Krishna Heights
RG-MH-96248 · RERA P51400077236 · Last updated on MahaRERA portal: 11 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Jalna registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Krishna Heights is a Residential / Group Housing project by Krishna Heights in Jalna, Maharashtra, registered with MahaRERA as P51400077236 on 31 Jul 2024. Possession is promised by 30 Apr 2027.
At a glance
Project
- NameKrishna Heights
- TypeResidential / Group Housing
- Location
- bypass road
- behind krishna mall
- Jalna (M Cl)
- Jalna
- 431203
- Pincode431203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51400077236
- ReraGenie IDRG-MH-96248
Builder
- NameKrishna Heights
- Entity typePartnership
- PartnersBhaishree Infra And Facilities Managment LLP, Ritesh Radhesham Mantri, Rahul Murarilal Gupta, Ajay Narayan Bhartiya, Poonam Ajay Bhartiya
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2024
- Promised completion30 Apr 2027
- Revised completionNone
- Buildings2 building records
- Documents filed69 files
Current status
Figures as on 11 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 8 | 0 | 0 | 0 | 0 |
| B | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 40%.
A40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 1 | 18 | 19 |
| B | 1 | 40 | 41 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B | NA | Rs 9.72 cr | Rs 3.68 cr |
| A | NA | Rs 5.47 cr | Rs 2.07 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hemant Rajmane |
| Engineer | Ravindra Bansode |
| Engineer | Karan Agrawal |
| Chartered Accountant | Pankaj Gilda |
| Partner | Role in project |
|---|---|
| Krishna Heights | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2027
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 KRISHNA HEIGHTS.pdf | 11 Jul 2026 |
| Form 2File: FORM 2 KRISHNA HEIGHTS.pdf | 11 Jul 2026 |
| Form 3File: FORM 3 KRISHNA HEIGHTS.pdf | 11 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD KRISHNA HEIGHTS.pdf | 11 Jul 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A KRISHNA HEIGHTS 2025.pdf | 11 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A KRISHNA HEIGHTS 2026.pdf | 11 Jul 2026 |
| Form 1File: KRISHNA HEIGHTS FORM 1.pdf | 14 May 2026 |
| Form 2File: KRISHNA HEIGHTS FORM 2.pdf | 14 May 2026 |
| Form 3File: KRISHNA HEIGHTS FORM 3.pdf | 14 May 2026 |
| Disclosure of Sold and Booked InventoryFile: KRISHNA HEIGHTS SOLD UNSOLD.pdf | 14 May 2026 |
| Form 1File: KRISHNA HEIGHTS FORM 1.pdf | 14 May 2026 |
| Form 2File: KRISHNA HEIGHTS FORM 2.pdf | 14 May 2026 |
| Form 3File: KRISHNA HEIGHTS FORM 3.pdf | 14 May 2026 |
| Disclosure of Sold and Booked InventoryFile: KRISHNA HEIGHTS SOLD UNSOLD.pdf | 14 May 2026 |
| Form 1File: Form 1.pdf | 14 May 2026 |
| Form 2File: FORM 2.pdf | 14 May 2026 |
| Form 3File: FORM 3.pdf | 14 May 2026 |
| Disclosure of Sold and Booked InventoryFile: krishna Heights Sold Unsold.pdf | 14 May 2026 |
| Form 1File: FORM 1 KRISHNA HEIGHTS.pdf | 31 Dec 2025 |
| Form 2File: FORM 2 KRISHNA HEIGHTS.pdf | 31 Dec 2025 |
| Form 3File: FORM 3 KRISHNA HEIGHTS.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: KRISHNA HEIGHTS SOLD UNSOLD.pdf | 31 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 KRISHNA HEIGHTS.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 KRISHNA HEIGHTS.pdf | 26 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 KRISHNA HEIGHTS.pdf | 26 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 HEIGHTS.pdf | 26 Aug 2025 |
| Form 1File: FORM 1 KRISHNA HEIGHTS.pdf | 1 Jul 2025 |
| Form 2File: FORM 2 KRISHNA HEIGHTS.pdf | 1 Jul 2025 |
| Form 3File: FORM 3 31 3 25.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: krishna Heights Sold Unsold.pdf | 1 Jul 2025 |
| Form 1File: Form 1 31 12 24.pdf | 2 Jun 2025 |
| Form 2File: Heights 31 12 24.pdf | 2 Jun 2025 |
| Form 3File: 31 12 24 form 3.pdf | 2 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Heights form 2.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31 12 24.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31 7 24 form 3.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 09 12 24 form 3.pdf | 31 Jan 2025 |
| CERSAI detailsFile: Undertaking No Cersai.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 New - converted.pdf | 10 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Rameshbhai C Patel.pdf | 3 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Bhavesh R Patel.pdf | 3 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Taraben R Patel.pdf | 3 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_A_ Kajal B Patel.pdf | 3 Jul 2024 |
| Other - TechnicalFile: Order No 50 Declaration new.pdf | 2 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure RG.pdf | 30 Jun 2024 |
| Proforma of Agreement for saleFile: RERA agreement to sale draft NEW2.pdf | 30 Jun 2024 |
| Proforma of Allotment letterFile: Model Form of allotment letter New Format 2.pdf | 30 Jun 2024 |
| Other - LegalFile: Krishna heights Sale Deed - converted-4.pdf | 30 Jun 2024 |
| Copy of the legal title reportFile: Search Report New.pdf | 26 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances.pdf | 26 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances.pdf | 26 Jun 2024 |
| Declaration in FORM BFile: B Form.pdf | 26 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Bhaishree Infra.pdf | 26 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Ajay Bhartiya.pdf | 26 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Poonam Bhartiya.pdf | 26 Jun 2024 |
| Layout approvalFile: LAYOUT.pdf | 25 Jun 2024 |
| Building plan approvalFile: Building plan merge.pdf | 25 Jun 2024 |
| PAN CardFile: Krishna Heights PAN Card.pdf | 25 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 25 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan merge.pdf | 25 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 25 Jun 2024 |
| Declaration about Commencement CertificateFile: Decalration about commencement certificate.pdf | 25 Jun 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200311394383_For_Debtor_Based_Search_25_06_2024_17_10_43_480.PDF | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Ritesh Mantri.pdf | 25 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Declaration.pdf | 25 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf | 25 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Copy Of Agreement.pdf | 25 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalna
Computed across the 100+ Jalna projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Krishna Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near behind krishna mall100+ in Jalna
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
VITTHALA TOWERS
TIRUPATI BUILDCON
SHREE SAI CITY PHASE-I
SHREE SAI CITY BUILDERS AND DEVELOPERS
JINDAL GOYAL SQUARE
JINDAL GOYAL REALITY LLP
Krishna Capital
Krishna Capital
Lalbag, Plotting
GO Developers LLP
RUKHMINI HEIGHTS
TIRUPATI INFRA JALNA
See every Jalna project, with the district possession charts
Builder: Krishna Heights
Krishna Heights has 2 registrations on MahaRERA, including Krishna Heights and Krishna Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalna district page.
Frequently asked questions
What are my rights if Krishna Heights is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Krishna Heights?
The registered promoter entity is Krishna Heights, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Krishna Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Krishna Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Krishna Heights?
The professionals named in the filing: Architect: Hemant Rajmane; Engineer: Ravindra Bansode; Engineer: Karan Agrawal; Chartered Accountant: Pankaj Gilda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Krishna Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback