ReraGenieLog inGet a buyer report

Home / Browse projects / Amravati, Maharashtra / KESHAV EMPIRE PHASE II

Registered No litigation declared Residential / Group Housing project

KESHAV EMPIRE PHASE II

By SACHIN KESHAORAO INGOLE

RG-MH-05018 · RERA P50300053753 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 7.00 crore secured on the land, in favour of STATE BANK OF INDIA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
103 of 112Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

KESHAV EMPIRE PHASE II is a Residential / Group Housing project by SACHIN KESHAORAO INGOLE in Amravati, Maharashtra, registered with MahaRERA as P50300053753 on 28 Nov 2023. Possession is promised by 31 Jul 2029. 9 of the 112 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKESHAV EMPIRE PHASE II
  • TypeResidential / Group Housing
  • Location
    • BADNERA SURVEY NUMBER 319/3-A
    • PLOT NO 1
    • Badnera
    • Amravati
    • 444701
  • Pincode444701
  • RERA no.P50300053753
  • ReraGenie IDRG-MH-05018

Builder

  • NameSACHIN KESHAORAO INGOLE
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2023PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2023
  • Promised completion31 Jul 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed76 files

Current status

8%9 of 112 units booked
67.6%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-ANA1010402262
WING-BNA8750050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

WING-A42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-B41%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered194
BuildingClosed/CoveredTotal
WING-A120120
WING-B7474

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,260 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on26 Feb 2026

Approvals and building plan

Sanctioning authorityAMRAVATI MUNICIPAL CORPORATION
Permissible FSI8134.56
Proposed, not sanctioned8,135 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch11, SAI NAGAR, INFRONT OF SAI MANDIR, AMRAVATI - 444607
Estimated costRs 17.03 cr
Cost incurredRs 11.52 cr
Work done67.63%
BuildingWingEstimatedIncurred
WING-ANARs 10.02 crRs 6.78 cr
WING-BNARs 7.01 crRs 4.74 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH NAGPURE
EngineerAMIT MEHARE
EngineerGIRISH NAGPURE AND ASSOCIATES
Chartered AccountantMANISH KHUSHLANI
Chartered AccountantTUSHAR SOJRANI
PartnerRole in project
SACHIN KESHAORAO INGOLE-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600222Mrinal KatkarSACHIN KESHAORAO INGOLE01/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf12 May 2026
Withdrawal Update Form 1File: FORM 1.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2.pdf12 May 2026
Withdrawal Update Form 3File: form 3.pdf12 May 2026
Withdrawal Update Form 3File: form 3.pdf12 May 2026
Withdrawal Update Form 1File: form 1 of kes.pdf16 Mar 2026
Withdrawal Update Form 2File: form 2 of Kesh.pdf16 Mar 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf16 Mar 2026
Form 2A (FY 2024-2025)File: form 2A of keshv.pdf16 Mar 2026
Withdrawal Update Form 1File: FORM 2.pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 1.pdf13 Mar 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf13 Mar 2026
Form 1File: FORM 2.pdf18 Feb 2026
Form 2File: FORM 1.pdf18 Feb 2026
Form 3File: FORM 3_compressed.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3 2025-26.pdf18 Feb 2026
Form 3File: FORM 3 KI2 31122024_20260217_0001.pdf17 Feb 2026
Form 1File: FORM 1 311224.pdf17 Feb 2026
Form 2File: FORM 2 311224.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3 2024-25.pdf17 Feb 2026
Form 3File: FORM 3 KI2 31032025_20260217_0001.pdf17 Feb 2026
Form 1File: FORM 1 KI2 30625.pdf17 Feb 2026
Form 2File: FORM 2 KI2 30625.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q4 2024-25.pdf17 Feb 2026
Form 1File: FORM 1 KI2 30625.pdf17 Feb 2026
Form 2File: FORM 2 KI2 30625.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q1 2025-26.pdf17 Feb 2026
Form 3File: FORM 3 KE 30062025_20260217_0001.pdf17 Feb 2026
Form 5 (FY 2023-2024)File: FORM 5 KE2 23-24_20260217_0001.pdf17 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 24-25 KE2_20260217_0001.pdf17 Feb 2026
Form 1File: FORM 1 30624.pdf15 Feb 2026
Form 2File: FORM 2 30624.pdf15 Feb 2026
Form 3File: Form 3 KI2 311223.pdf15 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3 23-24.pdf15 Feb 2026
Form 1File: FORM 1 30624.pdf15 Feb 2026
Form 2File: FORM 2 30624.pdf15 Feb 2026
Form 3File: FORM 3 KI2 31324.pdf15 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q4 2023-24.pdf15 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q1 24-25.pdf15 Feb 2026
Form 1File: FORM 1 30624.pdf15 Feb 2026
Form 2File: FORM 2 30624.pdf15 Feb 2026
Form 3File: FORM 3 KI2 30624.pdf15 Feb 2026
Form 1File: FORM 1 311224.pdf15 Feb 2026
Form 2File: FORM 2 311224.pdf15 Feb 2026
Form 3File: FORM 3 KI2 30924.pdf15 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q2 24-25.pdf15 Feb 2026
Form 3File: FORM 3 KI2 30925.pdf15 Feb 2026
Form 1File: FORM 1 KI2 309M25.pdf15 Feb 2026
Form 2File: FORM 2 KI2 30925.pdf15 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q2 2025-26.pdf15 Feb 2026
Building plan approvalFile: March22989 (1)_compressed.pdf8 Nov 2023
Building plan approvalFile: March22990_compressed.pdf8 Nov 2023
Building plan approvalFile: March22991 (1)_compressed (1).pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: March22989 (1)_compressed.pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: March22990_compressed.pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: March22991 (1)_compressed (1).pdf8 Nov 2023
Declaration in FORM BFile: FORM B.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf8 Nov 2023
CERSAI detailsFile: CERSAI.pdf23 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf23 Oct 2023
Copy of the legal title reportFile: LSR NEW_compressed.pdf16 Oct 2023
Declaration about Commencement CertificateFile: Declaration about cmmencement certificate.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Disclosure of Interest.pdf25 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf25 Sep 2023
Proforma of Agreement for saleFile: ATS_compressed (1).pdf25 Sep 2023
Proforma of Allotment letterFile: AL.pdf25 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation wrt ATS.pdf25 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation wrt ATS.pdf25 Sep 2023
Layout approvalFile: NA ORDER_compressed.pdf22 Sep 2023
PAN CardFile: PAN.pdf22 Sep 2023
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE FINANCIAL AND LEGAL.pdf22 Sep 2023
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE FINANCIAL AND LEGAL.pdf22 Sep 2023
Copy of Layout Approval (in case of layout)File: NA ORDER_compressed.pdf22 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: AMC APPROVAL.pdf22 Sep 2023

How this compares with Amravati

8%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep KESHAV EMPIRE PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 1450+ in Amravati

Builder: SACHIN KESHAORAO INGOLE

SACHIN KESHAORAO INGOLE has 2 registrations on MahaRERA, including KESHAV EMPIRE PHASE I and KESHAV EMPIRE PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if KESHAV EMPIRE PHASE II is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KESHAV EMPIRE PHASE II?

The registered promoter entity is SACHIN KESHAORAO INGOLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KESHAV EMPIRE PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KESHAV EMPIRE PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KESHAV EMPIRE PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KESHAV EMPIRE PHASE II?

The professionals named in the filing: Architect: GIRISH NAGPURE; Engineer: AMIT MEHARE; Engineer: GIRISH NAGPURE AND ASSOCIATES; Chartered Accountant: MANISH KHUSHLANI; Chartered Accountant: TUSHAR SOJRANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KESHAV EMPIRE PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KESHAV EMPIRE PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KESHAV EMPIRE PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.