Home / Browse projects / Pune, Maharashtra / Kohinoor City I and Kohinoor City II

Registered No litigation declared Residential / Group Housing project

Kohinoor City I and Kohinoor City II

By VISHWA DEVELOPERS

RG-MH-88859 · RERA P52100049952 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 30%
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Kohinoor City I and Kohinoor City II is a Residential / Group Housing project by VISHWA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100049952 on 6 Mar 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameKohinoor City I and Kohinoor City II
  • TypeResidential / Group Housing
  • Location
    • Chikhali
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049952
  • ReraGenie IDRG-MH-88859

Builder

  • NameVISHWA DEVELOPERS
  • Entity typePartnership
  • PartnersRupali Sunil Pingale, Kalpana Harishchandra Pingale, Kalpana Harishchandra Pingale, Rupali Sunil Pingale
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A And Wing BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 30%.

Wing A And Wing B: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,956 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4854.13
Proposed, not sanctioned4,854 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSambhajinagar Chinchwad

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPurshottam Nivrutti Bhalekar
ArchitectVASTU RACHANA ASSOCIATES
EngineerPurshottam Nivrutti Bhalekar
EngineerATUL B SURYAWANSHI
Chartered AccountantSUNSVG and Associates
Chartered AccountantREET ANAND MEGHRAJANI
PartnerRole in project
VISHWA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf18 Apr 2026
Form 2File: Form 2.pdf18 Apr 2026
Form 3File: Form 3.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Kohinoor City Sold Unsold-1.pdf18 Apr 2026
Form 1File: Kohinoor City Form - 1.pdf26 Mar 2026
Form 2File: Kohinoor City I form_2.pdf26 Mar 2026
Form 3File: Form 3 Kohinoor City_compressed.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Mar 2026
Form 1File: Kohinoor City form1.pdf29 Oct 2025
Form 2File: Kohinoor City form2.pdf29 Oct 2025
Form 3File: Kohinoor City form3_compressed.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: Kohinoor City I Kohinoor City II Sold Unsold.pdf29 Oct 2025
Form 1File: Kohinoor City form 1.pdf7 Aug 2025
Form 2File: Kohinoor City form2.pdf7 Aug 2025
Form 3File: Kohinoor City Form 3.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Kohinoor City sold unsold inventory.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf27 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf27 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Kohinoor city I Kohinoor city II SOLD UNSOLD.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed-1.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KC FORM 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KC FORM 2.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KC FORM 1 APRIL 23.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KC FORM 1 JULY 23.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KC FORM 1 OCT 23.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KC FORM 2 APRIL 24.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KC FORM 2 JULY 23.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KC FORM 2 OCT 23.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KC FORM 2A 2324.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KC FORM 3 MAY 23_compressed.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KC CITY FORM 3 DEC 23_compressed.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY_compressed.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: kc- form1.pdf9 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kc- form2.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Kc- form 2A.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kc - form 3.pdf9 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: kc- form 5.pdf9 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kh2 - Form 1.pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: kh2-form2A.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: kh2-form5.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2223.pdf3 Mar 2024
Layout approvalFile: 1 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 2 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 3 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 4 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 5 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 6 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 7 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 8 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 9 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 10 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 11 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 9 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 10 OF 11_compressed.pdf3 Sep 2023
Building plan approvalFile: 11 OF 11_compressed.pdf3 Sep 2023
Copy of Layout Approval (in case of layout)File: 1 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 4 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 7 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 8 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 9 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 10 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 11 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 9 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 10 OF 11_compressed.pdf3 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 11 OF 11_compressed.pdf3 Sep 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor City I and Kohinoor City II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmKohinoor City I and KohiCompleted 72Lapsed / revoked 42Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 176 registered projects within 2 km.

Builder: VISHWA DEVELOPERS

Vishwa Developers has 7 registrations on MahaRERA, including MATRIX COMPLEX and SWAMI KRUPA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kohinoor City I and Kohinoor City II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor City I and Kohinoor City II?

The registered promoter entity is VISHWA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor City I and Kohinoor City II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kohinoor City I and Kohinoor City II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor City I and Kohinoor City II?

The professionals named in the filing: Architect: Purshottam Nivrutti Bhalekar; Architect: VASTU RACHANA ASSOCIATES; Engineer: Purshottam Nivrutti Bhalekar; Engineer: ATUL B SURYAWANSHI; Chartered Accountant: SUNSVG and Associates; Chartered Accountant: REET ANAND MEGHRAJANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor City I and Kohinoor City II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor City I and Kohinoor City II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor City I and Kohinoor City II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.