Home / Browse projects / Pune, Maharashtra / Kharadi Signet
Kharadi Signet
RG-MH-31153 · RERA P52100079487 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 5 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kharadi Signet is a Commercial project by Lodha Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100079487 on 7 Mar 2025. Possession is promised by 31 Aug 2028. 34 of the 70 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameKharadi Signet
- TypeCommercial
- Location
- Wagholi
- Haveli
- Pune
- 412207
- Pincode412207
- RERA no.P52100079487
- ReraGenie IDRG-MH-31153
Builder
- NameLodha Developers Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- DirectorWTDRajendra Narpatmal Lodha
- WtdRaunika Malhotra
- MdAbhishek Mangalprabhat Lodha
- DirectorsMukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Dharia
- Other registrations178 more →
- Completed16 of 179
- No longer live3 lapsed, de-registered or revoked
- Past their filed date3
- Declared earlier projects22 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Mar 2025
- Promised completion31 Aug 2028
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing MLCP | NA | 22 | 22 | 70 | 0 | 70 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Wing MLCP: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed3446
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ankit Goel | Pune (M Corp.) | Pune |
| Annuj Goel | Pune (M Corp.) | Pune |
| Rajendra Goel | Pune (M Corp.) | Pune |
| Sanjay Palesha | Pune (M Corp.) | Pune |
| Kavita Palesha | Pune (M Corp.) | Pune |
| Ammul Geol | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Desai & Associate |
| Architect | Pradeepmkamble and associates |
| Engineer | K C Shah Consultants |
| Engineer | Awadheshkumar Yadav |
| Engineer | Sayantan Datta |
| Chartered Accountant | Chirag Sarvaiya & Co |
| Chartered Accountant | M S K A |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 1042/2022 | Civil Judge Senior Division | Pending |
| 585/2022 | Civil Judge Senior Division | Pending |
| 1927/2023 | Civil Judge Senior Division | Pending |
| 796/2023 | Civil Judge Senior Division | Pending |
| 595/2022 | Civil Judge Senior Division | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2028
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - Kharadi Signet - P52100079487.pdf | 23 Jun 2026 |
| Form 1File: Kharadi Signet - March25 - P52100079487 -ok-1.pdf | 20 Apr 2026 |
| Form 2File: Form 2.pdf | 20 Apr 2026 |
| Form 3File: Form 3.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 20 Apr 2026 |
| Form 1File: Kharadi Signet - dec25 - P52100079487 -FF.pdf | 27 Jan 2026 |
| Form 2File: Form 2 Kharadi Signet.pdf | 27 Jan 2026 |
| Form 3File: Form 3 - Kharadi Signet - Dec 25.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Kharadi Signet.pdf | 27 Jan 2026 |
| Form 1File: Form 1 Kharadi Signet- Sep-25.pdf | 28 Oct 2025 |
| Form 2File: Form 2 - Kharadi Signet - Sep 25.pdf | 28 Oct 2025 |
| Form 3File: Form 3 - Kharadi Signet.pdf | 28 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Kharadi Signet.pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - P52100079487 - Kharadi Signet.pdf | 13 Oct 2025 |
| Form 2A (FY 2024-2025)File: Kharadi Signet - P52100079487 - Form 2A.pdf | 25 Aug 2025 |
| Form 1File: Form-1 Kharadi Signet - June-25 - P52100079487.pdf | 18 Jul 2025 |
| Form 2File: Form 2 - Kharadi signet - Jun 25.pdf | 18 Jul 2025 |
| Form 3File: Form 3 - Kharadi signet - Jun 25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - Kharadi signet - Jun 25.pdf | 18 Jul 2025 |
| Form 1File: Form 1-Kharadi Signet - 79487.pdf | 1 Jul 2025 |
| Form 2File: Form 2-Kharadi Signet.pdf | 1 Jul 2025 |
| Form 3File: Form 3-Kharadi Signet.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold -Kharadi signet.pdf | 1 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Signet - 79487.pdf | 2 May 2025 |
| Declaration in FORM BFile: 4 b Details of encumbrances concerned to Legal.pdf | 3 Mar 2025 |
| Proforma of Agreement for saleFile: AFS Final signet.pdf | 18 Feb 2025 |
| Copy of the legal title reportFile: Third Supplemental RERA Title Report -Wagholi, Pune.pdf | 10 Feb 2025 |
| Copy of the legal title reportFile: Wagholi Pune - First Supplemental Agreement For upload.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Litigation Signet.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Litigation Signet.pdf | 10 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1919_001.pdf | 29 Jan 2025 |
| Building plan approvalFile: 37 - converted.pdf | 9 Jan 2025 |
| Proforma of Allotment letterFile: Proforma of Allotment letter.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 37 - converted.pdf | 9 Jan 2025 |
| Other - LegalFile: GetUserDocumentFileContent (6).pdf | 9 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Format A.pdf | 9 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Allot Devation Final.pdf | 9 Jan 2025 |
| Other - FinanceFile: Finance Declaration.pdf | 9 Jan 2025 |
| Other - FinanceFile: ilovepdf_merged (18).pdf | 9 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Final - AFS Deviation Kharadi Signet.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 Kharadi Signet - New Registration.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Jan 2025 |
| Other - TechnicalFile: Order 50.pdf | 8 Jan 2025 |
| Layout approvalFile: Commercial MLCP for RERA_compressed - converted.pdf | 7 Jan 2025 |
| Building plan approvalFile: 36_Commercial MLCP - converted.pdf | 7 Jan 2025 |
| Building plan approvalFile: 38 - converted_rotated.pdf | 7 Jan 2025 |
| PAN CardFile: 1 PAN Card (8).pdf | 7 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Finance Encum.pdf | 7 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Commercial MLCP for RERA_compressed - converted.pdf | 7 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 00_CC dated 16-07-2024_compressed.pdf | 7 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 36_Commercial MLCP - converted.pdf | 7 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 38 - converted_rotated.pdf | 7 Jan 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 7 Jan 2025 |
| CERSAI detailsFile: Cersai Decla.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Finance Encum.pdf | 7 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (11).pdf | 7 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Secure Unsecure.pdf | 7 Jan 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Lodha Belmondo - Tower 31P52100020172 | Belmondo, Pune | 85 | Mar 2019 | Completed | Mar 2025 | Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 178 other registrations, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kharadi Signet on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wagholi13,700+ in Pune
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Lodha Developers Limited
LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kharadi Signet is delayed beyond 31 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kharadi Signet?
The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kharadi Signet?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kharadi Signet?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kharadi Signet?
The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeepmkamble and associates; Engineer: K C Shah Consultants; Engineer: Awadheshkumar Yadav; Engineer: Sayantan Datta; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kharadi Signet?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback