ReraGenieLog inGet a buyer report

Home / Browse projects / Jalna, Maharashtra / RUKHMINI HEIGHTS

Registered No litigation declared Others project

RUKHMINI HEIGHTS

By TIRUPATI INFRA JALNA

RG-MH-88915 · RERA P51400080917 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.
Mar 2031Possession promisedno revision filed
6 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 90%
93 of 93Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

RUKHMINI HEIGHTS is a Others project by TIRUPATI INFRA JALNA in Jalna, Maharashtra, registered with MahaRERA as P51400080917 on 14 Aug 2025. Possession is promised by 31 Mar 2031. 0 of the 93 units on this registration are recorded sold or booked, and 6 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRUKHMINI HEIGHTS
  • TypeOthers
  • Location
    • BHOKARDAN - RAJUR ROAD
    • JALNA
    • Jalna (M Cl)
    • 431203
  • Pincode431203
  • RERA no.P51400080917
  • ReraGenie IDRG-MH-88915

Builder

  • NameTIRUPATI INFRA JALNA
  • Entity typePartnership

Key dates

this monthRegisteredAug 2025PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2025
  • Promised completion31 Mar 2031
  • Revised completionNone
  • Buildings4 building records
  • Documents filed78 files

Current status

0%0 of 93 units booked
25.8%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1NA1111261440
A-2NA111128028
B-1NA66111021
B-2NA55404

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A-140%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
A-240%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
B-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Closed/Covered216
BuildingClosed/CoveredTotal
A-19696
A-27373
B-13737
B-21010

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,675 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
MR. SANJAY KACHRULAL RATHIJalna (M Cl)Jalna
MR. SHARAD PRALHADJI BAGDIYAJalna (M Cl)Jalna
MR. ABHAY LAXMANRAO KULKARNIJalna (M Cl)Jalna
MR SHIVRATAN SHRIGOPAL MUNDADAJalna (M Cl)Jalna
MRS SARLA SHIVRATAN MUNDADAJalna (M Cl)Jalna
MR. PIYUSH SHIVRATAN MUNDADAJalna (M Cl)Jalna
MRS POOJA PIYUSH MUNDADAJalna (M Cl)Jalna
RADHIKA SHARAD BAGDIYAJalna (M Cl)Jalna

Approvals and building plan

Sanctioning authorityJalna City Municipal Corporation
Permissible FSI9367.75
Proposed, not sanctioned9,368 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAGGIS BUILDING,NEAR KRANTI CHOWK,JALNA ROAD,AURANGABAD PIN 431005
Estimated costRs 34.64 cr
Cost incurredRs 8.92 cr
Work done25.75%
BuildingWingEstimatedIncurred
A-1NARs 12.73 crRs 4.23 cr
A-2NARs 12.73 crRs 4.23 cr
B-1NARs 3.91 cr-
B-2NARs 3.91 cr-
-NARs 1.36 crRs 45.33 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Sameer Ausekar
EngineerMr Milind Wadekar
Chartered AccountantYadkikar & Chandak
PartnerRole in project
TIRUPATI INFRA JALNA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600226Mrinal KatkarTIRUPATI INFRA JALNA04/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2031

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Form 1File: FORM 1 ARCH Sept 25.pdf30 Jan 2026
Form 2File: Form 2 30-09-2025.pdf30 Jan 2026
Form 3File: Form 3 Sept 25 - new.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 30-09-25.pdf30 Jan 2026
Form 1File: Form 1 Dec 2025.pdf30 Jan 2026
Form 2File: Form 2 Dec 2025.pdf30 Jan 2026
Form 3File: Form 3 Dec 25 - new.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold 31-12-25.pdf30 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate.PDF11 Aug 2025
Other - LegalFile: 35 Allottment Letter No deviation.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: BHAVSAR.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SHAILASH SIR.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ABHAY SIR.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VAZARKAR.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: PATIL.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DEEPAK.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: APPA.pdf16 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: AGRAWAL.pdf16 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: VERIFICATION CC.pdf15 Jul 2025
Other - LegalFile: 35 Allottment Letter No deviation.pdf15 Jul 2025
Other - LegalFile: 5-7.pdf15 Jul 2025
Other - LegalFile: 7-7.pdf15 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.PDF15 Jul 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank.pdf15 Jul 2025
Other - LegalFile: no deviation allotment .pdf14 Jul 2025
Deviation Report with respect to model copy of AgreementFile: no deviation ats.pdf14 Jul 2025
Other - LegalFile: ATS.pdf12 Jul 2025
Other - LegalFile: CC email.PDF8 Jul 2025
Copy of the legal title reportFile: SEARCH - converted.pdf25 Jun 2025
Proforma of Allotment letterFile: Rera Allotment Letter.pdf19 Jun 2025
Proforma of Agreement for saleFile: Rera ATS.pdf19 Jun 2025
Declaration about Commencement CertificateFile: Commencement Certificate Format D.PDF18 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.PDF18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form A.pdf12 Apr 2025
Details of encumbrances concerned to FinanceFile: Regarding Encumbrances.PDF11 Apr 2025
Declaration in FORM BFile: Notary Form B_compressed.pdf11 Apr 2025
CERSAI detailsFile: Cersai Report.PDF11 Apr 2025
Details of encumbrances concerned to LegalFile: Regarding Encumbrances.PDF11 Apr 2025
Other - TechnicalFile: Sunilkumar.PDF11 Apr 2025
Other - TechnicalFile: Sirsat.PDF11 Apr 2025
Other - TechnicalFile: Shivaji.PDF11 Apr 2025
Other - TechnicalFile: Shailesh.PDF11 Apr 2025
Other - TechnicalFile: Deepak.PDF11 Apr 2025
Other - TechnicalFile: Agrawal.PDF11 Apr 2025
Other - TechnicalFile: Abhay.PDF11 Apr 2025
Other - TechnicalFile: Dhananjay.PDF11 Apr 2025
Building plan approvalFile: Map 77_compressed.pdf9 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Map 77_compressed.pdf9 Apr 2025
Layout approvalFile: Layout_compressed.pdf26 Mar 2025
Building plan approvalFile: map 17.pdf26 Mar 2025
Building plan approvalFile: map 27.pdf26 Mar 2025
Building plan approvalFile: map 37_compressed.pdf26 Mar 2025
Building plan approvalFile: map 47_compressed.pdf26 Mar 2025
Building plan approvalFile: map 57_compressed.pdf26 Mar 2025
Building plan approvalFile: map 67_compressed.pdf26 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Letter Head.PDF26 Mar 2025
Details of encumbrances concerned to FinanceFile: Non Encumbrance Notory.PDF26 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 37_compressed.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 67_compressed.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 57_compressed.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 47_compressed.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 27.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: map 17.pdf26 Mar 2025
Details of encumbrances concerned to LegalFile: Non Encumbrance Notory.PDF26 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrances Letter Head.PDF26 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.PDF25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A.PDF25 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Discloser For Secured.PDF25 Mar 2025
Building plan approvalFile: NA Order.PDF20 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: NA Order.PDF20 Mar 2025
Other - LegalFile: PR Card_149 To 151.PDF20 Mar 2025
PAN CardFile: Pan Card_ Tirupati Infra.PDF18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A.PDF18 Mar 2025

How this compares with Jalna

0%of this project is bookeddistrict median 0%
8%of Jalna projects moved their completion datethis one has not
41%of Jalna registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Jalna projects on ReraGenie, from their own filings.

Keep RUKHMINI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JALNA100+ in Jalna

Builder: TIRUPATI INFRA JALNA

TIRUPATI INFRA JALNA has 1 registration on MahaRERA, including RUKHMINI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.

Frequently asked questions

What are my rights if RUKHMINI HEIGHTS is delayed beyond 31 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUKHMINI HEIGHTS?

The registered promoter entity is TIRUPATI INFRA JALNA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUKHMINI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUKHMINI HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUKHMINI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUKHMINI HEIGHTS?

The professionals named in the filing: Architect: Mr Sameer Ausekar; Engineer: Mr Milind Wadekar; Chartered Accountant: Yadkikar & Chandak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUKHMINI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUKHMINI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUKHMINI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.