Registered No litigation declared Residential / Group Housing project

Kohinoor Eden B4

By KGI REALTY PRIVATE LIMITED

RG-MH-84218 · RERA P51700050022 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 90%
112 of 270Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

Kohinoor Eden B4 is a Residential / Group Housing project by KGI REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700050022 on 6 Mar 2023. Possession is promised by 31 Dec 2026. 158 of the 270 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKohinoor Eden B4
  • TypeResidential / Group Housing
  • Location
    • Off Hajimalang road
    • Kalyan East
    • Adivali Dhokali
    • Ambarnath
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050022
  • ReraGenie IDRG-MH-84218

Builder

  • NameKGI REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2019PTC323777
  • GSTIN27AAHCK5827B1ZM
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsAashish Shankar Hotchandani, Amit Anil Hotchandani, Sonu Anil Hotchandani
  • Other registrations15 more →
  • Completed3 of 16
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

59%158 of 270 units booked
73.6%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B4NA242424822270

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

B4: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes40%
Street LightingYes20%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered1
Open Space53

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,813 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 May 2026

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNCIPAL CORPORATION
Permissible FSI19315.13
Proposed, not sanctioned14,315 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSEC 3 ULHASNAGAR BRANCH ULHASNAGAR 421003
Estimated costRs 32.82 cr
Cost incurredRs 24.14 cr
Work done73.56%
BuildingWingEstimatedIncurred
B4NARs 29.17 crRs 21.88 cr
-NARs 3.65 crRs 2.26 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay Pandey
EngineerAtesh Pralhad Jadhav Pralhad Jadhav
Chartered AccountantVikas Kamra & Co
Chartered AccountantMANISHA GERELLA
PartnerRole in project
KGI REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503023komal Ramdas salunkeKGI REALTY PRIVATE LIMITED27/08/2025
CC12601451Vijay Lavjari GuptaKGI REALTY PRIVATE LIMITED15/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A signed.pdf16 Jul 2026
Building plan approvalFile: 1 Final Approval Paln 2026-1-3_11zon.pdf7 Jun 2026
Building plan approvalFile: 1 Final Approval Paln 2026-4-6_11zon.pdf7 Jun 2026
Building plan approvalFile: 1 Final Approval Paln 2026-7-9_11zon.pdf7 Jun 2026
Commencement certificateFile: 1 Final Commencement 2026.pdf7 Jun 2026
Form 1File: 9 form 1 Phase 3.pdf7 Jun 2026
Form 2File: 10 form 2 phase 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: 12 Sold Unsold phase 3.pdf7 Jun 2026
Form 3File: 11 form 3 phase 3_11zon.pdf7 Jun 2026
Form 1File: Form 1 30062023 final_0001.pdf7 Jun 2026
Form 2File: Form 2 30062023 final_0001_0001.pdf7 Jun 2026
Form 3File: Form 3 30062023 final_0001_11zon.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure_0001.pdf7 Jun 2026
Form 1File: Form 1 Eden B4.pdf7 Jun 2026
Form 2File: Form 2-B4.pdf7 Jun 2026
Form 3File: Form 3-B4_11zon.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold-B4.pdf7 Jun 2026
Form 1File: FORM 1.pdf7 Jun 2026
Form 2File: FORM 2.pdf7 Jun 2026
Form 3File: FORM 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf7 Jun 2026
Form 1File: form 1.pdf7 Jun 2026
Form 2File: form 2.pdf7 Jun 2026
Form 3File: form 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Jun 2026
Form 1File: form 1.pdf7 Jun 2026
Form 2File: form 2.pdf7 Jun 2026
Form 3File: form 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Jun 2026
Form 1File: form 1.pdf7 Jun 2026
Form 2File: form 2.pdf7 Jun 2026
Form 3File: form 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Jun 2026
Form 1File: form 1.pdf7 Jun 2026
Form 2File: form 2.pdf7 Jun 2026
Form 3File: form 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Jun 2026
Form 1File: form 1.pdf7 Jun 2026
Form 2File: form 2.pdf7 Jun 2026
Form 3File: form 3.pdf7 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Jun 2026
Withdrawal Update Form 1File: form 1 30092025.pdf7 Jun 2026
Withdrawal Update Form 1File: form 1 31122025.pdf7 Jun 2026
Withdrawal Update Form 1File: form 1 31032026.pdf7 Jun 2026
Withdrawal Update Form 2File: form 2 30092025.pdf7 Jun 2026
Withdrawal Update Form 2File: form 2 31122025.pdf7 Jun 2026
Withdrawal Update Form 2File: form 3 31032026.pdf7 Jun 2026
Withdrawal Update Form 3File: form 3 30092025.pdf7 Jun 2026
Withdrawal Update Form 3File: form 3 30092025.pdf7 Jun 2026
Withdrawal Update Form 3File: form 3 31032026.pdf7 Jun 2026
Form 5 (FY 2024-2025)File: 3 Form 5 new format eden B4 Fy 24-25.pdf18 May 2026
Form 1File: Architect Certificate.pdf21 Jul 2025
Form 2File: Engineers Certificate B4.pdf21 Jul 2025
Form 3File: CA Certificate.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate B4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 4 Sold Unsold Inventory.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 3 kohinoor eden B4.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Eden B4.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Eden B4.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate B4 signed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate B4 Signed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE B4.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate B4.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B4 Certificate.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate B4.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Eden B4.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-B4.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold-B4_11zon.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-B4_11zon.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Kohinoor Eden B4.pdf9 Jan 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kohinoor HighlandP51700051023Usarghar, Dombivili, Thane266May 2023CompletedDec 2026May 2026
Kohinoor AashiyanaChichpada188-CompletedOct 2024Oct 2023

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Eden B4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan East7,600+ in Thane

2 kmKohinoor Eden B4Completed 19Lapsed / revoked 11Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: KGI REALTY PRIVATE LIMITED

KGI REALTY PRIVATE LIMITED has 16 registrations on MahaRERA, including KOHINOOR AASHIYANA and Kohinoor Eden. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Kohinoor Eden B4 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Eden B4?

The registered promoter entity is KGI REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC323777 and GSTIN 27AAHCK5827B1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Eden B4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kohinoor Eden B4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kohinoor Eden B4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Eden B4?

The professionals named in the filing: Architect: Vijay Pandey; Engineer: Atesh Pralhad Jadhav Pralhad Jadhav; Chartered Accountant: Vikas Kamra & Co; Chartered Accountant: MANISHA GERELLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Eden B4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Eden B4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Eden B4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.