New projects and RERA data in Amravati district, Maharashtra
449 of the projects in this build are in Amravati district: 5,168 units across them, 21 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.
Of the 449 covered registrations, 35 have revised their promised completion date and 0 declare litigation. The median project here is 0% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.
When Amravati projects promise possession
Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 449 projects with a promised date, 202 are recorded delivered, 91 are still on the register and 156 have a registration that has lapsed or been cancelled.
DeliveredOn the registerRegistration lapsed or cancelled
125 projects promise possession in 2026 or later. Facts as per filings on RERA website.
3,360 flats are promised in 2026 or later, across the 49% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.
How far Amravati possession dates have moved
Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 35 of 449 projects (8%) have moved at least once; the median move is 18 months and the longest is 73 months.
Kept the original dateMoved by under 2 yearsMoved by 2 years or more
Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.
Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.
Projects in Amravati
| Project | Developer | Units | Booked | Registered |
|---|---|---|---|---|
| GOVINDA NAGARI | SHRI GOVINDA PROPERTIES | 211 | 0% | 31 Dec 2020 |
| Jai Amba Palm City- Areca Palm Wing A,B,C | Grand Palm City LLP | 204 | 0% | 5 Mar 2026 |
| AURA LIFESTYLE | LIFESTYLE HOME SPACES | 200 | 0% | 18 Mar 2026 |
| DATTA NAGARI 1 | Vijay Nanakram Talda | 199 | 0% | 31 Oct 2023 |
| Vivanta Infinity Private Limited | VIVANTA INFINITY PRIVATE LIMITED | 197 | 65% | 15 Oct 2021 |
| DCC Dreamz City Chambers | DREAMZ-CITY REAL ESTATE PVT LTD | 179 | 20% | 7 Dec 2022 |
| PARIKRAMA GREENS | NITIN JUGALKISHOR CHENDULKAR | 162 | 39% | 31 Aug 2017 |
| SAHYADRI HEIGHTS | ANSHUMAN BUILDERS | 154 | 36% | 22 Jun 2022 |
| SHRI GURU ANAND DHAM | Sudhir Rameshrao Wakode | 126 | 23% | 30 Nov 2017 |
| SANKALP ICON | SANKALP DREAM SPACES LLP | 126 | 0% | 29 Apr 2026 |
| RACHANA SRUSHTI PHASE II | SRUSHTI INFRA | 124 | 10% | 15 Feb 2023 |
| KESHAV EMPIRE PHASE II | SACHIN KESHAORAO INGOLE | 112 | 8% | 28 Nov 2023 |
| CHANDANVADI | SHRI AMARNATH BUILDERS AND DEVELOPERS | 97 | 9% | 14 Mar 2022 |
| VEDAH PHASE 1 | TRENDBUILT LIFESPACES LLP | 88 | 0% | 6 Apr 2026 |
| Jai Amba Palm City- Queen Palm Wing A B | M/s Grand Palm City LLP | 88 | 0% | 4 Jun 2026 |
| Radha City | Krishnagiri Developers | 86 | 0% | 12 Mar 2020 |
| Radha City | Ravi sahu, Rupesh sahu And Deepak sahu | 85 | 0% | 18 Mar 2020 |
| SHREEKRUPA TOWNSHIP | CHHUGARAM LAHORIMAL KHATRI (HUF) | 84 | 0% | 23 Jan 2019 |
| VIJAYSHREE PARK | PANKAJKUMAR RAMESHRAO DESHMUKH | 84 | 15% | 21 Nov 2022 |
| Madhavam Heights | Sky Line Infra Vision | 77 | 0% | 6 Aug 2024 |
| SHIVA SHRI APARTMENT | Jog Mahajan Infra Privet Limited | 72 | 62% | 19 Jan 2023 |
| Lucky Orange City | Iqbal Haroon Kasmani | 69 | 0% | 24 Dec 2019 |
| CASA Grand | Paras Buildcom | 68 | 16% | 27 Jun 2023 |
| Radha City | Rahul sharma And Yogesh Gawande | 66 | 0% | 12 Mar 2020 |
| Harmony Prathamesh | Radha Shrihari Builders And Developers LLP | 66 | 11% | 9 Aug 2024 |
| SAMRA ONE | SAMRA LUXURY PRIVATE LIMITED | 65 | 0% | 30 Dec 2025 |
| SHIVRAY COMMERCIAL | SHIVRAY BUILDER | 58 | 21% | 15 Feb 2024 |
| Green Heights | Aksha Builder and Developers | 56 | 4% | 1 Jul 2020 |
| MY ORCHID HEIGHTS PHASE I | Nitin Bhatkar | 56 | 20% | 31 May 2024 |
| LIFESTYLE HOMES | LIFESTYLE HOME SPACES | 55 | 20% | 25 Jan 2024 |
| AMBER PRIDE | ABHIMANYU SANJAY RATHI | 52 | 0% | 8 Oct 2024 |
| Aakar Regency | ROHIT ASHOKRAO JIWARKAR | 51 | 16% | 21 Jan 2025 |
| UDAY NAGAR LAYOUT D | DEVENDRA RAMACHANDRA CHANDAK | 50 | 0% | 2 Nov 2017 |
| DATTA NAGARI 2 | Vijay Nanakram Talda | 50 | 0% | 23 Oct 2023 |
| SUMERU VEDANTA 2 | MARIGOLD REALITY | 49 | 82% | 13 Sep 2021 |
| UDAY NAGAR LAYOUT A | UMESH RAMCHANDRA CHANDAK | 48 | 0% | 2 Nov 2017 |
| MOUJE BADNERA SURVEY NO. 13/2 A AND B | SUBHASH NANAKRAM TALDA | 48 | 2% | 23 May 2018 |
| DATTA DHAM | MITRANGAN BUILDER & DEVELOPERS | 48 | 0% | 6 Jan 2020 |
| VARMA HEIGHTS | DILIP NANDKISHOR VARMA | 46 | 0% | 28 Feb 2025 |
| ROYAL TOWER | ANIL LAXMICHAND BOTHRA | 44 | 0% | 22 Sep 2023 |
| MIDAS HEIGHTS | VASAVI VENTURE | 43 | 0% | 15 Oct 2021 |
| Dwarka City | Praful Shingote and 1 Other | 43 | 40% | 4 Aug 2022 |
| Vedanta Heights | Vedanta Buildcon | 42 | 48% | 22 Sep 2023 |
| AMRAVATI COMPLEX | RANJANA SUNIL ZOMBADE | 41 | 56% | 17 Oct 2023 |
| Raghuvir Icon | Dilip Mangalbhai Popat | 40 | 0% | 10 Jun 2026 |
| VIJAY FORTUNE | VIJAY PARANJAPE ESTATE LLP | 37 | 0% | 11 Feb 2026 |
| Shree Shiv Gajanan Residency | D.S Ganorkar and Company | 36 | 31% | 29 Sep 2025 |
| OMKAR GALAXY | Dinesh Ramraoji Dolare | 36 | 0% | 2 Mar 2026 |
| ISHWARY COLONY | SAI SRUJAN BUILDERS & DEVELOPERS | 35 | 0% | 23 Jan 2018 |
| NAVODAYA | Chirag Vinod Jajoo | 35 | 0% | 13 Aug 2025 |
| SOLARIS CUBE | SOLARIS INFRA | 35 | 0% | 11 Sep 2025 |
| Crystal Plaza | LAXMIKANT PRABHAKAR JOSHI | 33 | 3% | 24 Sep 2025 |
| AFFORDABLE HOUSING PROJECT MOUJA RAHATGAON S NO 116/2 PLOT NUMBER 24 TO 28 | PMAY AMRAVATI MUNICIPAL CORPORATION | 32 | 0% | 23 Oct 2021 |
| RUKHMINI HEIGHTS | SADANI AND PATURDE BUILDERS LLP | 32 | 3% | 3 Jan 2024 |
| SANJONI HEIGHTS | ADITYA ENGINEERS AND CONTRACTORS | 32 | 44% | 1 Jul 2025 |
| Vidhi Heights | Vidhi Developers | 32 | 22% | 1 Aug 2025 |
| Decent Shraddha Residency | Jayant Parmanand Chhutlani | 32 | 0% | 10 Dec 2025 |
| GOVINDA GARDEN CITY | SUBHASH NANAKRAM TALDA | 30 | 0% | 16 May 2019 |
| DCH CASTLE | BLUSERA INFRASTRUCTURE | 30 | 47% | 19 Jul 2023 |
| Shree Gajanan Residency | Saurabh Construction and Developers | 30 | 3% | 19 Sep 2025 |
| Amarsukh Tower | Rajeshkumar Amarlal Talreja | 29 | 0% | 17 Jan 2023 |
| Midas Enclave | Vasavi Lifespaces Private Limited | 29 | 38% | 28 Jun 2024 |
| UDAY PARK - LAYOUT C | SAROJ UMESH CHANDAK | 28 | 0% | 7 Nov 2017 |
| SHREE GAJANAN ENCLAVE | AJAY NAMDEORAO DAMBALE | 28 | 0% | 29 May 2024 |
| Shree Dwarka Residency | Mangesh Shyamrao Gulhane | 28 | 0% | 5 Mar 2026 |
| Krushnayan Villas | Sanchit Pradip Patil | 27 | 41% | 20 May 2025 |
| GOVINDA SMART CITY | SANJAY SHANKARLAL BATRA | 26 | 0% | 24 Apr 2018 |
| Nimisha - 2 | Aditya Anagha Multi State Credit Co-Operative Society Limited | 26 | 23% | 28 Jan 2025 |
| Aarambh Pride | Aarambh Infracon LLp | 25 | 24% | 3 Feb 2025 |
| SHRI RHIDESH | ANANT KESHAORAO SAURKAR | 24 | 0% | 2 Jun 2025 |
| NITYA:SHRI APARTMENT | Jog Mahajan Infra Private Limited | 24 | 0% | 3 Dec 2025 |
| VIJAY PRIVILEGE | VIJAY PARANJAPE ESTATE LLP | 24 | 0% | 22 Apr 2026 |
| VEERA PRIME | VEERA BUILDERS | 24 | 0% | 29 Jun 2026 |
| Galaxy Tower | Sky Line Builders And Developers | 23 | 26% | 6 Jan 2023 |
| SANKALP PEARL | SANKALP PROPERTIES | 21 | 100% | 20 Jan 2025 |
| INDRAKSHI RESIDENCY | PRAVIN SAHEBRAO MAHALLE | 20 | 40% | 7 Jul 2023 |
| AAI RESIDENCY II | SAMIR HARIBHAU PANDE | 20 | 0% | 2 Apr 2024 |
| Krushnayan Prime | Rayaji Realty | 20 | 75% | 14 Mar 2024 |
| Shri Krushna Residency | RAVINDRA PUNDLIKRAO MAHALLE | 20 | 35% | 16 Jul 2024 |
| Advik Nest | Tathey Realty | 20 | 10% | 10 Jun 2025 |
| MAHALAKSHMI APARTMENT | Megha Sachin Wankhade | 20 | 0% | 9 Mar 2026 |
| Chanakya Heights | Ashok Satyanrayan Joshi | 18 | 11% | 6 Mar 2023 |
| SAI AARYAN | HAJARE BUILDERS | 17 | 12% | 12 Jan 2023 |
| GALAXY TOWER | FIROZKHAN MUSAKHAN | 16 | 0% | 8 Dec 2022 |
| UDAY NAGAR -LAYOUT B | POONAM DEVENDRA CHANDAK | 15 | 0% | 20 Nov 2017 |
| RATNA MAULI | RATNA MAULI CONSTRUCTIONS | 14 | 0% | 4 Mar 2024 |
| Gajanan Tower | KAMAL DIGRILAL MALVIYA | 14 | 0% | 3 Jul 2024 |
| Dwarkadhish Residency | Ashish Mohanrao Jirapure | 12 | 17% | 26 Aug 2022 |
| G B DESIRE | G B CONSTRUCTION | 12 | 0% | 12 Dec 2022 |
| SHALINI RESIDENCY | VIJAYSHALI ENTERPRISES PRIVATYE LIMITED | 12 | 100% | 24 Feb 2023 |
| Ganraya Heights | A B Associates | 11 | 9% | 27 Jun 2023 |
| Chandak Tower | Chandak Construction | 9 | 0% | 1 Jun 2023 |
| GOVINDA CITY - 1 | SHANKARLAL WADHUMAL BATRA | 4 | 0% | 30 Nov 2017 |
| GOVIND PRIYA | KIRIT JAYANTILAL KOTAK | 1 | 0% | 28 Dec 2018 |
| VISTA IMPERIA | DEEPRAJAM INFRASPACE LLP | 1 | 0% | 15 May 2023 |
| GOVINDA SKY | Vijay Nanakram Talda | - | - | 18 Jul 2017 |
| Naman Vihar | NAMAN VENTURES PRIVATE LIMITED | - | - | 4 Aug 2017 |
| SILVER OAK PLAZA | SAFFRON DEVELOPERS | - | - | 31 Jul 2017 |
| SHREE SHARDUL NEST | SHARDUL ASSOCIATES | - | - | 18 Aug 2017 |
| GREEN PARK | RAASHI BUILDERS AND DEVELOPERS LLP | - | - | 31 Aug 2017 |
| RASHI TRINITY | RAASHI ASSOCIATES | - | - | 17 Aug 2017 |
| SHREE GURU PUSHP AMRUT PARIWAR | Sudhir Rameshrao Wakode | - | - | 23 Aug 2017 |
| JANKI RESIDENCY | AMIT VINOD SAHU | - | - | 19 Aug 2017 |
| JOG CHARITABLE MEDICAL RELIF FUND HOSPITAL AND RACHANASHRI COMMERCIALS | M/S RACHANA BUILDERS AND DEVELOPERS | - | - | 9 Aug 2017 |
| PURVA RESIDENCY CONDOMINIUM | NAKSHATRA BUILDERS & DEVELOPERS | - | - | 19 Aug 2017 |
| UTTARA RESIDENCY CONDOMINIUM | NAKSHATRA BUILDERS & DEVELOPERS | - | - | 14 Aug 2017 |
| VIMACO RESIDENCY II | ABBASALI AHTESHAM HUSAIN HAJI | - | - | 9 Aug 2017 |
| SHIVAJI ENCLAVE - 2 | SUBHASH DEVIDAS BHARSAKALE | - | - | 18 Aug 2017 |
| THE EMPIRE MALL | SOL POWER PRIVATE LIMITED | - | - | 24 Aug 2017 |
| SAI HEIGHTS | SAI HEIGHTS | - | - | 31 Jul 2017 |
| CHIRAG CITY | CHIRAG CONSTRUCTIONS | - | - | 23 Aug 2017 |
| The Best Residency | Pawan Kisanrao Shende | - | - | 18 Aug 2017 |
| SHREE APPARTMENT | SHARDUL ASSOCIATES | - | - | 28 Mar 2018 |
| RAJ TOWNSHIP | RAJ ASSOCIATES | - | - | 31 Aug 2017 |
| Sai Heritage | Sai Datta Developers | - | - | 31 Jul 2017 |
| PRATIK TOWER | KAMAL DIGRILAL MALVIYA | - | - | 6 Aug 2017 |
| MANAV MANDIR | TARUN CONSTRUCTION COMPANY | - | - | 17 Aug 2017 |
| VARDVINAYAK RESIDENCY | RAVI PANJABRAO GHURDE | - | - | 6 Aug 2017 |
| SAI SHRADDHA RESIDENCY | SANCHIT BUILDERS AND INFRASTRUCTURE DEVELOPERS | - | - | 31 Aug 2017 |
| DEVI HEAVEN | DEVI INFRASPACE PRIVATE LIMITED | - | - | 1 Aug 2017 |
| EKDANT RESIDENCY | R.S. CONSTRUCTION | - | - | 23 Aug 2017 |
| SAI CITY | SSB ASSOCIATES | - | - | 6 Aug 2017 |
| SAI VIDHI | SSB ASSOCIATES | - | - | 4 Aug 2017 |
| ICON DREAMS | ICON BUILDERS | - | - | 14 Sep 2017 |
| NeetaShree Residency | Rohan Shrikrishna Chimote | - | - | 4 Aug 2017 |
| RANTHAMBORE CITY PHASE I | RANTHAMBORE CITY | - | - | 4 Aug 2017 |
| VITTHALARPAN RESIDENCY-B | DHANRAJ HARICHAND KHANDELWAL | - | - | 7 Aug 2017 |
| ADARSH RESIDENCY | JITENDRA KESHWANI | - | - | 9 Aug 2017 |
| DREAMZ PARK WING A | DREAMZ INFRASPACE | - | - | 17 Aug 2017 |
| DREAMZ PARK WING B | DREAMZ INFRASPACE | - | - | 11 Aug 2017 |
| VIMACO GULMOHAR CONDOMINIUM | ABBASALI AHTESHAM HUSAIN HAJI | - | - | 14 Aug 2017 |
| Shri Govinda Imperial | SHREE GOVINDA CONSTRUCTIONS | - | - | 4 Aug 2017 |
| Daga Sapphire Infinity | Daga Infratech Pvt Ltd | - | - | 17 Aug 2017 |
| Dreamzland Business Park Phase I | M/S DREAMZ INFRASTRUCTURE | - | - | 9 Aug 2017 |
| Dreamzland Business Park Phase II | M/S DREAMZ INFRASTRUCTURE | - | - | 9 Aug 2017 |
| THE VIDARBHA PREMIER AMBANAGRI KIRAN NAGAR AMRAVTI | PRAKASH NARAYANRAO RAOLE | - | - | 4 Oct 2017 |
| VYANKATESH DEV RESIDENCY | SHRI VYAANKATES ASSOCIATES | - | - | 31 Aug 2017 |
| SHRI KRISHNA VIHAR | SHAILESH INFRASTRUCTURE PRIVATE LIMITED | - | - | 7 Aug 2017 |
| Dreamzland Business Park PHASE III | M/S DREAMZ INFRASTRUCTURE | - | - | 9 Aug 2017 |
| VENUS HEIGHT | M/S S.NAVIN BUILDERS | - | - | 19 Aug 2017 |
| Dreamaland Business Park Phase No IV | M/S DREAMZ INFRASTRUCTURE | - | - | 8 Aug 2017 |
| Dreamz Landmark | M/S DREAMZ INFRASTRUCTURE | - | - | 10 Aug 2017 |
| PLOT NO 802 | CITY LAND ASSOCIATES | - | - | 14 Aug 2017 |
| PLOT NO 804 | CITY LAND ASSOCIATES | - | - | 7 Aug 2017 |
| Aryavan Hills | Someshwar Vitthalrao Pusatkar | - | - | 18 Aug 2017 |
| SANKALP HEIGHT | SANKALP INFRATECH | - | - | 6 Aug 2017 |
| SHRINIWASA 63 COMPLEX | SHRINIWASA CONSTRUCTION | - | - | 4 Sep 2017 |
| WARDHEKAR COMPLEX | SINDH ASSSOCIATE | - | - | 14 Aug 2017 |
| PLOT NO 805 | CITY LAND ASSOCIATES | - | - | 9 Aug 2017 |
| Shri Radha Krishna Residency | Padm Builders | - | - | 22 Aug 2017 |
| SHIVANAND HEIGHTS | SHIVANAND INFRASTRUCTURE | - | - | 14 Aug 2017 |
| SHREE SAI MEHER ENCLAVE | OM SAI BUILDERS AND DEVELOPERS | - | - | 11 Aug 2017 |
| SHRI SAIKRUPA RESIDENCY | SAVITA PRALHAD AGARKAR | - | - | 11 Aug 2017 |
| Shri Pinglai Heights | Unnati Infraspace Private Limited | - | - | 6 Sep 2017 |
| JAI BHOLE APARTMENT | MOHIT ASSOCIATES | - | - | 17 Aug 2017 |
| SHRI GAJANAN TOWER | TEJAS ASSOCIATES | - | - | 5 Aug 2017 |
| SUMERU MANGALAM | NARENDRA PRATAPRAI KINGRANI | - | - | 24 Aug 2017 |
| KAUSHIK HEIGHTS | ARUN CONSTRUCTION COMPANY | - | - | 22 Aug 2017 |
| MANSAVALI RESIDENCY | MANSAVALI BUILDERS & DEVELOPERS | - | - | 10 Nov 2017 |
| ORANGE COUNTY | DNYANESHWAR NAMDEVRAO WANKHADE | - | - | 31 Aug 2017 |
| MAHALAXMI APARTMENT-VII | P S ASSOCIATES | - | - | 22 Aug 2017 |
| BHUMI LAND | BHUMI LANDS | - | - | 14 Aug 2017 |
| SHREE GANESH RESIDENCY | RAVINDRA PUNDLIKRAO MAHALLE | - | - | 19 Aug 2017 |
| SANKALP HEIGHTS | SANKALP BUILDERS & DEVELOPERS | - | - | 31 Aug 2017 |
| HARIGANGA HEIGHTS | KALASH LANDMARKS | - | - | 31 Aug 2017 |
| ASHWAMEDH RESIDENCY | ASHWAMEDH BUILDERS AND DEVELOPERS | - | - | 22 Aug 2017 |
| SALASAR ICON A | Deoganga Builders And Developers | - | - | 31 Aug 2017 |
| AMBER HEIGHTS | AMBER BUILDERS AND DEVELOPERS | - | - | 31 Aug 2017 |
| SHIVAJI SANKUL4 | SUBHASH DEVIDAS BHARSAKALE | - | - | 31 Aug 2017 |
| RAGHAV FLORENCE | RAGHAV BUILDERS AND DEVELOPERS | - | - | 7 Nov 2017 |
| SHIVAJI SANKUL 5 | SUBHASH DEVIDAS BHARSAKALE | - | - | 31 Aug 2017 |
| GOVIND NIILYAM | SHRI GOVIND BUILDCON | - | - | 4 Oct 2017 |
| CITY CENTRE MALL | TIRUPATI ASSOCIATES | - | - | 7 Sep 2017 |
| Shree Sai Shraddha Apartment | Rajubhau Shankarrao Ingole | - | - | 4 Sep 2017 |
| SHREE JAI RESIDENCY | SHREE KRUPA BUILDERS | - | - | 21 Sep 2017 |
| Rachayati Enclave | Rachayati Realtors and Developers pvt ltd | - | - | 13 Oct 2017 |
| HARISHCHANDRA RESIDENCY | PRATAP NARAYAN DESHMUKH | - | - | 14 Sep 2017 |
| SAI SAGAR ENCLAVE V | SAGAR PANDHARINATH BANKAR | - | - | 14 Sep 2017 |
| YASHASVI-3 | MAHARUDRA INFRACOMBINES PRIVATE LIMITED | - | - | 25 Oct 2017 |
| RADHE RESIDENCY | RADHE BUILDERS | - | - | 9 Oct 2017 |
| SHREE GURUDEV RESIDENCY | NITIN SAHEBRAO UMAP | - | - | 9 Oct 2017 |
| Block D -Ramlaxman Sankul | Bajaj Construction | - | - | 25 Apr 2018 |
| DREAMZ SIGNATURE | DREAMZ INFRASPACE | - | - | 25 Oct 2017 |
| SATPUDA CAVES | SUMIT SUBHASHRAO TANGADE | - | - | 9 Nov 2017 |
| SHREE NIRMAL DHAM | SAURKAR CONSTRUCTION | - | - | 7 Nov 2017 |
| ATHARVA RESIDENCY | MAHENDRA BALIRAM BHOJANE | - | - | 9 Nov 2017 |
| MANOHAR TOWER - I | SACHIN MANOHAR SANAP | - | - | 20 Nov 2017 |
| GREEN SQUARE | UJJWALA SATISH HAWARE | - | - | 29 Nov 2017 |
| GANPATI HEIGHT | RUPESH TANBAJI TADAS | - | - | 12 Dec 2017 |
| MAI RESIDENCY | RUPESH GAJANAN BURGHATE | - | - | 11 Apr 2018 |
| RAGHUKUNJ | SHRI GAJANAN CONSTRUCTION | - | - | 9 Jan 2018 |
| PLOT NO 803 | CITY LAND ASSOCIATES | - | - | 20 Nov 2017 |
| Sonaji Enterprise | SONAJI ENTERPRISES | - | - | 22 Jan 2018 |
| DATERAO RESIDENCY | ASHA BUILDERS AND DEVELOPERS | - | - | 20 Dec 2017 |
| GARDEN CITY | GARDEN CITY | - | - | 29 Nov 2017 |
| MAHALAXMI EMPIRE | SHREE GAJANAN ASSOCIATES | - | - | 2 Jan 2018 |
| MAZA GHAR | JEEVAN KRUSHNARAO ZANZAT | - | - | 15 Dec 2017 |
| Durga Residency | Ashok Satyanarayan Joshi | - | - | 15 Dec 2017 |
| JAI AMBA APARTMENT 15 | NILESH PRAKASHRAO THAKARE | - | - | 26 Dec 2017 |
| green vally | LAXMIKANT PRABHAKAR JOSHI | - | - | 20 Dec 2017 |
| DEVIS PLATINUM | DEVI INFRASPACE PRIVATE LIMITED | - | - | 15 Feb 2018 |
| LAXMI RESIDENCY SATURNA | ANIL LAXMICHAND BOTHRA | - | - | 9 Jan 2018 |
| Rich County Apartment | Nirmiti Construction | - | - | 22 Mar 2018 |
| BUSYLAND HEIGHTS | BUSYLAND HEIGHTS | - | - | 22 Jun 2018 |
| VIDYA RESIDENCY | M/S SUNSHINE INFRATECH, AMRAVATI | - | - | 22 Jan 2018 |
| Construction of 674 EWS T/s 409 MIG T/s 104 HIG T/s under PMAY at Akoli Amravati / EWS and MIG | Amravati Housing And Area Development Board Amravati | - | - | 31 Jan 2018 |
| SWAPN SAKAR APPARTMENT | MAA AMBE CONSTRUCTION | - | - | 8 Feb 2018 |
| ORBIT CONSTRUCTION | AKSHAY ANIL JAIN | - | - | 2 Feb 2018 |
| GOVIND KRUPA | M/S C & D ENGINEER'S & DEVELOPERS | - | - | 15 Feb 2018 |
| SARVADNYA RESIDENCY | M/S C & D ENGINEER'S & DEVELOPERS | - | - | 20 Feb 2018 |
| MAULI APARTMENT | PUSHPA DHANRAJ KHANDELWAL | - | - | 15 Feb 2018 |
| YASHODHAN APARTMENT | SAMEER RAMRAOJI BODKHE | - | - | 8 Mar 2018 |
| SHREE AMBA BUSINESS PARK WING A | SHREE AMBA BUSINESS PARK | - | - | 22 Mar 2018 |
| HORIZON HEIGHTS | HORIZON CREATORS | - | - | 15 Mar 2018 |
| Rajsuya Enclave | Shri Dharmaraj Builders Private Limited | - | - | 3 May 2018 |
| Madhurajani Residency | Nitin Bhatkar | - | - | 9 Apr 2018 |
| AYUR MALL | K. K. INFRASTRUCTURE | - | - | 12 Apr 2018 |
| Saidatta Developers Project Saidham | Sai Datta Developers | - | - | 16 Apr 2018 |
| PUSHP SHRI APARTMENT | YASH SHRI ENGINEERS AND CONTRACTORS | - | - | 3 May 2018 |
| SHRI VARADVINAYAK RESIDENCY | SAGAR PRAKASHRAO BUTE | - | - | 24 Apr 2018 |
| Decent Sargam | JAYANT PARMANAND CHHUTLANI | - | - | 20 Apr 2018 |
| AVANI HERITAGE | RAVI PANJABRAO GHURDE | - | - | 23 Apr 2018 |
| KALASH RESIDENCY | CHINTAMANI HOMES | - | - | 8 May 2018 |
| USHA RESIDENCY | MAHAKALI BUILDERS AND LAND DEVELOPERS | - | - | 5 Jun 2018 |
| HARIGANGA ELITE | KISHOR GHISULALJI GOENKA | - | - | 5 Jun 2018 |
| SUMERU VEDANTA | MARIGOLD REALITY | - | - | 12 Jun 2018 |
| SHREE AMBA BUSINESS PARK WING B PHASE I | SHREE AMBA BUSINESS PARK | - | - | 20 Jun 2018 |
| SAI SAGAR ENCLAVE VI | SAGAR PANDHARINATH BANKAR | - | - | 20 Jun 2018 |
| Vrundawan by Govinda Group | Vijay Nanakram Talda | - | - | 22 Jun 2018 |
| VARAD ENCLAVE | SUMANGAL ASSOCIATES | - | - | 23 Jul 2018 |
| SALASAR RESIDENCY | DEOGANGA BUILDERS | - | - | 23 Aug 2018 |
| SILVER WOOD RESIDENCY | Sukhaadi Infrastructure | - | - | 11 Sep 2018 |
| BHUMI ENCLAVE | BHUMI BUILDERS AND DEVELOPERS | - | - | 23 Aug 2018 |
| VIJAY PLAZA - A | SIDDHIVINAYAK DEVELOPERS | - | - | 27 Sep 2018 |
| VIJAY PLAZA - B | SIDDHIVINAYAK DEVELOPERS | - | - | 24 Sep 2018 |
| VIJAY PLAZA - C | AMIT ARVIND DESHMUKH | - | - | 17 Sep 2018 |
| Samruddhi Heights | Samrudhi Housing and Infrastructures | - | - | 10 Oct 2018 |
| Devisha Pearl | Darshan Shrikisan Kalantri | - | - | 10 Oct 2018 |
| SILVER CREST | SAFFRON DEVELOPERS | - | - | 26 Oct 2018 |
| ADIL - 1 | ADIL CONSTRUCTION | - | - | 12 Nov 2018 |
| Nanda HiLife | Nanda Properties | - | - | 5 Nov 2018 |
| ARJUN EMPIRE MEERA | SHANKAR ARJUNDAS BHATEJA | - | - | 28 Dec 2018 |
| BHAGIRATHI TOWER | ADITYA RATHI | - | - | 5 Dec 2018 |
| USHA RESIDENCY | SHRUSHTI BUILDERS & DEVELOPERS | - | - | 10 Dec 2018 |
| mauli plaza | MAULI ASSOCIATES | - | - | 17 Dec 2018 |
| Tapadiya City Center | Landmark Tapadia LLP | - | - | 9 Jan 2019 |
| SHREE AMBA BUSINESS PARK WING B PHASE II | SHREE AMBA BUSINESS PARK | - | - | 28 Dec 2018 |
| Gajanan Heights | KAMAL DIGRILAL MALVIYA | - | - | 28 Dec 2018 |
| SANKALP HERITAGE | SANKALP BUILDERS AND DEVELOPERS | - | - | 4 Jan 2019 |
| Swpnashri Apartment | Shriram Mahadevrao Nagpurkar | - | - | 28 Dec 2018 |
| Decent Sanskruti | JAYANT PARMANAND CHHUTLANI | - | - | 15 Jan 2019 |
| Kasturi Heights | GAJANAN VASUDEO PATIL | - | - | 14 Jan 2019 |
| PANCHRATNA | GANGA BUILDERS AND DEVELOPERS | - | - | 22 Feb 2019 |
| YASHWANT RESIDENCY | AGARKAR BUILDER AND DEVELOPERS | - | - | 23 Jan 2019 |
| SHREEKRUPA TOWNSHIP | MEERADEVI CHHUGARAM KHATRI | - | - | 29 Jan 2019 |
| ANANDI DREAMS | ANANDI INFRASTRUCTURE (INDIA) PRIVATE LIMITED | - | - | 15 Mar 2019 |
| RAI AASHIYANA. | RAI UDYOG LIMITED | - | - | 5 Mar 2019 |
| RAGHAV RESIDENCY | PRAMOD BALKISANJI DAMMANI | - | - | 26 Mar 2019 |
| SAHYADRI RESIDENCY | SAHYADRI ASSOCIATES | - | - | 29 Mar 2019 |
| Govind Tower | Suresh Govindramji Malviya | - | - | 29 Mar 2019 |
| RIDDHI SIDDHI APARTMENT | RIDDHI SIDDHI BUILDERS | - | - | 5 Apr 2019 |
| Dreamz Pride | Dreamz Infravision | - | - | 26 Apr 2019 |
| Maharshi Apartment | DHANRAJ HARICHAND KHANDELWAL | - | - | 23 May 2019 |
| TULSI PEARL | NITESH SHYAM BUNDELE | - | - | 31 May 2019 |
| AMBER PARK | AMBER BUILDERS AND DEVELOPERS | - | - | 2 Mar 2020 |
| AMBER HERITAGE | AMBER BUILDERS AND DEVELOPERS | - | - | 21 Jun 2019 |
| CRYSTAL PLAZA | AMIT CONSTRUCTION | - | - | 14 Jun 2019 |
| VINAYAK APARTMENT | DINESH RAMRAO DOLARE | - | - | 9 Sep 2019 |
| SILVER PARK | TEJAS ASSOCIATES | - | - | 5 Aug 2019 |
| RAJ TOWNSHIP | RAJ ASSOCIATES | - | - | 5 Sep 2019 |
| SHIV RESIDENCY | RAVINDRA PUNDLIKRAO MAHALLE | - | - | 8 Jul 2019 |
| TIMES SQUARE | SHYAM SADHURAM CHHUTLANI | - | - | 25 Aug 2019 |
| GARDEN CITY - GULMOHAR | GARDEN CITY | - | - | 29 Jul 2019 |
| 104 HIG tenaments on S.N. 47,57,58 at Mouje Akoli, Amravati | Amravati Housing And Area Development Board Amravati | - | - | 7 Jan 2020 |
| MADHUSUMAN RESIDENCY | ADITYA SHREE BUILDERS & DEVELOPERS | - | - | 9 Sep 2019 |
| SUMERU SHANKARA | NARENDRA PRATAPRAI KINGRANI | - | - | 28 Aug 2019 |
| DAGA PLAZZO | KAMLESH LAXMINARAYAN DAGA | - | - | 29 Nov 2019 |
| MANIK ENCLAVE | SACHIN KISANLAL GUPTA | - | - | 30 Oct 2019 |
| Gautam Nagar Phase 1 Building Nos. 6 and 7 | J K Investors (Bombay) Limited | - | - | 12 Oct 2019 |
| AJIT HEIGHTS | RUPESH TANBAJI TADAS | - | - | 18 Dec 2019 |
| SAI PEARL | HAJARE BUILDERS | - | - | 9 Jul 2020 |
| VRUNDAWAN PRIME | Vijay Nanakram Talda | - | - | 30 Oct 2019 |
| SHREE YOGIRAJ APARTMENT | RAJESH SUKHADEORAO RAUT | - | - | 30 Oct 2019 |
| SKY Gardens | V & M BUILDERS & DEVELOPERS | - | - | 2 Dec 2019 |
| AFFORDABLE HOUSING PROJECT 860 EWS IN MHASLA 21/F | VIJAYKUMAR EKANATH KHORATE | - | - | 29 Nov 2019 |
| SHRINIWAS | SAURKAR CONSTRUCTION | - | - | 5 Dec 2019 |
| SATYA SANKUL | SATYA BUILDER & DEVLOPERS | - | - | 14 Jan 2020 |
| SHREE AMBA BUSINESS PARK WING C | SHREE AMBA BUSINESS PARK | - | - | 18 Dec 2019 |
| MAHALAXMI PLAZA | P. S. ASSOCIATES | - | - | 19 Dec 2019 |
| SAHYADRI ENCLAVE | PAVAN KISANRAO SHENDE | - | - | 2 Jan 2020 |
| PARAG COMPLEX PHASE 1 | MALOO CONSTRUCTION | - | - | 2 Jan 2020 |
| SHREE GURU ANAND DHAM PHASE 2 | YOGIRAJ BUILDERS | - | - | 30 Jan 2020 |
| KESHAV EMPIRE PHASE I | SACHIN KESHAORAO INGOLE | - | - | 24 Feb 2020 |
| ORCHID HOMES | LAXMIKANT PRABHAKAR JOSHI | - | - | 18 Feb 2020 |
| JAIEE JUIEE JASWAND | GARDEN CITY | - | - | 26 Feb 2020 |
| GARDEN CITY-CHAFA KAMAL | GARDEN CITY | - | - | 26 Feb 2020 |
| SHRI SAI RAGHAV ENCLAVE | SHRI RAM BUILDER | - | - | 27 Mar 2020 |
| CROWN | Vijay Nanakram Talda | - | - | 31 Mar 2020 |
| SHRI SAI RAGHUNANDAN ENCLAVE | SHRI YOGIRAJ BUILDERS | - | - | 19 Mar 2020 |
| YASHASVI-5 | MAHARUDRA INFRACOMBINES PRIVATE LIMITED | - | - | 2 Aug 2020 |
| Bluebells Arcade | Mayank Ramesh Dundale | - | - | 8 Jun 2020 |
| IMPERIAL COMPLEX | Vipul Uttam Jadhao | - | - | 24 Sep 2020 |
| SADANAND HEIGHTS | SANGEETA ANILKUMAR KHATRI | - | - | 9 Jul 2020 |
| SKY TOWER | HEDA CONSTRUCTIONS AOP | - | - | 7 Aug 2020 |
| MAHAKAL RESIDENCY | SATISH JAWAHARLAL KANOJIA | - | - | 2 Sep 2020 |
| Atharva Complex | Atul Uttamrao Yadgire | - | - | 15 Aug 2020 |
| mahalaxmi apartment 8 | P. S. ASSOCIATES | - | - | 29 Aug 2020 |
| Sai Raj Heights | Bhavesh Khushal Patel | - | - | 22 Oct 2020 |
| Shree Heritage | Shyam Prabhakarrao Kedare | - | - | 3 Nov 2020 |
| GOVIND VILLA | ANSHUMAN BUILDERS | - | - | 28 Oct 2020 |
| Govind Complex | SUNITA SURESH MALVIYA | - | - | 13 Nov 2020 |
| GOVINDAM | Vijay Nanakram Talda | - | - | 25 Dec 2020 |
| Rahul Apartment | SHREE RUKMINI ASSOCIATES | - | - | 20 Dec 2020 |
| AFFORDABLE HOUSING PROJECT 860 EWS IN NIMBHORA 55/2A | Suresh Bansiji Patil | - | - | 10 Jan 2021 |
| AFFORDABLE HOUSING PROJECT 860 EWS IN MHASALA - 22PART | Suresh Bansiji Patil | - | - | 10 Jan 2021 |
| CITY CENTER ZANWAR SHOPPING MALL | SSB CONSTRUCTION | - | - | 4 Feb 2021 |
| MATO SHRI APARTMENT | YASH SHRI ENGINEERS AND CONTRACTORS | - | - | 10 Feb 2021 |
| Rachayati Crown | Rachayati Realtors and Developers pvt ltd | - | - | 5 Apr 2021 |
| JAEE RESIDENCY | MANISHA ANANTKUMAR LINGOT | - | - | 8 Mar 2021 |
| VANDAN PARK | VANDAN INFRA PROJECTS PRIVATE LIMITED | - | - | 10 Mar 2021 |
| Avinashe Avenue | Avinashe Builders And Developers | - | - | 30 Mar 2021 |
| The Primus | Mahesh Chandrabhan Kingrani | - | - | 5 Oct 2021 |
| MAULI COMPLEX | MAULI ASSOCIATES | - | - | 25 Mar 2021 |
| GAJANAN PLAZA | P. S. ASSOCIATES | - | - | 5 Apr 2021 |
| OMKARSHRI | YASHSHRI ENGINEERS AND CONTRACTORS | - | - | 10 May 2021 |
| GEET PARADISE | GEET KAMALKUMAR MALVIYA | - | - | 23 Apr 2021 |
| Advik One | Tathey Realty | - | - | 29 Apr 2021 |
| KRUSHNAKUNJ RESIDENCY | POOJA BUILDERS AND DEVELOPERS | - | - | 18 May 2021 |
| DECENT SUKHKARTA | JAYANT PARMANAND CHHUTLANI | - | - | 10 May 2021 |
| Srushti Heights | Srushti Builders And Land Developers | - | - | 18 May 2021 |
| SANKALP HEAVEN | SANKALP BUILDERS DEVELOPERS | - | - | 10 May 2021 |
| Aditya Enclave | Piyush Nibjiya | - | - | 18 May 2021 |
| SHRI BALLALESHWAR RESIDENCY | SAGAR PRAKASHRAO BUTE | - | - | 4 Jun 2021 |
| PUSHPANJALI ENCLAVE | Shri Ashtavinayaka Developers & Builders | - | - | 4 Jun 2021 |
| GKP TOWER | PRATIBHA KAMALKUMAR MALVIYA | - | - | 14 Jun 2021 |
| Mandar Enclave | MANDAR INFRASTRUCTURE | - | - | 26 Jun 2021 |
| POPULAR TRADE CENTER | POPULAR BUILDERS AND DEVELOPERS | - | - | 26 Jun 2021 |
| SMAHI HEIGHT | ADITYA ENGINEERS AND DEVELOPERS | - | - | 29 Jun 2021 |
| NANDISH OBERON | M/S NANDISH DEVELOPERS | - | - | 26 Jul 2021 |
| PURVIKA RESIDENCY | KEDIA BUILDERS AND DEVELOPERS | - | - | 14 Mar 2022 |
| ORCHID HEIGHTS | Nitin Bhatkar | - | - | 31 Jul 2021 |
| MAULI KRUPA APARTMENT | MAULI INDUSTRIES | - | - | 31 Jul 2021 |
| CREATIVE HEIGHTS | CREATIVE ASSOCIATES | - | - | 25 Oct 2021 |
| SILVER STAR | PRAVEEN VASANTRAO CHARJAN | - | - | 23 Oct 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA NAVSARI S NO 129/2A PLOT NO 91 TO 97 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 23 Oct 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA NAVSARI S NO 129/2A PLOT NO 107 TO 113 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 8 Sep 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA RAHATGAON S NO 199/3A PLOT NO 59 TO 65 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 23 Oct 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 23 Oct 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA BADNERA S NO 194 PLOT NUMBER 36 TO 41 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 13 Sep 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA BENODA PLOT NUMBER 42 TO 54 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 23 Oct 2021 |
| AFFORDABLE HOUSING PROJECT MOUJA BENODA S NO 26 PLOT NUMBER 132 TO 138 | PMAY AMRAVATI MUNICIPAL CORPORATION | - | - | 23 Oct 2021 |
| NANDADEEP APARTMENT | SAHIL ASSOCIATES | - | - | 20 Sep 2021 |
| RACHANA SRUSHTI | SRUSHTI INFRA | - | - | 11 Oct 2021 |
| Vivanta Business Park | Sanjay Premchand Harwani | - | - | 1 Oct 2021 |
| RIDDHI SIDDHI APARTMENT | DINESH RAMRAO DOLARE | - | - | 23 Oct 2021 |
| Sagar Enclave | Sagar Enclave | - | - | 15 Dec 2021 |
| Indrayani Pride | Govind Shridhar Tatte | - | - | 3 Dec 2021 |
| SAIKRUPA | Saidutta Developers | - | - | 14 Dec 2021 |
| SHRI SAI GAJANAN ENCLAVE | SHREE SIYARAM BUILDERS | - | - | 29 Dec 2021 |
| JAI AMBA APPARTMENT 16 | NILESH PRAKASHRAO THAKARE | - | - | 29 Jan 2022 |
| NUTAN RESIDENCY | ADITYA DEEPAKKUMAR HEDA | - | - | 22 Feb 2022 |
| Sushila Residency | Chhatrapati Shivaray Associates | - | - | 8 Mar 2022 |
| MAHIND WISDOM | PRADHNYAKAR HARIDAS BHALEKAR | - | - | 3 Feb 2022 |
| Shree Datta Prabhu Residency | RAVINDRA PUNDLIKRAO MAHALLE | - | - | 2 Feb 2022 |
| V K COMMERCIAL COMPLEX | VK CONSTRUCTION & DEVELOPERS | - | - | 2 Mar 2022 |
| Tulsi Pride | Nitesh Shyam Bundele | - | - | 15 Feb 2022 |
| Deep Residency | Deep Builders And Developers | - | - | 20 Jun 2022 |
| Vasudeo Apartment | Saurabh Raju Ingole | - | - | 8 Mar 2022 |
| SAI ENCLAVE | MAHESH CHETANDAS BAJAJ (HUF) | - | - | 8 Mar 2022 |
| JAEE RESIDENCY 2 | MANISHA ANANTKUMAR LINGOT | - | - | 25 Mar 2022 |
| Sai Isha Apartment | Ajayshree Apartment | - | - | 15 Jun 2022 |
| Shri Krishna Residency | S R Builders And Developers | - | - | 15 Jun 2022 |
| Silver Plaza | ARUN L.GUPTA AND OMPRAKASH L.GUPTA | - | - | 24 May 2022 |
| SAI-SHALWAK | NITIN VINAYAK DANGORE | - | - | 18 May 2022 |
| GOVINDA TRADE CENTER | SHRI GOVINDA PROPERTIES PRIVATE LIMITED | - | - | 28 Apr 2022 |
| Sai Infinity | Agarkar Builders And Developer | - | - | 12 May 2022 |
| Kailash Tower | Shyam Prabhakarrao Kedare | - | - | 18 May 2022 |
| GURUMAULI RESIDENCY | MANOJ SANTOSHRAO DESHMUKH | - | - | 20 Jun 2022 |
| SHRI SAI GAJANAN ENCLAVE II | JEET SHUTAKSHI BUILDERS | - | - | 15 Jun 2022 |
| Gokuldham Residency | M/S C & D ENGINEER'S & DEVELOPERS | - | - | 20 Jun 2022 |
| KRUSHNAI HEIGHTS | URJA INFRASTRUCTURE | - | - | 16 Sep 2022 |
| Gayatri Heights | Rajesh Rameshpant Kherde | - | - | 15 Dec 2022 |
| TARA RESIDENCY | Ramdas Vyankatrao Nistane | - | - | 12 Oct 2022 |
| Gokuldham | Gokuldham Construction | - | - | 19 Oct 2022 |
| MAULI APARTMENT | Prakash Namdeorao Saurkar | - | - | 14 Sep 2022 |
| RUKHMINI RESIDENCY | RAVINDRA WANKHADE | - | - | 15 Dec 2022 |
| DHRUVATARA | ADA ASSOCIATES | - | - | 3 Jan 2023 |
| VAISHNAVI HERITAGE | VAISHNAVI INFRA | - | - | 22 Feb 2023 |
| Ali Tower | Universal Builders | - | - | 2 Dec 2022 |
| SHRI NANDAN | ANANT KESHAORAO SAURKAR | - | - | 17 Jan 2023 |
| SAI SAGAR ENCLAVE XIV | SAGAR PANDHARINATH BANKAR | - | - | 12 Dec 2022 |
| AAKAR PRIME | ROHIT ASHOKRAO JIWARKAR | - | - | 24 Jan 2023 |
| Krushnayan Residency | Rayaji Realty | - | - | 26 Dec 2022 |
| ADVIK NUTAN RESIDENCY | ADVIK NUTAN ASSOCIATES | - | - | 3 Feb 2023 |
| SAI DARSHAN APPARTMENT | A.M.D. DEVELOPERS | - | - | 21 Apr 2023 |
| Shri Guru Plaza | Shree Gajanan Infra | - | - | 30 Jan 2023 |
| VASANTPUSHPA | ABHISHEK VASANTRAO VINCHURKAR | - | - | 17 Jan 2023 |
| PARIJAT RESIDENCY | S & M ASSOCIATES | - | - | 6 Mar 2023 |
| BHERDE CITY MARK | DATERAO BUILDER AND ASSOCIATES | - | - | 19 Jan 2023 |
| VANDANAI EMPIRE | SHIV BUILDERS | - | - | 30 Jan 2023 |
| Gandharv Skyline | Gandharv Meghe Associates | - | - | 15 Feb 2023 |
| Horizon H Square | Horizon Creators | - | - | 24 Jan 2023 |
| Advik Two | Tathey Realty | - | - | 21 Apr 2023 |
| CRYSTAL TOWER | LAXMIKANT PRABHAKAR JOSHI | - | - | 22 May 2023 |
| JIJAH PROSPERA | DIGVIJAY SURENDRA DESHMUKH | - | - | 27 Mar 2023 |
| SHRAVIKA RESIDENCY | SAGAR PRAKASHRAO BUTE | - | - | 12 Apr 2023 |
| Sai Darshan Heights | POOJA BUILDERS & DEVELOPERS | - | - | 28 Apr 2023 |
| SANKALP PRIDE | SANKALP BUILDERS DEVELOPERS | - | - | 8 Jun 2023 |
| MK MALL | DEEPRAJAM INFRASPACE LLP | - | - | 19 Jul 2023 |
| CENTRAL VISTA | SHRI GOVINDA DEVELOPERS | - | - | 13 Jul 2023 |
| H. V. Y. EMPIRE | SHRI GANESHAY NAMAHA BUILDERS & DEVELOPERS | - | - | 27 Jun 2023 |
| MAHENDRA ABODES | ANKESH NAVINKUMAR CHORDIYA | - | - | 13 Jul 2023 |
| Shiva Heights | M Krishna Buchanna | - | - | 7 Jul 2023 |
| TITAN RESIDENCY | D-REALTY | - | - | 9 Aug 2023 |
| Galaxy Heights | Sky Point Builders | - | - | 23 Jun 2023 |
| MORPANKH AVENUE | NIRAJ REALTY | - | - | 5 Oct 2023 |
| NILKANTH HEIGHTS | BHASKAR GOMAJI DAHAT | - | - | 10 Oct 2023 |
| GANESH PLAZA | pravin sahebrao mahalle | - | - | 22 Sep 2023 |
| Sai Park | Tejas Associates | - | - | 5 Oct 2023 |
| Indrayani wada | Govind Shridhar Tatte | - | - | 27 Dec 2023 |
| Shri Vishwa Heights | MADHUBAN ASSOCIATES | - | - | 12 Oct 2023 |
| SAI CITY | ANSHUMAN BUILDERS | - | - | 10 Nov 2023 |
| JIJAU RESIDENCY PARK | MATOSHRI DEVELOPERS | - | - | 22 Sep 2023 |
| NATIONAL MALL | IRFAN KHAN USMAN KHAN | - | - | 25 Jan 2024 |
| GRISHA HEIGHT SKYLINE | SKYLINE REALITIES | - | - | 5 Oct 2023 |
| SHRI GIRIJATMAJ HEIGHTS | SAGAR PRAKASHRAO BUTE | - | - | 23 Oct 2023 |
| KESHAVAM HEIGHTS | SHRI GOVINDA BUILDCON | - | - | 27 Oct 2023 |
| GAGAN ENCLAVE | IMPERIAL BUILDERS AND DEVELOPERS | - | - | 22 Nov 2023 |
| RUDRAKSHA APARTMENT | SHIVNANDAN BUILDERS AND DEVELOPERS | - | - | 15 Feb 2024 |
| MILLENIUM PARK | CITY EMPIRE INFRA LLP | - | - | 27 Dec 2023 |
| GOKULAM | GOVINDA GANESHA INFRASPACES | - | - | 15 Jan 2024 |
| AVANTIKA RESIDENCY | PRATIKSHA PRAVIN MAHALLE | - | - | 3 Jan 2024 |
| Sky Garden Hills | V & M BUILDERS & DEVELOPERS | - | - | 22 Mar 2024 |
| DIAMOND HEIGHTS | QUALITY STONE CONSTRUCTION AND DEVELOPERS LLP | - | - | 12 Feb 2024 |
| GOKULAM 2 | GOVINDA GANESHA INFRASPACES | - | - | 5 Apr 2024 |
| CITYLAND EMPIRE | CITYLAND EMPIRE | - | - | 16 Jul 2024 |
| The Busyland Block-M | Busyland Construction Co | - | - | 22 May 2024 |
| SRUSHTI COMMERCIALS | SRUSHTI COMMERCIALS | - | - | 23 Apr 2024 |
| THE PRESIDENT | SRUSHTI BANDSONS | - | - | 10 May 2024 |
| GOVINDA ARCADE | STEELARROW COMMERCIAL LLP | - | - | 28 Jun 2024 |
| BHAIRAVI HERITAGE | Ashish Mohanrao Jirapure | - | - | 11 Jun 2024 |
| Veera Enclave | Chetan Associates | - | - | 16 Jul 2024 |
| Shree Govindjyot Residency | Mangesh Shyamrao Gulhane | - | - | 7 Nov 2024 |
| Tulsi Utkarsh | Nitesh Shyam Bundele | - | - | 7 Nov 2024 |
| Guru Gajanan Residency | VTLD AND BUILDERS GROUP | - | - | 4 Dec 2024 |
| GOVIND IMPRESSA | Suresh Govindramji Malviya | - | - | 10 Dec 2024 |
| JAYU HEIGHTS | NITIN MOHOD | - | - | 13 Jan 2025 |
| SKY VUE | M/S ARK INFRASPACE | - | - | 7 Mar 2025 |
| VYOM PHASE 1 | TALDA INFINITY LLP | - | - | 19 May 2025 |
Developers active in Amravati
PMAY AMRAVATI MUNICIPAL CORPORATION (8), Vijay Nanakram Talda (7), M/S DREAMZ INFRASTRUCTURE (5), LAXMIKANT PRABHAKAR JOSHI (4), Jayant Parmanand Chhutlani (4), RAVINDRA PUNDLIKRAO MAHALLE (4). Each link opens the promoter's track record built from their own filings.
Frequently asked questions
How do I shortlist among the Amravati projects listed above?
Compare each project against its neighbours, not against the brochure. The median project on this page is 0% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.
What does a revised completion date on a Amravati project actually mean?
The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.
What stamp duty will I pay on a flat in Amravati district?
The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.
What does it mean that some Amravati registrations have lapsed?
A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.
What if a Amravati project shows strong sales but slow construction?
That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.
Data from official MahaRERA filings.