ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Kharadi Pune Phase I -Tower 5

Registered No litigation declared Residential / Group Housing project

Kharadi Pune Phase I -Tower 5

By Lodha Developers Limited

RG-MH-79438 · RERA P52100048326 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 25%
9 of 169Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

Kharadi Pune Phase I -Tower 5 is a Residential / Group Housing project by Lodha Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100048326 on 26 Dec 2022. Possession is promised by 31 May 2027. 160 of the 169 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKharadi Pune Phase I -Tower 5
  • TypeResidential / Group Housing
  • Location
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100048326
  • ReraGenie IDRG-MH-79438

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • DirectorWTDRajendra Narpatmal Lodha
  • MdAbhishek Mangalprabhat Lodha
  • DirectorsMukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Dharia
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredDec 2022PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2022
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed146 files

Current status

95%160 of 169 units booked
95.5%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 5NA25251690169

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 25%.

Tower 5: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed181

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots181
Closed/Covered181

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,165 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025
LandownerVillageDistrict
Ankit GoelPune (M Corp.)Pune
Rajendra GoelPune (M Corp.)Pune
Sanjay PaleshaPune (M Corp.)Pune
Kavita PaleshaPune (M Corp.)Pune
Annuj GoelPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI14561.43
Proposed, not sanctioned1,272 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNehru Centre, 9th Floor, Discovery of india, Dr A B Road, Worli Mumbai 400018 India
Estimated costRs 83.55 cr
Cost incurredRs 79.78 cr
Work done95.49%
BuildingWingEstimatedIncurred
Tower 5NARs 54.31 crRs 50.95 cr
-NARs 29.24 crRs 28.84 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeepmkamble and associates
EngineerKrishna Lalsare
EngineerK C Shah Consultants
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A
PartnerRole in project
Lodha Developers Limited-

Litigation declared1

CaseCourtStatus
1042/2022Civil Judge Senior DivisionPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Kharadi Pune Phase I -Tower 5 - P52100048326.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 -Kharadi Pune Phase I Tower 5 - P52100048326- Mar-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: From 1 Kharadi T-5 Dec-25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 Kharadi T5.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 - Kharadi Tower 5 - Dec 25.pdf24 Jan 2026
Layout approvalFile: T5 layout Kharadi.pdf27 Oct 2025
Withdrawal Update Form 1File: Kharadi Pune Phase I -Tower 5-scan.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 - Kharadi T5 - Sep 25.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 - Kharadi T5.pdf27 Oct 2025
Building plan approvalFile: Building Plan 1 T5.pdf14 Oct 2025
Building plan approvalFile: Building Plan 2 T5.pdf14 Oct 2025
Building plan approvalFile: Building Plan 3 T5.pdf14 Oct 2025
Building plan approvalFile: Building Plan 4 T5.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Kharadi Pune Phase I Tower 5.pdf14 Oct 2025
Form 1File: Building Plan T5.pdf16 Sep 2025
Form 2File: Building Plan 17.pdf16 Sep 2025
Form 3File: Building Plan 18.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Building Plan 16.pdf16 Sep 2025
OthersFile: 00_Commencement Certificate.pdf16 Sep 2025
Form 2A (FY 2024-2025)File: Kharadi Pune Phase I Tower 5 - P52100048326 - Form 2A.pdf25 Aug 2025
Form 1File: Kharadi Pune - Tower 5 - Form1 - June 25.pdf18 Jul 2025
Form 2File: Form 2 - Kharadi T5 - Jun 25.pdf18 Jul 2025
Form 3File: Form 3 - Kharadi Tower 5 - Jun 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Kharadi T5 - Jun 25.pdf18 Jul 2025
Form 1File: Kharadi Pune Phase I Tower 5.pdf6 May 2025
Form 2File: Form 2 - Kharadi Tower 5 - Mar 25.pdf6 May 2025
Form 3File: Form 3 - Kharadi Tower 5 - Mar 25.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Kharadi Phase 2 Tower 5 - Mar 25.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase I Tower 5.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kharadi Tower 5 - Mar 25.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Tower 5 - Mar 25.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Phase 2 Tower 5 - Mar 25.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase I Tower 5.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kharadi Tower 5 - Dec 24 - Compress.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Tower 5 - Dec 24 - Compress.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Tower 5 - Dec 24 - Compress.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kharadi tower 5 - bank Correction.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kharadi tower 5 - bank Correction.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kharadi tower 5 - Sep24.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi pune Tower 5 - Sep24.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase 2 Tower 5.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Kharadi Tower 5.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase 2 Tower 5.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi pune tower 5.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P52100048326 - Kharadi Pune Phase I Tower 5.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Kharadi Pune Phase I Tower 5 - P52100048326.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kharadi Pune Phase I Tower 5 - P52100048326 - June24.pdf10 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 5.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: Kharadi Pune Phase I Tower 5 - P52100048326 - June24.pdf8 Aug 2024
Building plan approvalFile: 15_T5_compressed_rotated - converted.pdf21 Jul 2024
Building plan approvalFile: 16_compressed_rotated - converted.pdf21 Jul 2024
Building plan approvalFile: 17_compressed.pdf21 Jul 2024
Building plan approvalFile: 18_compressed.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 15_T5_compressed_rotated - converted.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 16_compressed_rotated - converted.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 17_compressed.pdf21 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 18_compressed.pdf21 Jul 2024
Layout approvalFile: T5-compressed.pdf20 Jul 2024
Copy of Layout Approval (in case of layout)File: T5-compressed.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Kharadi Revised CC dtd.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: Kharadi Pune Phase I Tower 5.pdf12 Jun 2024
Details of encumbrances concerned to LegalFile: Kharadi Pune Phase I Tower 5.pdf12 Jun 2024
Layout approvalFile: T5 - converted.pdf7 Jun 2024
Layout approvalFile: CC_compressed.pdf7 Jun 2024
Copy of Layout Approval (in case of layout)File: T5 - converted.pdf7 Jun 2024
Copy of Layout Approval (in case of layout)File: CC_compressed.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Pune Phase I Tower 5 - P52100048326 - March 24.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Kharadi Pune Phase I Tower 5 - March 24.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kharadi Pune Phase I Tower 5 - P52100048326 - March 24.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Kharadi Pune Phase I Tower 5 - march 23.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kharadi Pune Phase I Tower 5 - P52100048326 - March 24.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kharadi Pune Phase I Tower 5 - Form3 - Dec23.pdf26 Apr 2024
Details of encumbrances concerned to FinanceFile: Kharadi Pune Phase I Tower 5.pdf23 Apr 2024
Details of encumbrances concerned to LegalFile: Kharadi Pune Phase I Tower 5.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - Kharadi Pune Phase I Tower 5 - P52100048326 - Dec23.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Kharadi Pune Phase I Tower 5 - P52100048326 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Kharadi Pune Phase I Tower 5 - P52100048326 - Dec23.pdf26 Feb 2024
Layout approvalFile: 01 Layout R4 05 01 2024 compressed.pdf18 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Lodha Belmondo - Tower 31P52100020172Belmondo, Pune85Mar 2019CompletedMar 2025Apr 2024

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kharadi Pune Phase I -Tower 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kharadi Pune Phase I -Tower 5 is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kharadi Pune Phase I -Tower 5?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kharadi Pune Phase I -Tower 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kharadi Pune Phase I -Tower 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kharadi Pune Phase I -Tower 5?

The professionals named in the filing: Architect: Pradeepmkamble and associates; Engineer: Krishna Lalsare; Engineer: K C Shah Consultants; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kharadi Pune Phase I -Tower 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kharadi Pune Phase I -Tower 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kharadi Pune Phase I -Tower 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.