Registration lapsed No litigation declared Others project

KRISHNA KUNJ APARTMENT

By SHRINATHJI BUILDERS

RG-MH-13880 · RERA P51600029244 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 95%
8 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

KRISHNA KUNJ APARTMENT is a Others project by SHRINATHJI BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600029244 on 10 May 2021. Possession was promised by 31 May 2026 and is now 5 months past that date. 22 of the 30 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA KUNJ APARTMENT
  • TypeOthers
  • Location
    • GANGAPUR ROAD
    • SERENE MEDOWS
    • Aanandwali
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600029244
  • ReraGenie IDRG-MH-13880

Builder

  • NameSHRINATHJI BUILDERS
  • Entity typePartnership
  • PartnersPANKAJ KAILASH PARASRAMPURIA, PRAMOD KAILASH PARASRAMPURIA, SANJAY GULAB CHAND GUPTA, MAHESH MEHARCHAND SINGLA

Key dates

5 months past promisethis monthRegisteredMay 2021PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 May 2021
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

73%22 of 30 units booked
88.8%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNA KUNJ APARTMENTNA272322830

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

KRISHNA KUNJ APARTMENT: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered40
Open Space16

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,217 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
HARIBHAU DHONDIRAM PHADOLNashikNashik
MRS HIRA HARIBHAU PHADOLNashikNashik
ANIRUDDHA HARIBHAU PHADOLNashikNashik
HARIBHAU DHONDIRAM PHADOL HUFNashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI8975.71
Proposed, not sanctioned8,976 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDINDORI NAKA,PANCHAVATI-422003
Estimated costRs 20.79 cr
Cost incurredRs 18.46 cr
Work done88.8%
BuildingWingEstimatedIncurred
KRISHNA KUNJ APARTMENTNARs 20.03 crRs 18.01 cr
-NARs 75.80 lakhRs 45.48 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT MKUMATH
EngineerSUMIT MKUMATH
EngineerShailesh P Dhumne
EngineerRoshan Sanjay Wagh
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra & Associates
Chartered AccountantSanvi & Associates
PartnerRole in project
SHRINATHJI BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jul 2023

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR - March 26.pdf19 Jun 2026
Withdrawal Update Form 2File: ER - March 26 .pdf19 Jun 2026
Withdrawal Update Form 3File: CA - March 26.pdf19 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Form 1- Dec 25.pdf7 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf7 Mar 2026
Withdrawal Update Form 3File: CA - DEC 25.pdf7 Mar 2026
Form 2A (FY 2023-2024)File: Form 2A March 2024.pdf9 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf9 Jan 2026
Form 5 (FY 2024-2025)File: RERA Audit report 24-25 final.pdf26 Nov 2025
Form 1File: AR - june 25.pdf18 Nov 2025
Form 2File: ER - june 25.pdf18 Nov 2025
Form 3File: CA - june 25-Final.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - june 25.pdf18 Nov 2025
Form 1File: AR - Sept 25.pdf18 Nov 2025
Form 2File: ER- sept 25.pdf18 Nov 2025
Form 3File: CA - sept 25-Final.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure- sept 25.pdf18 Nov 2025
Form 1File: AR - March 25.pdf8 Aug 2025
Form 2File: ER - March 25.pdf8 Aug 2025
Form 3File: CA - March 25 final.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31-3-25.pdf8 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: udin CA Cert Krushna Kunj-Sept-24_pages-to-jpg-0001 (1).pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sept 24.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: disclosure 30-9-2024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 24.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERT For DEC 24_compressed.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form -1.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Krishna Kunj.pdf1 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: final Audit Form 5 23-24.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30-06-23.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30-09-23.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 31-12-23.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 31-03-24.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30-06-24.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer certificate form 2A.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sept 23_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dec 23_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 24_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Mar 24_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 23_compressed.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Cert_Krushna Kunj_June 23.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Cert_Krushna Kunj_Sept 23.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Cert_Krushna Kunj_Dec 23.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Cert_Krushna Kunj_ March 24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Cert_Krushna Kunj_ June 24.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form-2 30-09-23.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form-2 30-06-24.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form - 2 31-03-24.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form-2 31-12-23.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form-2 30-06-23.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SNB Architect Certificate.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SNB Engineer Certificate.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: client signed copy -Final_compressed final.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Client signed copy (1) Final.pdf31 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf31 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit FY 21-22 Krishna Kunj.pdf23 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Krushna Kunj C.pdf3 Nov 2022
Building plan approvalFile: Plan 01 (1).pdf3 Aug 2022
Building plan approvalFile: Plan 02 (1).pdf3 Aug 2022
Building plan approvalFile: Plan 03 (1).pdf3 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 01 (1).pdf3 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 02 (1).pdf3 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 03 (1).pdf3 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate (1).pdf3 Aug 2022
Declaration about Commencement CertificateFile: Declaration.pdf11 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure.pdf11 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf11 Feb 2022
Declaration in FORM BFile: DECLARATION FORM B.pdf4 May 2021
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf30 Apr 2021
Proforma of Allotment letterFile: Agreement to Sale Draft.pdf30 Apr 2021
Building plan approvalFile: NA ORDER.pdf29 Apr 2021
Building plan approvalFile: BUILDING PLAN.pdf29 Apr 2021
Building plan approvalFile: BUILDING PLAN 1.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf29 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf29 Apr 2021
Layout approvalFile: LAYOUT.pdf28 Apr 2021
PAN CardFile: Shrinathji Builder.pdf28 Apr 2021

How this compares with Nashik

73%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA KUNJ APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SERENE MEDOWS4,100+ in Nashik

2 kmKRISHNA KUNJ APARTMENTCompleted 50Lapsed / revoked 11Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: SHRINATHJI BUILDERS

SHRINATHJI BUILDERS has 1 registration on MahaRERA, including KRISHNA KUNJ APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that KRISHNA KUNJ APARTMENT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KRISHNA KUNJ APARTMENT is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA KUNJ APARTMENT?

The registered promoter entity is SHRINATHJI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA KUNJ APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA KUNJ APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA KUNJ APARTMENT?

The professionals named in the filing: Architect: SUMIT MKUMATH; Engineer: SUMIT MKUMATH; Engineer: Shailesh P Dhumne; Engineer: Roshan Sanjay Wagh; Chartered Accountant: RSPH & Associates; Chartered Accountant: P N Sabadra & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA KUNJ APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA KUNJ APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA KUNJ APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.