Home / Browse projects / KINJAL PRIDE
KINJAL PRIDE
By Hi Rock Construction Pvt Ltd
RG-MH-06628 · RERA P51900052854 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KINJAL PRIDE is a Others project by Hi Rock Construction Pvt Ltd in PAREL, 400012, registered with MahaRERA as P51900052854 on 5 Oct 2023. Possession is promised by 31 Oct 2026. 27 of the 73 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameKINJAL PRIDE
- TypeOthers
- Location
- DR B A ROAD F/SOUTH
- PAREL
- 400012
- Pincode400012
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900052854
- ReraGenie IDRG-MH-06628
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings2 building records
- Documents filed107 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KINJAL PRIDE | NA | 29 | 23 | 68 | 5 | 73 |
| KINJAL PRIDE 1 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 18%.
KINJAL PRIDE38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 18% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
KINJAL PRIDE 138%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 18% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Skyline Architects |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | N B Sayed & Associates |
| Partner | Role in project |
|---|---|
| Hi Rock Construction Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect Certificate Form-1 31-03-2026-1rev.pdf | 11 May 2026 |
| Form 2File: Form 2 of Kinjal Pride as on 31-03-2026.pdf | 11 May 2026 |
| Form 3File: Form 3 of Kinjal Pride as on 31-03-2026.pdf | 11 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular - 29 of Kinjal Pride as on 31-03-2026.pdf | 11 May 2026 |
| Form 1File: Form 1 - Kinjal Pride as on Dec 2025.pdf | 20 Feb 2026 |
| Form 2File: Form 2 - Kinjal Pride as on Dec 2025.pdf | 20 Feb 2026 |
| Form 3File: Form 3 - Kinjal Pride as on Dec 2025.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on Dec 2025.pdf | 20 Feb 2026 |
| Form 1File: Form 1 - Kinjal Pride as on March 2025.pdf | 2 Jan 2026 |
| Form 2File: Form 2 of Kinjal Pride as on March 2025.pdf | 2 Jan 2026 |
| Form 3File: Form 3 of Kinjal Pride as on 31-03-2025.pdf | 2 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on June 2025.pdf | 2 Jan 2026 |
| OthersFile: CC.pdf | 2 Jan 2026 |
| Form 1File: Form 1 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Form 2File: Form 2 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Form 3File: Form 3 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on June 2025.pdf | 2 Jan 2026 |
| OthersFile: 2 - 3.pdf | 2 Jan 2026 |
| Form 1File: Form 1 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Form 2File: Form 2 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Form 3File: Form 3 of Kinjal Pride as on 31-12-2024.pdf | 2 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on June 2025.pdf | 2 Jan 2026 |
| OthersFile: 4 - 6.pdf | 2 Jan 2026 |
| Form 1File: Form 1 - Kinjal Pride as on Sep 2025.pdf | 1 Dec 2025 |
| Form 2File: Form 2 - Kinjal Pride as on Sep 2025.pdf | 1 Dec 2025 |
| Form 3File: Form 3 - Kinjal Pride as on Sep 2025.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on Sep 2025.pdf | 1 Dec 2025 |
| Form 1File: Form 1 - Kinjal Pride as on June 2025.pdf | 8 Sep 2025 |
| Form 2File: Form 2 - Kinjal Pride as on June 2025.pdf | 8 Sep 2025 |
| Form 3File: Form 3 - Kinjal Pride as on June 2025.pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Kinjal Pride as on June 2025.pdf | 8 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Kinjal Pride as on 31-03-2025.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Kinjal Pride as on March 2025.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kinjal Pride as on March 2025.pdf | 8 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM_5_2023-2024_Kinjal Pride.pdf | 8 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (1).pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 21 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf | 5 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 .pdf | 5 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INV.pdf | 28 Feb 2024 |
| Layout approvalFile: PLAN 1.pdf | 20 Jan 2024 |
| Layout approvalFile: PLAN 2.pdf | 20 Jan 2024 |
| Layout approvalFile: PLAN 3.pdf | 20 Jan 2024 |
| Layout approvalFile: PLAN 4.pdf | 20 Jan 2024 |
| Layout approvalFile: PLAN 5.pdf | 20 Jan 2024 |
| Layout approvalFile: PLAN 6.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 1.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 2.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 3.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 4.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 5.pdf | 20 Jan 2024 |
| Building plan approvalFile: PLAN 6.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 1.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 3.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 4.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 5.pdf | 20 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 6.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 4.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 5.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 6.pdf | 20 Jan 2024 |
| Proforma of Agreement for saleFile: AFS Pride New.pdf | 20 Jan 2024 |
| Other - TechnicalFile: Summary of BUA Wing Wise.pdf | 21 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE.pdf | 15 Sep 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE.pdf | 15 Sep 2023 |
| Layout approvalFile: PLAN 1.pdf | 2 Sep 2023 |
| Layout approvalFile: PLAN 2.pdf | 2 Sep 2023 |
| Layout approvalFile: PLAN 3.pdf | 2 Sep 2023 |
| Layout approvalFile: PLAN 4.pdf | 2 Sep 2023 |
| Layout approvalFile: PLAN 5.pdf | 2 Sep 2023 |
| Building plan approvalFile: PLAN 1.pdf | 2 Sep 2023 |
| Building plan approvalFile: PLAN 2.pdf | 2 Sep 2023 |
| Building plan approvalFile: PLAN 3.pdf | 2 Sep 2023 |
| Building plan approvalFile: PLAN 4.pdf | 2 Sep 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kinjal Residency | Farooq S. Umerbhai Road Agripada Mumbai 400011 | 384 | Completed | Sep 2016 | Jun 2016 |
| Kinjal Tower | 1st Cross NM Joshi Marg Byculla West Mumbai 400011 | 176 | Completed | Jan 2012 | Aug 2011 |
| Kinjal Heights | Wadia Street Near Tardeo bus stop Tardeo Mumbai 400034 | 63 | Completed | Jun 2009 | Late, Jun 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KINJAL PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PAREL
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
SATTVA SUMERA
ALPERTON DEVELOPERS AND CONTRACTORS PRIVAT
THE EDGE
TEJUKAYA CORP PRIVATE LIMITED
THE PINNACLE
RATNARAJ BLESSING MILESTONE LLP
Ruparel Millennia
Renuka Realtors
Ruparel Jewel
Renuka Realtors
Ruparel NOVA
SHREE SUKHAKARTA DEVELOPERS PVT.LTD.
Builder: Hi Rock Construction Pvt Ltd
Hi Rock Construction Pvt Ltd has 2 registrations on MahaRERA, including Kinjal Nine and KINJAL PRIDE. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if KINJAL PRIDE is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KINJAL PRIDE?
The registered promoter entity is Hi Rock Construction Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KINJAL PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KINJAL PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KINJAL PRIDE?
The professionals named in the filing: Architect: Skyline Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KINJAL PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback