Home / Browse projects / Aurangabad, Maharashtra / Khinvasara Autumn

Registered No litigation declared Residential / Group Housing project

Khinvasara Autumn

By Ravindra Champalal Khinvasara

RG-MH-08041 · RERA P51500017415 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 54 months from the original
5 of 11Construction stages donefurthest along: Staircases, 65%
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Khinvasara Autumn is a Residential / Group Housing project by Ravindra Champalal Khinvasara in Aurangabad, Maharashtra, registered with MahaRERA as P51500017415 on 9 Aug 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameKhinvasara Autumn
  • TypeResidential / Group Housing
  • Location
    • Behind Ganapati Mandir
    • Pannalal Nagar
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500017415
  • ReraGenie IDRG-MH-08041

Builder

  • NameRavindra Champalal Khinvasara
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2018First promiseJun 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Khinvasara AutumnNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 65%.

Khinvasara Autumn: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes30%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered35
Open Space7

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,644 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6348.95
Proposed, not sanctioned6,349 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSamarth Nagar, Aurangabad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ B Associates
EngineerRakesh Jain & Associates
EngineerSACHIN RAUT
PartnerRole in project
Ravindra Champalal Khinvasara-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500024083Jun 2024 → Dec 2028

Reason as filed by the promoterMarket condition compiled us to made project progress slow. There is no booking yet.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1 Mar 26.pdf23 May 2026
Form 2File: FORM-2 Mar 26.pdf23 May 2026
Form 3File: FORM-3 Mar 26.pdf23 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD Mar 26.pdf23 May 2026
Form 1File: FORM-1 March-25.pdf15 May 2026
Form 2File: FORM-2 March-25.pdf15 May 2026
Form 3File: Form-3 March-25.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Booking Deatils Mar- 25 .pdf15 May 2026
Form 1File: FORM-1 Dec 25.pdf15 May 2026
Form 2File: FORM-2 Dec 25.pdf15 May 2026
Form 3File: FORM 3 Declaration Dec 25 .pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD Dec 25.pdf15 May 2026
Form 2A (FY 2018-2019)File: K AUTUMN - FORM 2A -18-19.pdf12 May 2026
Form 2A (FY 2019-2020)File: K AUTUMN - FORM 2A -19-20.pdf12 May 2026
Form 2A (FY 2020-2021)File: K AUTUMN - FORM 2A -20-21.pdf12 May 2026
Form 2A (FY 2021-2022)File: K AUTUMN - FORM 2A -21-22.pdf12 May 2026
Form 2A (FY 2022-2023)File: K AUTUMN - FORM 2A -22-23.pdf12 May 2026
Form 2A (FY 2023-2024)File: K AUTUMN - FORM 2A -23-24.pdf12 May 2026
Form 2A (FY 2024-2025)File: K AUTUMN - FORM 2A -24-25.pdf12 May 2026
Form 2A (FY 2025-2026)File: K AUTUMN - FORM 2A -25-26.pdf12 May 2026
Form 1File: FORM-1 June 25.pdf5 May 2026
Form 2File: FORM-2 June 25.pdf5 May 2026
Form 3File: FORM-3 JUN 25.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD JUN 25.pdf5 May 2026
Form 1File: FORM-1 Sept 25.pdf5 May 2026
Form 2File: FORM-2 Sept 25.pdf5 May 2026
Form 3File: FORM-3 SEP 25.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD SEP 25.pdf5 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Autmn Form 1 Mar 25.pdf18 Apr 2025
Certificates of CA (Form 3)File: Autmn Form 3 Mar 25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Autmn Form 2 Mar 25.pdf17 Apr 2025
Certificates of CA (Form 3)File: Decleration for CA form 3 sept 24.pdf21 Feb 2025
Certificates of CA (Form 3)File: Decleration for CA form 3 Dec 24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Sep 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certficate Dec 24_11zon.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engneer Certificate Qtr sept 24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engneer Certificate Qtr Dec 24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 March 24.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 June 24.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 Engineer Certificate March-2024_organized.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 Engineer Certificate June -2024.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: autumn booking status.pdf12 Jul 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q-3 2023_compressed.pdf12 Jul 2024
Declaration in FORM BFile: Khinvasara Autumn Form-B.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech certificate .pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure - B.pdf12 Jan 2024
Certificates of CA (Form 3)File: ca certificate _compressed_compressed n.pdf12 Jan 2024
Certificates of CA (Form 3)File: CA Form .pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect's Certificate .pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginering certificates.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K- Autumn.pdf13 Oct 2023
Certificates of CA (Form 3)File: CA Form K- Autumn 2_compressed.pdf25 Jul 2023
Building plan approvalFile: HPSCANNER3571_compressed_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3572_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3573_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3573_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3574_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3575_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3576_compressed.pdf24 Jul 2023
Building plan approvalFile: HPSCANNER3577_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3571_compressed_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3572_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3573_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3573_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3574_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3575_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3576_compressed.pdf24 Jul 2023
Building Plan Approval (IOD)File: HPSCANNER3577_compressed.pdf24 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: DOC.pdf24 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate .pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate J B Associates .pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Apr 2023
Certificates of CA (Form 3)File: Form-3.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Autumn-Arch-Certificate.pdf28 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Khinvasara Fort2-Khinvasara Park East77CompletedMar 2012Mar 2012

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 54 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Khinvasara Autumn on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pannalal Nagar1,400+ in Aurangabad

2 kmKhinvasara AutumnCompleted 48Lapsed / revoked 34Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: Ravindra Champalal Khinvasara

Ravindra Champalal Khinvasara has 4 registrations on MahaRERA, including Khinvasara Autumn and Khinvasara Icon. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Khinvasara Autumn is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Khinvasara Autumn?

The registered promoter entity is Ravindra Champalal Khinvasara, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Khinvasara Autumn?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Khinvasara Autumn?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Khinvasara Autumn?

The professionals named in the filing: Architect: J B Associates; Engineer: Rakesh Jain & Associates; Engineer: SACHIN RAUT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Khinvasara Autumn?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Khinvasara Autumn. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Khinvasara Autumn to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.