KOHINOOR VIVA PIXEL- PHASE I
RG-MH-39820 · RERA P52100053030 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
- Completion date moved by 11 months
- 1 extension taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KOHINOOR VIVA PIXEL- PHASE I is a Residential / Group Housing project by RISING ASSOCIATES in DHANORI, 411015, registered with MahaRERA as P52100053030 on 10 Oct 2023. Possession is promised by 31 May 2027. The completion date has moved by 11 months from the original filing. 48 of the 112 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameKOHINOOR VIVA PIXEL- PHASE I
- TypeResidential / Group Housing
- Location
- S NO 5/15
- DHANORI
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053030
- ReraGenie IDRG-MH-39820
Builder
- NameRISING ASSOCIATES
- Entity typePartnership
- PartnersVINEET KRISHNAKUMAR GOYAL, RAJESH KRISHNAKUMAR GOYAL
- Other registrations12 more →
- Completed8 of 13
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Oct 2023
- Promised completion31 May 2027
- Revised completionRevised to 31 May 2027 (originally 30 Jun 2026)
- Buildings2 building records
- Documents filed87 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower C-D | NA | 8 | 7 | 56 | 0 | 56 |
| TOWER A-B | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
Tower C-D81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
TOWER A-B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed236
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower C-D | 118 | 118 |
| TOWER A-B | 118 | 118 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RAHUL SHIVAJIRAO KADAM | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower C-D | NA | Rs 19.82 cr | Rs 20.81 cr |
| TOWER A-B | NA | Rs 19.82 cr | Rs 20.81 cr |
| - | NA | Rs 2.94 cr | Rs 4.42 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK a architecture |
| Engineer | Planedge Consultants P Limited |
| Chartered Accountant | Vinod Nikam and Co |
| Chartered Accountant | BHANDARI S A A J & ASSOCIATES |
| Chartered Accountant | JAYESH N JAIN & ASSOCIATES |
| Partner | Role in project |
|---|---|
| RISING ASSOCIATES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOccupancy certificate of Project is in process as the work is 95% completed, only painting is in process. Photos of the same have been attached for your reference.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 101/2022 | Civil Court Pune | Pending |
| 101/2022/2022 | District and Sessions Court, Pune | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502851 | Pavan Dnyaneshwar Ramekar | RISING ASSOCIATES | 14/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Viva Pixel Phase I Form 05 _31-03-2026.pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A_Viva Pixel I.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Viva pixel 1.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 02_Viva Pixel I.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Form 03_Viva Pixel I.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - pixel 1.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 02_Viva Pixel Ph I.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 03_Viva Pixel I.pdf | 21 Apr 2026 |
| Layout approvalFile: 01-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 02-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 03-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 04-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 05-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 06-07.pdf | 3 Apr 2026 |
| Building plan approvalFile: 07-07.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_VIVA PIXEL I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 02_Viva Pixel Ph I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 03_Viva Pixel I.pdf | 20 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_Viva Pixel I.pdf | 29 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 05_Viva Pixel Ph I.pdf | 8 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1-VIVA PIXEL I.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 02_Viva pixel phase 1.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 03_Viva Pixel Ph I.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Viva pixel 1.pdf | 25 Jul 2025 |
| Withdrawal Update Form 2File: FORM-02 Q1 FY 24-25 VIVA PIXEL I.pdf | 25 Jul 2025 |
| Withdrawal Update Form 3File: Form 03_Viva Pixel Ph I.pdf | 25 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Viva Pixel Ph 1.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Viva Pixel Ph 1.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K VIVA PIXEL PH I.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_VIVA PIXEL I.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_VIVA PIXEL I.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Viva pixel1.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_VIVA PIXEL.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - pixel 1.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- pixel 1.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - Viva pixel 1.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Kohinoor Viva Pixel - Phase I.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 Q1 FY 24-25 VIVA PIXEL PHASE I.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 Q1 FY 24-25 VIVA PIXEL I.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 VIVA PIXEL I.pdf | 20 Jul 2024 |
| Layout approvalFile: 1-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 2-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 3-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 4-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 5-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 6-7.pdf | 4 Jun 2024 |
| Building plan approvalFile: 7-7.pdf | 4 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-7.pdf | 4 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7-7.pdf | 4 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 240315 - CC.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VIVA PIXEL PHASE I (2)_.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VIVA PIXEL PHASE I.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIVA PIXEL I.pdf | 20 Apr 2024 |
| Proforma of Agreement for saleFile: ATS_Revised_compressed.pdf | 15 Apr 2024 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 11 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Legal encumbrance-Viva Pixel.pdf | 9 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Legal encumbrance-Viva Pixel.pdf | 9 Sep 2023 |
| Declaration in FORM BFile: Form B- Promoter.pdf | 9 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 9 Sep 2023 |
| Proforma of Agreement for saleFile: AGREEMENT -RERA Upload (09:09:2023).pdf | 9 Sep 2023 |
| Other - LegalFile: POA - Dhanori - 5-15- 5587-2022_compressed.pdf | 9 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-RKG.pdf | 5 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf | 29 Aug 2023 |
| Layout approvalFile: LAYOUT.pdf | 24 Aug 2023 |
| Building plan approvalFile: BUILDING PLAN.pdf | 24 Aug 2023 |
| Building plan approvalFile: 3-5.pdf | 24 Aug 2023 |
| Building plan approvalFile: 4-5.pdf | 24 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report - RERA.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance Financial.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance Financial.pdf | 24 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 24 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 24 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf | 24 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf | 24 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - BP.pdf | 24 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KOHINOOR VIVA PIXEL- PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANORI
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: RISING ASSOCIATES
RISING ASSOCIATES has 13 registrations on MahaRERA, including KOHINOOR JEEVA and KOHINOOR JEEVA C BUILDING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if KOHINOOR VIVA PIXEL- PHASE I is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KOHINOOR VIVA PIXEL- PHASE I?
The registered promoter entity is RISING ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KOHINOOR VIVA PIXEL- PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KOHINOOR VIVA PIXEL- PHASE I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KOHINOOR VIVA PIXEL- PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KOHINOOR VIVA PIXEL- PHASE I?
The professionals named in the filing: Architect: VK a architecture; Engineer: Planedge Consultants P Limited; Chartered Accountant: Vinod Nikam and Co; Chartered Accountant: BHANDARI S A A J & ASSOCIATES; Chartered Accountant: JAYESH N JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KOHINOOR VIVA PIXEL- PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback