New projects and RERA data in Amravati district, Maharashtra

454 projects are registered in Amravati district: 6,049 units across them, 20 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

454Projects covered
20Registered, last 12 months
6,049Units declared
5,287Units not yet booked
37Completion dates revised
0With declared litigation

Of the 454 covered registrations, 37 have revised their promised completion date and 0 declare litigation. The median project here is 0% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Amravati projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 454 projects with a promised date, 202 are recorded delivered, 98 are still on the register and 154 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 3 projects, delivered2017: 2 projects, registration lapsed or cancelled’172018: 14 projects, delivered2018: 3 projects, registration lapsed or cancelled’182019: 38 projects, delivered2019: 2 projects, registration lapsed or cancelled’192020: 16 projects, delivered2020: 15 projects, registration lapsed or cancelled’202021: 16 projects, delivered2021: 12 projects, registration lapsed or cancelled’212022: 32 projects, delivered2022: 20 projects, registration lapsed or cancelled’222023: 27 projects, delivered2023: 20 projects, registration lapsed or cancelled’232024: 23 projects, delivered2024: 23 projects, registration lapsed or cancelled’242025: 14 projects, delivered2025: 42 projects, registration lapsed or cancelled’252026: 9 projects, delivered2026: 15 projects, on the register2026: 14 projects, registration lapsed or cancelled’262027: 4 projects, delivered2027: 26 projects, on the register’272028: 3 projects, delivered2028: 29 projects, on the register2028: 1 projects, registration lapsed or cancelled’282029: 2 projects, delivered2029: 16 projects, on the register’292030: 1 projects, delivered2030: 8 projects, on the register’302031: 3 projects, on the register’312032: 1 projects, on the register’32

132 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05001,0001,5002,000today’172018: 35 flats, registration lapsed or cancelled (only 1 of 17 projects filed a flat count)’182019: 219 flats, delivered (only 7 of 40 projects filed a flat count)’192020: 30 flats, delivered (only 2 of 31 projects filed a flat count)2020: 126 flats, registration lapsed or cancelled (only 2 of 31 projects filed a flat count)’202021: 49 flats, registration lapsed or cancelled (only 2 of 28 projects filed a flat count)’212022: 432 flats, delivered (only 5 of 52 projects filed a flat count)2022: 32 flats, registration lapsed or cancelled (only 5 of 52 projects filed a flat count)’222023: 169 flats, registration lapsed or cancelled (only 2 of 47 projects filed a flat count)’232024: 43 flats, delivered (only 3 of 46 projects filed a flat count)2024: 59 flats, registration lapsed or cancelled (only 3 of 46 projects filed a flat count)’242025: 434 flats, registration lapsed or cancelled (only 10 of 56 projects filed a flat count)’252026: 32 flats, delivered (only 11 of 38 projects filed a flat count)2026: 574 flats, on the register (only 11 of 38 projects filed a flat count)2026: 175 flats, registration lapsed or cancelled (only 11 of 38 projects filed a flat count)’262027: 41 flats, delivered (only 10 of 30 projects filed a flat count)2027: 306 flats, on the register (only 10 of 30 projects filed a flat count)’272028: 28 flats, delivered2028: 1,166 flats, on the register’282029: 591 flats, on the register’292030: 1,108 flats, on the register’302031: 312 flats, on the register’312032: 88 flats, on the register’32

4,421 flats are promised in 2026 or later, across the 52% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Amravati possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 37 of 454 projects (8%) have moved at least once; the median move is 18 months and the longest is 73 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 5 projects kept the original date, 100% of the year’17Originally due 2018: 17 projects kept the original date, 71% of the yearOriginally due 2018: 4 projects moved by under 2 years, 17% of the yearOriginally due 2018: 3 projects moved by 2 years or more, 12% of the year’18Originally due 2019: 38 projects kept the original date, 86% of the yearOriginally due 2019: 4 projects moved by under 2 years, 9% of the yearOriginally due 2019: 2 projects moved by 2 years or more, 5% of the year’19Originally due 2020: 26 projects kept the original date, 84% of the yearOriginally due 2020: 2 projects moved by under 2 years, 6% of the yearOriginally due 2020: 3 projects moved by 2 years or more, 10% of the year’20Originally due 2021: 22 projects kept the original date, 85% of the yearOriginally due 2021: 4 projects moved by under 2 years, 15% of the year’21Originally due 2022: 48 projects kept the original date, 96% of the yearOriginally due 2022: 1 projects moved by under 2 years, 2% of the yearOriginally due 2022: 1 projects moved by 2 years or more, 2% of the year’22Originally due 2023: 42 projects kept the original date, 95% of the yearOriginally due 2023: 1 projects moved by under 2 years, 2% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 2% of the year’23Originally due 2024: 45 projects kept the original date, 92% of the yearOriginally due 2024: 2 projects moved by under 2 years, 4% of the yearOriginally due 2024: 2 projects moved by 2 years or more, 4% of the year’24Originally due 2025: 53 projects kept the original date, 90% of the yearOriginally due 2025: 4 projects moved by under 2 years, 7% of the yearOriginally due 2025: 2 projects moved by 2 years or more, 3% of the year’25Originally due 2026: 33 projects kept the original date, 97% of the yearOriginally due 2026: 1 projects moved by under 2 years, 3% of the year’26Originally due 2027: 29 projects kept the original date, 100% of the year’27Originally due 2028: 30 projects kept the original date, 100% of the year’28Originally due 2029: 16 projects kept the original date, 100% of the year’29Originally due 2030: 9 projects kept the original date, 100% of the year’30Originally due 2031: 3 projects kept the original date, 100% of the year’31Originally due 2032: 1 projects kept the original date, 100% of the year’32

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05001,0001,5002,000’17Originally due 2018: 35 flats kept the original date, 71% of the year (only 1 of 24 projects filed a flat count)’18Originally due 2019: 219 flats kept the original date, 86% of the year (only 8 of 44 projects filed a flat count)Originally due 2019: 126 flats moved by under 2 years, 9% of the year (only 8 of 44 projects filed a flat count)’19Originally due 2020: 30 flats kept the original date, 84% of the year (only 1 of 31 projects filed a flat count)’20Originally due 2021: 49 flats kept the original date, 85% of the year (only 2 of 26 projects filed a flat count)’21Originally due 2022: 464 flats kept the original date, 96% of the year (only 6 of 50 projects filed a flat count)Originally due 2022: 82 flats moved by 2 years or more, 2% of the year (only 6 of 50 projects filed a flat count)’22Originally due 2023: 169 flats kept the original date, 95% of the year (only 3 of 44 projects filed a flat count)Originally due 2023: 56 flats moved by 2 years or more, 2% of the year (only 3 of 44 projects filed a flat count)’23Originally due 2024: 102 flats kept the original date, 92% of the year (only 4 of 49 projects filed a flat count)Originally due 2024: 49 flats moved by 2 years or more, 4% of the year (only 4 of 49 projects filed a flat count)’24Originally due 2025: 434 flats kept the original date, 90% of the year (only 15 of 59 projects filed a flat count)Originally due 2025: 530 flats moved by under 2 years, 7% of the year (only 15 of 59 projects filed a flat count)Originally due 2025: 286 flats moved by 2 years or more, 3% of the year (only 15 of 59 projects filed a flat count)’25Originally due 2026: 202 flats kept the original date, 97% of the year (only 8 of 34 projects filed a flat count)Originally due 2026: 29 flats moved by under 2 years, 3% of the year (only 8 of 34 projects filed a flat count)’26Originally due 2027: 318 flats kept the original date, 100% of the year (only 9 of 29 projects filed a flat count)’27Originally due 2028: 932 flats kept the original date, 100% of the year’28Originally due 2029: 429 flats kept the original date, 100% of the year’29Originally due 2030: 1,108 flats kept the original date, 100% of the year’30Originally due 2031: 312 flats kept the original date, 100% of the year’31Originally due 2032: 88 flats kept the original date, 100% of the year’32

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Amravati

Who sanctions building in Amravati

85 of the 454 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Amravati Municipal Corporation71
13 other bodies14

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 454 registrations on this page answers this: on 370 the promoter is the only owner named; on 82 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 2 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Amravati: projects by taluka

454 of the 454 registrations on this page name their taluka.

TalukaProjectsShare
Amravati43496%
7 other talukas204%

Projects in Amravati

Showing 1 to 60 of 454 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Orange City CentreMouza Warud, Tahsil. Warud, Dist.-Amravati, 444906GAURINIDHI INFRAVENTURES LLP5070%13 Aug 2026Registered
GOVINDA NAGARIMOUJE RAHATGAON NEAR ESSAR PETROL PUMP, 444601SHRI GOVINDA PROPERTIES2110%31 Dec 2020Completed
Jai Amba Palm City- Areca Palm Wing A,B,CPlot No 1 Survey No 87/1/A Mouje Kathora Bu, 444602Grand Palm City LLP2040%5 Mar 2026Registered
AURA LIFESTYLECONGRESS NAGAR, 444606LIFESTYLE HOME SPACES2000%18 Mar 2026Registered
DATTA NAGARI 1BADNERA, 444701Vijay Nanakram Talda1990%31 Oct 2023Registration lapsed
Vivanta Infinity Private LimitedBiyani Square, Camp, 444602VIVANTA INFINITY PRIVATE LIMITED19765%15 Oct 2021Registered
DCC Dreamz City ChambersRallies Plot, 444601DREAMZ-CITY REAL ESTATE PVT LTD17920%7 Dec 2022Registered
DUBAI CITYGOPAL NAGAR SQUARE, 444601SKYLINE URBANSPACE LLP1670%27 Aug 2026Registered
PARIKRAMA GREENSAMRAVATI, 444606NITIN JUGALKISHOR CHENDULKAR16239%31 Aug 2017Registered
SAHYADRI HEIGHTSAMRAVATI UNOVERSITY SQUARE, 444602ANSHUMAN BUILDERS15436%22 Jun 2022Registration lapsed
SANKALP ICONRAHATGAON, 444602SANKALP DREAM SPACES LLP1260%29 Apr 2026Registered
SHRI GURU ANAND DHAMRevsa, 444801Sudhir Rameshrao Wakode12623%30 Nov 2017Registration lapsed
RACHANA SRUSHTI PHASE IISRUSHTI INFRA, 444602SRUSHTI INFRA12423%15 Feb 2023Registered
KESHAV EMPIRE PHASE IIPLOT NO 1, 444701SACHIN KESHAORAO INGOLE1128%28 Nov 2023Registered
CHANDANVADIAmravati, 444606SHRI AMARNATH BUILDERS AND DEVELOPERS979%14 Mar 2022Registered
Jai Amba Palm City- Queen Palm Wing A BPlot No 1 Survey No 87/1/A Mouje Kathora Bu, 444602M/s Grand Palm City LLP880%4 Jun 2026Registered
VEDAH PHASE 1NAVASARI, 444604TRENDBUILT LIFESPACES LLP880%6 Apr 2026Registered
Radha CityWalgaon-2, 444801Krishnagiri Developers860%12 Mar 2020Completed
Radha CityWalgaon, 444601Ravi sahu, Rupesh sahu And Deepak sahu850%18 Mar 2020Registration lapsed
SHREEKRUPA TOWNSHIPSAMARTH WADI, 444607CHHUGARAM LAHORIMAL KHATRI (HUF)840%23 Jan 2019Registration lapsed
VIJAYSHREE PARKAmravati, 444603PANKAJKUMAR RAMESHRAO DESHMUKH8415%21 Nov 2022Registered
RAJ TOWNSHIPOLD TOWN, BADNERA, 444701RAJ ASSOCIATES8229%5 Sep 2019Registered
Madhavam HeightsMauje - Rahatgaon, 444604Sky Line Infra Vision770%6 Aug 2024Registered
SHIVA SHRI APARTMENTGANU WADI IN FRONT OF LORDS HOTEL, 444607Jog Mahajan Infra Privet Limited7262%19 Jan 2023Registered
Lucky Orange CityAmravati, 444905Iqbal Haroon Kasmani690%24 Dec 2019Completed
CASA GrandAmravati, 444607Paras Buildcom6816%27 Jun 2023Registered
Harmony PrathameshPlot No 161/2 Survey No 161/2 Mouje Rahatgaon, 444602Radha Shrihari Builders And Developers LLP6611%9 Aug 2024Registered
Radha CityWalgaon-2, 444801Rahul sharma And Yogesh Gawande660%12 Mar 2020Completed
SAMRA ONEPLOT NO 31/2,32,33,34,35,36&37 SR NO. 10/1 PARWATI NAGAR MOUJA AKOLI, 444607SAMRA LUXURY PRIVATE LIMITED650%30 Dec 2025Registered
SHIVRAY COMMERCIALHOLLYWOOD COLONY, 444603SHIVRAY BUILDER5821%15 Feb 2024Registered
Green HeightsAmravati, 444601Aksha Builder and Developers564%1 Jul 2020Registered
MY ORCHID HEIGHTS PHASE IRahatgaon, 444602Nitin Bhatkar5620%31 May 2024Registered
LIFESTYLE HOMESMOUJE PETH AMRAVATI, 444607LIFESTYLE HOME SPACES5520%25 Jan 2024Registered
AMBER PRIDEMAHAJANPUR, 444605ABHIMANYU SANJAY RATHI520%8 Oct 2024Registered
JANNAT COMPLEXSurvey No. 47/1 Mouje - Navsari, 444604MOHAMMAD AAMIR AHMAD520%5 Oct 2026Registered
Aakar RegencyRahatgaon, 444602ROHIT ASHOKRAO JIWARKAR5116%21 Jan 2025Registered
DATTA NAGARI 2BADNERA, 444701Vijay Nanakram Talda500%23 Oct 2023Registration lapsed
UDAY NAGAR LAYOUT DAmravati (M Corp.), 444601DEVENDRA RAMACHANDRA CHANDAK500%2 Nov 2017Completed
SUMERU VEDANTA 2BENODA NEAR DASTUR NAGAR, 444606MARIGOLD REALITY4982%13 Sep 2021Registered
DATTA DHAMPRAGANE NANDGAON PETH, 444602MITRANGAN BUILDER & DEVELOPERS480%6 Jan 2020Registration lapsed
MOUJE BADNERA SURVEY NO. 13/2 A AND BBADNERA ROAD, 444701SUBHASH NANAKRAM TALDA482%23 May 2018Completed
UDAY NAGAR LAYOUT AAmravati (M Corp.), 444601UMESH RAMCHANDRA CHANDAK480%2 Nov 2017Completed
VARMA HEIGHTSMOUJA AKOLI, 444607DILIP NANDKISHOR VARMA460%28 Feb 2025Registered
ROYAL TOWERSAI NAGAR, 444607ANIL LAXMICHAND BOTHRA440%22 Sep 2023Registered
Dwarka CityNA, 444810Praful Shingote and 1 Other4340%4 Aug 2022Completed
LAKSHMI SHRI RESIMERCIALPeth Amravati, 444607Jog Mahajan Infra Private Limited430%17 Sep 2026Registered
MIDAS HEIGHTSOLD BIYANI SQUARE, 444602VASAVI VENTURE430%15 Oct 2021Registration lapsed
Vedanta HeightsMauje Benoda, 444606Vedanta Buildcon4248%22 Sep 2023Registration lapsed
AMRAVATI COMPLEXWARUD PART 2, 444906RANJANA SUNIL ZOMBADE4156%17 Oct 2023Registered
Raghuvir IconPlot No 3/2, 3/5 Sheet No- 49D, 49B, Mouja Tarkheda PETH AMRAVATI AS PER PR CARD, Dist.- Amravati, 444601Dilip Mangalbhai Popat400%10 Jun 2026Registered
VIJAY FORTUNESUREVY NO-92/2/B MOUJE - KATHORA BHURD, TQ/DIST AMRAVATI, 444604VIJAY PARANJAPE ESTATE LLP370%11 Feb 2026Registered
OMKAR GALAXYRamanand Residency, 444602Dinesh Ramraoji Dolare360%2 Mar 2026Registered
Shree Shiv Gajanan ResidencyPlot No 18,19 Survey No 78/1/A Mouje Peth, Amravati, 444601D.S Ganorkar and Company3631%29 Sep 2025Registered
ISHWARY COLONYAKOLI, 444607SAI SRUJAN BUILDERS & DEVELOPERS350%23 Jan 2018Registration lapsed
NAVODAYASATURNA, 444607Chirag Vinod Jajoo350%13 Aug 2025Registered
SOLARIS CUBEPLOT NO 657 SHEET NO 32 RATHI NAGAR MOUJA SHEGAON PRANGANE NANDGAONPETH, 444602SOLARIS INFRA350%11 Sep 2025Registered
Crystal PlazaPlot No 1/1, Survey No 29/1, Mouje Saturna, Amravati, 444607LAXMIKANT PRABHAKAR JOSHI333%24 Sep 2025Registered
AFFORDABLE HOUSING PROJECT MOUJA RAHATGAON S NO 116/2 PLOT NUMBER 24 TO 28AMRAVATI, 444601PMAY AMRAVATI MUNICIPAL CORPORATION320%23 Oct 2021Registration lapsed
Decent Shraddha ResidencyPlot No 15A/15B/16A/16B/17A/17B/18A/18B Survey No 62,123/2,123/3 Mouje Kathora Bu, 444602Jayant Parmanand Chhutlani320%10 Dec 2025Registered
RUKHMINI HEIGHTSMAUJE BENODA, 444908SADANI AND PATURDE BUILDERS LLP323%3 Jan 2024Registered
Planning a launch in Amravati? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Amravati

PMAY AMRAVATI MUNICIPAL CORPORATION (8), Vijay Nanakram Talda (7), M/S DREAMZ INFRASTRUCTURE (5), LAXMIKANT PRABHAKAR JOSHI (4), Jayant Parmanand Chhutlani (4), RAVINDRA PUNDLIKRAO MAHALLE (4). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Amravati projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 0% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Amravati project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Amravati district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Amravati registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Amravati project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Amravati district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.