ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Kharadi Pune Phase II -Tower 6

Registered No litigation declared Residential / Group Housing project

Kharadi Pune Phase II -Tower 6

By Lodha Developers Limited

RG-MH-86248 · RERA P52100051552 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 96%
6 of 162Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

Kharadi Pune Phase II -Tower 6 is a Residential / Group Housing project by Lodha Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100051552 on 27 Jun 2023. Possession is promised by 31 May 2027. 156 of the 162 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameKharadi Pune Phase II -Tower 6
  • TypeResidential / Group Housing
  • Location
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100051552
  • ReraGenie IDRG-MH-86248

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • DirectorsMukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Dharia
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJun 2023PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Current status

96%156 of 162 units booked
94.5%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kharadi Tower 6NA25251620162

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 96%.

Kharadi Tower 6: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered49

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,830 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025
LandownerVillageDistrict
Ankit GoelPune (M Corp.)Pune
Annuj GoelPune (M Corp.)Pune
Rajendra GoelPune (M Corp.)Pune
Sanjay PaleshaPune (M Corp.)Pune
Kavita PaleshaPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI16580.3
Proposed, not sanctioned9,290 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndiabulls,Lower Parel
Estimated costRs 86.25 cr
Cost incurredRs 81.47 cr
Work done94.46%
BuildingWingEstimatedIncurred
Kharadi Tower 6NARs 56.06 crRs 51.37 cr
-NARs 30.19 crRs 30.10 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeepmkamble and associates
EngineerKrishna Lalsare
EngineerK C Shah Consultants
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A
PartnerRole in project
Lodha Developers Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Kharadi Pune Phase II -Tower 6 - P52100051552.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 - Kharadi Pune Phase II Tower 6 - P52100051552-Mar-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: From 1 Kharadi T-6 Dec-25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 - Kharadi Tower 6 - Dec 25.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 Kharadi Tower 6 - Dec 25.pdf24 Jan 2026
Layout approvalFile: T6 Layout.pdf27 Oct 2025
Layout approvalFile: T6 Layout.pdf27 Oct 2025
Withdrawal Update Form 1File: Kharadi Pune Phase II -Tower 6-scan.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 - Kharadi T6 - Sep 25.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 - Kharadi T6.pdf27 Oct 2025
Building plan approvalFile: Building Plan 1_T6.pdf14 Oct 2025
Building plan approvalFile: Building Plan 2 T6.pdf14 Oct 2025
Building plan approvalFile: Building Plan 3 T6.pdf14 Oct 2025
Building plan approvalFile: Building Plan 4 T6.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Kharadi Pune Phase II Tower 6.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Kharadi Pune Phase II Tower 6 - P52100051552 - Form 2A.pdf25 Aug 2025
Form 1File: Kharadi Pune - Tower 6 - Form1 - June 25.pdf18 Jul 2025
Form 2File: Form 2 - Kharadi T6 - Jun 25.pdf18 Jul 2025
Form 3File: Form 3 - Kharadi Tower 6 - Jun 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Kharadi T6 - Jun 25.pdf18 Jul 2025
Form 1File: Kharadi Pune Phase II Tower 6.pdf6 May 2025
Form 2File: Form 2 - Kharadi Tower 6 - Mar 25.pdf6 May 2025
Form 3File: Form 3 - Kharadi Tower 6 - Mar 25.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Kharadi Phase 2 Tower 6 - Mar 25.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase II Tower 6.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kharadi Tower 6 - Mar 25.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Tower 6 - Mar 25.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Phase 2 Tower 6 - Mar 25.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune phase II Tower 6.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kharadi Tower 6_compressed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Tower 6_compressed.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Kharadi Tower 6 - Sold Unsold_compressed.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kharadi Pune Phase II Tower 6 - Form 2.pdf23 Dec 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase II Tower 6.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kharadi Pune Phase II Tower 6.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi pune tower 6.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P52100051552 - Kharadi Pune Phase II Tower 6.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Kharadi Pune Phase II Tower 6 - P52100051552.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase II Tower 6 - P52100051552 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase II Tower 6 - P52100051552 - June24.pdf7 Aug 2024
Building plan approvalFile: 19_T6_compressed - converted_rotated.pdf21 Jul 2024
Building plan approvalFile: 20_compressed - converted_rotated.pdf21 Jul 2024
Building plan approvalFile: 21_compressed.pdf21 Jul 2024
Building plan approvalFile: 22_compressed.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 19_T6_compressed - converted_rotated.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 20_compressed - converted_rotated.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 21_compressed.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 22_compressed.pdf21 Jul 2024
Layout approvalFile: T6-compressed.pdf20 Jul 2024
Copy of Layout Approval (in case of layout)File: T6-compressed.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Kharadi Revised CC dtd.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: Kharadi Pune Phase II Tower 6.pdf12 Jun 2024
Details of encumbrances concerned to LegalFile: Kharadi Pune Phase II Tower 6.pdf12 Jun 2024
Layout approvalFile: T6 - converted.pdf7 Jun 2024
Copy of Layout Approval (in case of layout)File: T6 - converted.pdf7 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Pune Phase II Tower 6 - P52100051552 - March 24.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Pune Phase II Tower 6 - P52100051552 - March 24.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Kharadi Pune Phase II Tower 6 - March 24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kharadi Pune Phase II Tower 6 - P52100051552 - March 24.pdf7 May 2024
Details of encumbrances concerned to FinanceFile: Kharadi Pune Phase II Tower 6.pdf23 Apr 2024
Details of encumbrances concerned to LegalFile: Kharadi Pune Phase II Tower 6.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Pune Phase II Tower 6 - P52100051552 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Kharadi Pune Phase II Tower 6 - P52100051552 - Dec23.pdf26 Feb 2024
Layout approvalFile: 01 Layout R4 05 01 2024 compressed.pdf18 Jan 2024
Building plan approvalFile: 29_T6.pdf18 Jan 2024
Building plan approvalFile: 30 T6.pdf18 Jan 2024
Building plan approvalFile: 31 T6.pdf18 Jan 2024
Building plan approvalFile: 32 T6.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 01 Layout R4 05 01 2024 compressed.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 29_T6.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 30 T6.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 31 T6.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 32 T6.pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 00 CC Kharadi R4 05 01 2024 compressed.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase II Tower 6 - Sold Unsold - Sep23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase II Tower 6 - Form1 - Sep23.pdf21 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 4423 - 5-9-23 - CC - Compress.pdf4 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Lodha Belmondo - Tower 31P52100020172Belmondo, Pune85Mar 2019CompletedMar 2025Apr 2024

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kharadi Pune Phase II -Tower 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kharadi Pune Phase II -Tower 6 is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kharadi Pune Phase II -Tower 6?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kharadi Pune Phase II -Tower 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kharadi Pune Phase II -Tower 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kharadi Pune Phase II -Tower 6?

The professionals named in the filing: Architect: Pradeepmkamble and associates; Engineer: Krishna Lalsare; Engineer: K C Shah Consultants; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kharadi Pune Phase II -Tower 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kharadi Pune Phase II -Tower 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kharadi Pune Phase II -Tower 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.