Completed No litigation declared Residential / Group Housing project

Kohinoor Square Phase 2

By Kohinoor CTNL Infrastructure Company Private Limited

RG-MH-25385 · RERA P51900012308 · Last updated on MahaRERA portal: 3 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Kohinoor Square Phase 2 is a Residential / Group Housing project by Kohinoor CTNL Infrastructure Company Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900012308 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKohinoor Square Phase 2
  • TypeResidential / Group Housing
  • Location
    • N.C. Kelkar Road
    • Shivaji Park
    • Dadar (west)
    • Dadar West
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012308
  • ReraGenie IDRG-MH-25385

Builder

  • NameKohinoor CTNL Infrastructure Company Private Limited
  • Entity typeCompany
  • Company SecretorySheetal Ganesh Naik
  • DirectorSandeep Shikre
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing C Comprising of Residential, Energy Centre, Club House, PPL and Captive ParkingNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Wing C Comprising of Residential, Energy Centre, Club House, PPL and Captive Parking: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 3 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Covered ParkingYes100%
Club HouseYes100%

Parking filed1243

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,243
Closed/Covered1,243

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,142 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI31097.83
Proposed, not sanctioned19,098 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Shop No 2 3 Priyadarshini Mahila Co op Society Bhavani Shankar Road Dadar West Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associates
EngineerSterling Engineering Consultancy Services PVt. Ltd.
PartnerRole in project
Kohinoor CTNL Infrastructure Company Private Limited-

Litigation declared7

CaseCourtStatus
1027/2017National Company Law Tribunal MumbaiResolution Plan Approved
649/2017Mumbai Debt Recovery Tribunal No IIPending for filing consent terms
134/2018National Company Law Appellate Tribunal DelhiAppeal Withdrawn
43/2018High Court MumbaiPetition Withdrawn
3373/2018Supreme Court DelhiPending for Hearing
1236/2017Supreme Court DelhiPending for Hearing
157/2018National Company Law Appellate Tribunal DelhiAppeal Withdrawn

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000197798Anish GuptaKohinoor CTNL Infrastructure Pvt Ltd Company28/07/2021
CC006000000197799Ridhi GuptaKohinoorCTNL Infrastructure Co Pvt Ltd28/07/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 May 2023

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Form -4 - Architect Certificate.pdf3 Feb 2025
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (April-18 to Dec-21).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (Jan-22 to Mar-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (April-22 to June-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (July-22 to Sept-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (Oct-22 to Dec-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (Jan-23 to March-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (April-23 to June-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (July-23 to Sept-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (Oct-23 to Dec-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-2 (Jan-24 to March-24).pdf3 Dec 2024
OtherFile: 26 Jun 2024 IT Approval.pdf10 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect's Certificate_Form 4.pdf27 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf2 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer's Certificate for RERA-KSP-Phase 2 (Oct 2022-Dec 2022)_1.pdf26 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer's Certificate for RERA-KSP-Phase 2 (Jan 2023-Mar 2023)_2.pdf26 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate_PH I.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate_PH II.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate_ PH II.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate_PH II.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate _PH II.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_ PH II.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PH II.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PH II.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineers Certificate_PH II.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineers Certificate_PH II.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineers Certificate_PH II.pdf13 Oct 2022
OtherFile: 26 Apr 2022 OC signed.pdf18 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210930 KSP Wing C Form 1 Architect certificate for Phase 2.pdf3 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210930 KSP Wing C Form 2 Engineer certificate Phase 2.pdf3 May 2022
Certificates of CA (Form 3)File: 20210930 KSP Wing C Form 3 CA Certificate Phase 2.pdf3 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2022426 OC signed.pdf3 May 2022
OtherFile: Part OC signed.pdf7 Feb 2022
Copy of the legal title reportFile: Title Certificate 2021.pdf26 Nov 2021
OtherFile: 2021308 Part OC.pdf13 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210630 Form 1 Architect certificate for Phase 2 Wing C.pdf9 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210630 Form 2 Engineer certificate Phase 2 Wing C.pdf9 Sep 2021
Certificates of CA (Form 3)File: 20210630 Form 3 CA Certificate Phase 2 Wing C.pdf9 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210331 FORM 1 Architect certificate for Phase 2 Wing C.pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210331 FORM 2 Engineer certificate for Phase 2 Wing C.pdf1 Sep 2021
Certificates of CA (Form 3)File: 20210331 FORM 3 CA certificate for Phase 2 Wing C.pdf1 Sep 2021
Certificates of CA (Form 3)File: 20201231 Form3 Kohinoor Phase2 Wing C.pdf22 Jun 2021
OtherFile: 2021525 RERA Phase 2 Inventory.pdf28 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2020114 OC signed.pdf6 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20190627 OC signed.pdf5 May 2021
OtherFile: 2020109 amended signed letter.pdf5 May 2021
Certificates of CA (Form 3)File: 2020 09 30 KSP Form 3 Wing C CA Certificate Phase 2.pdf26 Feb 2021
Certificates of CA (Form 5)File: Kohinoor CTNL Form 5 Phase 2.pdf22 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200630 KSP Wing C Form 1 Architect certificate Phase 2-compressed.pdf21 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20200630 KSP Wing C Form 2 Engineer certificate Phase 2-compressed.pdf21 Dec 2020
Certificates of CA (Form 3)File: 20200630 KSP Wing C Form 3 CA Certificate Phase-2-compressed.pdf21 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200331KSP Wing C Form1 Architect certificate Phase 2.pdf7 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20200331KSP Wing C Form2 Engineers Certificate Phase 2.pdf7 Nov 2020
Certificates of CA (Form 3)File: 20200331KSP Wing CForm 3 Chartered Accountants Certificate Phase 2.pdf7 Nov 2020
Certificates of CA (Form 3)File: Form 3 CA Certificate RERA Phase 2 Wing C 31122019.pdf12 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate Phase 2 Wing C as on 31122019.pdf13 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Phase 2 Wing C 31122019.pdf10 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect certificate for Phase 2 as on 30092019.pdf18 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Kohinoor Square Phase 2 wing C as on 30092019.pdf18 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Kohinoorsquare - FurtherCC_signed_compressed.pdf6 Dec 2019
Certificates of CA (Form 3)File: Form 3 Kohinoor Square Phase 2 July 19 - Sep 19.pdf6 Dec 2019
Certificates of CA (Form 5)File: Form 5 - Kohinoorsquare Phase 2 03122019.pdf3 Dec 2019
Proforma of Allotment letterFile: Sale Agreement draft Latest.pdf8 Jul 2019
Proforma of Allotment letterFile: S 29 May Sale_Agreement_Kohinoor_Square_Final.pdf29 Jun 2019
OtherFile: Part OC for Kohinoor Square.pdf29 Jun 2019
Copy of the legal title reportFile: Title Certificate Kohinoor Square 30 may 2019.pdf28 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Kohinoor Square Phase 2 Wing C as on 31st March 2019.pdf19 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate Kohinoor Square Phase 2 Wing C as on 31st March 2019.pdf19 Jun 2019
Certificates of CA (Form 3)File: Form 3 CA Certificate Kohinoor Square Phase 2 Wing C as on 31st March 2019.pdf19 Jun 2019
Certificates of CA (Form 5)File: Form 5 CA Certificate Kohinoor Square Phase 2 Wing C as on Nov_2018.pdf25 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Kohinoor Square Phase 2 Wing C as on 1st nov 2018.pdf12 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate Kohinoor Square Phase 2 Nov_2018.pdf12 Dec 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate Kohinoor Square Phase 2 Wing C as on Nov_2018.pdf12 Dec 2018
Copy of the legal title reportFile: Legal Title Report Kohinoor Square_26042018_Final.pdf26 Apr 2018
Details of encumbrancesFile: CERTIFICATE OF REGISTRATION OF CHARGE.pdf26 Apr 2018
Proforma of Allotment letterFile: Proforma of Agreement for Sale Kohinoor Square Phase 2 Wing C_26042018.pdf26 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate KSP.pdf22 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate Kohinoor Square Phase 2 Wing C Revised.pdf2 Sep 2017
Layout approvalFile: Layout Kohinoor Square Phase 2 Wing C.pdf29 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Square Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar West780+ in Mumbai City

2 kmKohinoor Square Phase 2Completed 86Lapsed / revoked 71Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: Kohinoor CTNL Infrastructure Company Private Limited

Kohinoor CTNL Infrastructure Company Private Limited has 2 registrations on MahaRERA, including Kohinoor Square Phase 1 and Kohinoor Square Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Kohinoor Square Phase 2 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Square Phase 2?

The registered promoter entity is Kohinoor CTNL Infrastructure Company Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Square Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kohinoor Square Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kohinoor Square Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Square Phase 2?

The professionals named in the filing: Architect: Sandeep Shikre & Associates; Engineer: Sterling Engineering Consultancy Services PVt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Square Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Square Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Square Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.