072621790Jun 2026 → Sep 2026

Reason as filed by the promoterDelay in Supply of Vitrified Tiles due to Irregular Gas supply to tiles factories in Morbi

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 KRISHNA SUMAN.pdf7 Aug 2026
Withdrawal Update Form 2File: FORM 2 KRISHNA SUMAN.pdf7 Aug 2026
Withdrawal Update Form 3File: FORM 3 KRISHNA SUMAN NEW.pdf7 Aug 2026
Form 5 (FY 2025-2026)File: FORM 5 2026.pdf11 Jul 2026
Withdrawal Update Form 1File: FORM 1 KRISHNA SUMAN.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM 2 KRISHNA SUMAN.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM 3 KRISHNA SUMAN.pdf10 Jul 2026
Form 2A (FY 2024-2025)File: FORM 2A KRISHNA SUMAN 2025.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A KRISHNA SUMAN 2026.pdf10 Jul 2026
Form 1File: KRISHNA SUMAN FORM 1.pdf14 May 2026
Form 2File: KRISHNA SUMAN FORM 2.pdf14 May 2026
Form 3File: KRISHNA SUMAN FORM 3.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: KRISHNA SUMAN SOLD UNSOLD.pdf14 May 2026
Form 1File: KRISHNA SUMAN FORM 1.pdf14 May 2026
Form 2File: KRISHNA SUMAN FORM 2.pdf14 May 2026
Form 3File: KRISHNA SUMAN FORM 3.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: KRISHNA SUMAN SOLD UNSOLD.pdf14 May 2026
Form 1File: Form 1 SUMAN.pdf14 May 2026
Form 2File: FORM 2.pdf14 May 2026
Form 3File: FORM 3.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Krishna Suman Sold Unsold.pdf14 May 2026
Form 1File: FORM 1.pdf14 May 2026
Form 2File: Form 2.pdf14 May 2026
Form 3File: Form 3.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Krishna Suman Sold Unsold.pdf14 May 2026
Form 1File: FORM 1 KRISHNA SUMAN.pdf31 Dec 2025
Form 2File: FORM 2 KRISHNA SUMAN.pdf31 Dec 2025
Form 3File: FORM 3 KRISHNA SUMAN.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: KRISHNA SUMAN SOLD UNSOLD.pdf31 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 KRISHNA SUMAN.pdf31 Dec 2025
Withdrawal Update Form 1File: FORM 1 KRISHNA SUMAN.pdf26 Aug 2025
Withdrawal Update Form 1File: FORM 1 KRISHNA SUMAN.pdf26 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf26 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf26 Aug 2025
Withdrawal Update Form 3File: FORM 3 KRISHNA SUMAN.pdf26 Aug 2025
Withdrawal Update Form 3File: FORM 3 KRISHNA SUMAN.pdf26 Aug 2025
Form 1File: Form 1 Krishna Suman.pdf1 Jul 2025
Form 2File: FORM 2 KRISHNA SUMAN.pdf1 Jul 2025
Form 3File: FORM 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Krishna Suman Sold Unsold.pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Suman form 2.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 7 8 24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 28 12 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 9 12 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 7 8 2024.pdf31 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B BANK LETTER NEW.pdf1 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A New.pdf1 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured unsecured declaration.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Suman.pdf27 Jul 2024
Deviation Report with respect to Allotment letterFile: NO Devaialtion allotment.pdf23 Jul 2024
Deviation Report with respect to model copy of AgreementFile: No deviation copy of agreement.pdf23 Jul 2024
Declaration in FORM BFile: Form B RM.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Jul 2024
Other - LegalFile: IMG_0001.pdf12 Jul 2024
Other - TechnicalFile: IMG_0001.pdf12 Jul 2024
CERSAI detailsFile: Cersai R.pdf11 Jul 2024
Copy of the legal title reportFile: Search report new.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 pdf.pdf10 Jul 2024
Proforma of Allotment letterFile: Model Form of allotment letter New Format PDF.pdf10 Jul 2024
Declaration about Commencement CertificateFile: Declaration abt cmmncmrnt.pdf9 Jul 2024
Layout approvalFile: Layout Permission Suman (2 files merged) - converted-2.pdf7 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Permission Suman (2 files merged) - converted-2.pdf7 Jul 2024
Proforma of Agreement for saleFile: RERA agreement to sale draft pdf.pdf7 Jul 2024
Building plan approvalFile: Building Plan Joint.pdf4 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrancess.pdf4 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrancess.pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Joint.pdf4 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate - converted.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Ritesh Mantri.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Rahul Gupta.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Rameshbhai C Patel.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Bhavesh R Patel.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Taraben R Patel.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Kajal B Patel.pdf4 Jul 2024
PAN CardFile: Krishna Suman PAN Card.pdf27 Jun 2024

How this compares with Jalna

11%of this project is bookeddistrict median 0%
8%of Jalna projects moved their completion datethis one moved by 3 months
41%of Jalna registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Jalna projects on ReraGenie, from their own filings.

Keep KRISHNA SUMAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUMAN RESIDENCY100+ in Jalna

2 kmKRISHNA SUMANCompleted 4Lapsed / revoked 1Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Krishna Suman

Krishna Suman has 1 registration on MahaRERA, including KRISHNA SUMAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.

Frequently asked questions

What are my rights if KRISHNA SUMAN is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA SUMAN?

The registered promoter entity is Krishna Suman, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA SUMAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA SUMAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA SUMAN?

The professionals named in the filing: Architect: Hemant Rajmane; Engineer: Ravindra Bansode; Engineer: Karan Agrawal; Chartered Accountant: Pankaj Gilda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA SUMAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA SUMAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA SUMAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.