Red flags

  • Completion date moved by 78 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 78 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
179 of 207Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Keshavpada is a Others project by Namah Realtors in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009189 on 22 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 78 months from the original filing. 28 of the 207 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameKeshavpada
  • TypeOthers
  • Location
    • P.K.Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009189
  • ReraGenie IDRG-MH-27286

Builder

  • NameNamah Realtors
  • Entity typePartnership
  • PartnersASHOK CHAMPALAL KHIMAVAT, ASHOK VISHANJI PASAD

Key dates

this monthRegisteredAug 2017First promiseJun 2022Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2022)
  • Buildings2 building records
  • Documents filed81 files

Current status

14%28 of 207 units booked
41.5%Work done, per cost certificate

Figures as on 21 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KeshavpadaNA13131230123
Orchid SolitaireNA302284084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

Keshavpada57%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Orchid Solitaire71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 21 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered49
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,780 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Sai ConstructionThane (M Corp.)Thane

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI8340.78
Proposed, not sanctioned6,759 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJaya Talkies SV Road
Estimated costRs 46.98 cr
Cost incurredRs 19.47 cr
Work done41.45%
BuildingWingEstimatedIncurred
-NARs 24.99 crRs 7.04 cr
KeshavpadaNARs 11.00 crRs 6.22 cr
Orchid SolitaireNARs 11.00 crRs 6.22 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishwas Satodia
EngineerSURA & ASSOCIATES
EngineerMohan Manekar
Chartered AccountantS C Kapadia & Co
Chartered AccountantR KAPADIA & ASS0CIATES
Chartered AccountantD.C Dholakia & Co.
PartnerRole in project
Namah Realtor-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009350Jun 2022 → Jun 2023

Reason as filed by the promoterWe have obtained amended plans and re-endorsed CC attached following which COVID affected our work. We request you to issue us an extension towards completion of work. Kindly oblige.

EXT51800017946Jun 2022 → Dec 2025

Reason as filed by the promoterObtained further CC on 4th September 2023 (cc copy enclosed). We have obtained consent in the prescribed format from more than 51% allottee/s. Kindly oblige.

EA21082622319Jun 2022 → Dec 2028

Reason as filed by the promoterSubject: Submission of Technical Reasons for Delay in Completion Of the Project - Keshavpada, Maha RERA Reg. No. P51800009189 Respected Sir, We, Namah Realtor, are the promoters of the real estate project known as "Keshavpada" bearing Maha RERA Registration No. P51800009189. Currently, the project got delay due to final clearance/handover approval for the Road Setback from the concerned municipal authorities e.g., BMC / Municipal Corporation. As per the standard regulatory workflow, the issuance of the further Commencement Certificate (CC) for the upper floors/next phase is strictly linked to

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 26 NAMAH.pdf21 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Sep 2026
Withdrawal Update Form 2File: FORM 2 MAR26 NAMAH.pdf21 Sep 2026
Withdrawal Update Form 2File: form 2.pdf21 Sep 2026
Withdrawal Update Form 3File: FORM 3 MAR26 NAMAH.pdf21 Sep 2026
Withdrawal Update Form 3File: FORM 3 JUN 26 NAMAH.pdf21 Sep 2026
Form 2A (FY 2025-2026)File: form 2A.pdf21 Aug 2026
Withdrawal Update Form 1File: FORM 1 JUN 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 1File: FORM 1 JUN 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 1File: FORM 1 SEP 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 1File: FORM 1 DEC25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 2File: form 2.pdf19 Aug 2026
Withdrawal Update Form 2File: form 2.pdf19 Aug 2026
Withdrawal Update Form 2File: FORM 2 SEP 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 2File: FORM 2 DEC 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 3File: FORM 3 JUN 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 3File: FORM 3 JUN 25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 3File: FORM 3 SEP25 NAMAH.pdf19 Aug 2026
Withdrawal Update Form 3File: FORM 3 DEC 25 NAMAH.pdf19 Aug 2026
Certificates of CA (Form 3)File: FORM_ 3 MAR25 NAMAH_compressed.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM_2 MAR25 NAMAH.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Namah Form 2A Mar25.pdf6 May 2025
Certificates of CA (Form 3)File: NAMAH FORM_3 rera_DEC'24.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC'24 NAMAH.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: namah Rera Disclosure.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure letter namah.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineers Certificate rera NAMAH.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Architect Certificate Namah.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold _ Booked INVENTORY Namah.pdf10 Jan 2024
Declaration in FORM BFile: Affidavit cum Declaration Namah Realtor.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD _ BOOKED INVENTORY NAMAH Rera.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NAMAH BS FY 18 19 part 1.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NAMAH BS FY 18 19 part 2.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NAMAH BS FY 19 20 part 1.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NAMAH BS FY 19 20 part 2.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NAMAH BS FY 20 21 part 1.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NAMAH BS FY 20 21 part 2.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NAMAH BS FY 21 22 part 1.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NAMAH BS FY 21 22 part 2.pdf8 Jan 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC NAMAH.pdf13 Dec 2023
Certificates of CA (Form 3)File: FORM 3 NAMAH REALTOR.pdf13 Dec 2023
Certificates of CA (Form 5)File: FORM 5 NAMAH REALTOR.pdf13 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 NAMAH REALTOR.pdf13 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 4th Sept 2023.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form-2 Engineers Certificate Namah.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA FORM-2A Engineers certificate for Quality Assurance Namah.pdf25 Nov 2023
Certificates of CA (Form 3)File: Rera Form 3 Namah Mulund.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Namah Realtor.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest Namah.pdf2 Feb 2023
Proforma of Allotment letterFile: Allotment letter Draft Namah.pdf2 Feb 2023
Proforma of Agreement for saleFile: Draft Rera Agreement for Sale.pdf2 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Namah.pdf2 Feb 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate Namah.pdf31 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate Namah.pdf31 Jan 2023
Declaration about Commencement CertificateFile: Declaration about C C Certificate Namah.pdf31 Jan 2023
CERSAI detailsFile: CERSAI Undertaking letter Namah.pdf31 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seaparate bank account Format A Namah.pdf31 Jan 2023
PAN CardFile: Pan Card Namah Realtor.pdf15 Jan 2022
Building plan approvalFile: Keshavpada IOA.pdf20 Mar 2021
Layout approvalFile: Keshavpada LOI.pdf20 Mar 2021
Copy of Layout Approval (in case of layout)File: Keshavpada LOI.pdf20 Mar 2021
Building Plan Approval (IOD)File: Keshavpada IOA.pdf20 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Keshavpada CC.pdf20 Mar 2021
Certificates of CA (Form 5)File: form5.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Composite bldg.pdf7 Apr 2018
Declaration in FORM BFile: Form B Namah Realtor.pdf30 Dec 2017
Declaration in FORM BFile: Form B Sai Const.pdf30 Dec 2017
Layout approvalFile: 3 Block Plan.pdf28 Dec 2017
Copy of Layout Approval (in case of layout)File: 3 Block Plan.pdf28 Dec 2017
Copy of the legal title reportFile: Title Certificate.pdf31 Jul 2017
Details of encumbrancesFile: No Encumbrances Decl.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Site Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Cetificate for RERA small size.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement Decl.pdf31 Jul 2017
Layout approvalFile: 2 Lay Out Plan.pdf29 Jul 2017
Building plan approvalFile: 1 IOD.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 2 Lay Out Plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: 1 IOD.pdf29 Jul 2017
Declaration in FORM BFile: Namah Form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for Rera Wing A- Keshavpada Project.pdf29 Jul 2017

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 78 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Keshavpada on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmKeshavpadaCompleted 125Lapsed / revoked 98Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: Namah Realtors

Namah Realtors has 1 registration on MahaRERA, including Keshavpada. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Keshavpada is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Keshavpada?

The registered promoter entity is Namah Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Keshavpada?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Keshavpada?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Keshavpada?

The professionals named in the filing: Architect: Vishwas Satodia; Engineer: SURA & ASSOCIATES; Engineer: Mohan Manekar; Chartered Accountant: S C Kapadia & Co; Chartered Accountant: R KAPADIA & ASS0CIATES; Chartered Accountant: D.C Dholakia & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Keshavpada?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Keshavpada. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Keshavpada to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.