Registration lapsed No litigation declared Residential / Group Housing project

KAVYA HEIGHTS

By AARYA DEVELOPERS

RG-MH-27503 · RERA P52100034815 · Last updated on MahaRERA portal: 20 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 8 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 14 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2026Possession promised8 months past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
1Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

KAVYA HEIGHTS is a Residential / Group Housing project by AARYA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100034815 on 28 Apr 2022. Possession was promised by 25 Feb 2026 and is now 8 months past that date. The completion date has moved by 14 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKAVYA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100034815
  • ReraGenie IDRG-MH-27503

Builder

  • NameAARYA DEVELOPERS
  • Entity typePartnership
  • PartnerKOMAL DEEPAK RODE
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

8 months past promisethis monthRegisteredApr 2022First promiseDec 2024Revised toFeb 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion25 Feb 2026
  • Revised completionRevised to 25 Feb 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed141 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA70000
WING BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

WING A89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
WING B89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 20 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes20%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area708 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
NITIN ARJUN BHOGLEGirimPune
VITTHAL VASANTROA MUSALEPethPune
MANISHA MARUTI SATOTEManchar (CT)Pune
NISHANT MADHUKAR RANAWAREBanerPune
GANESH NAMDEV ZAGADEKazadPune
ROHIDAS GULAB SAKATKhorodiPune
RAHUL ABHIMANYU JAGALPUREMundhawaPune
KAILASH KARMASHI KAROTRAkondhwa BKPune

Approvals and building plan

Permissible FSI718.84
Proposed, not sanctioned719 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerANKUSH RANDAS LOKHANDE
PartnerRole in project
AARYA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027981Dec 2024 → Feb 2026

Reason as filed by the promoterDespite our unwavering commitment and relentless efforts, unforeseen challenges have significantly hindered our progress. The strike of metal and Crush-Sand in Pune caused severe disruptions in the supply of essential materials, stalling construction. Additionally, unresolved RCC contractor and labour disputes led to unexpected delays, making it increasingly difficult to adhere to the original timeline. These setbacks were beyond our control, and despite every possible effort, we could not mitigate their impact in time. We deeply value our responsibility and assure you of our continued dedicat

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500907soubhagya Kumar SinghAARYA DEVELOPERS15/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SEP 22 (2).pdf20 Nov 2025
Form 2File: FORM 2 SEP 22.pdf20 Nov 2025
Form 3File: FORM 3 SEP 22.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 22.pdf20 Nov 2025
Form 1File: FORM 1.pdf20 Nov 2025
Form 2File: FORM 2.pdf20 Nov 2025
Form 3File: FORM 3.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 22.pdf20 Nov 2025
Form 1File: FORM 1 (1).pdf20 Nov 2025
Form 2File: FORM 2 SEP 23.pdf20 Nov 2025
Form 3File: FORM 3 SEP 23.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 23.pdf20 Nov 2025
Form 1File: FORM 1 DEC 23.pdf20 Nov 2025
Form 2File: FORM 2.pdf20 Nov 2025
Form 3File: FORM 3 DEC 23.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 23.pdf20 Nov 2025
Form 1File: FORM 1 MAR 24.pdf20 Nov 2025
Form 2File: FORM 2 MAR 24.pdf20 Nov 2025
Form 3File: FORM 3 MAR 24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 24.pdf20 Nov 2025
Form 1File: FORM 1.pdf20 Nov 2025
Form 2File: FORM 2 JUNE 24.pdf20 Nov 2025
Form 3File: FORM 3.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 24.pdf20 Nov 2025
Form 1File: FORM 1.pdf20 Nov 2025
Form 2File: FORM 2 SEP 24.pdf20 Nov 2025
Form 3File: FORM 3 SEP 24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEP 24.pdf20 Nov 2025
Form 1File: FORM 1.pdf20 Nov 2025
Form 2File: FORM 2 DEC 24.pdf20 Nov 2025
Form 3File: FORM 3 DEC 24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 24.pdf20 Nov 2025
Form 1File: FORM 1 MAR 25.pdf20 Nov 2025
Form 2File: FORM 2 MAR 25.pdf20 Nov 2025
Form 3File: FORM 3 MAR 25 (2).pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 25.pdf20 Nov 2025
Form 1File: FORM 1 MAR 23.pdf20 Nov 2025
Form 2File: Form 2.pdf20 Nov 2025
Form 3File: Form 3.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf20 Nov 2025
Form 1File: FORM 1 JUNE 23.pdf20 Nov 2025
Form 2File: FORM 2 JUNE 23.pdf20 Nov 2025
Form 3File: Form 3.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 23.pdf20 Nov 2025
Disclosure of sold/ booked inventoryFile: DocScanner May 28, 2025 1-26 PM (1) (3).pdf28 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: DEEPAK P SONI (1)_11zon.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 05-May-2025 6-19 pm.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 05-May-2025 6-19 pm (1).pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner May 19, 2025 11-48 AM.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner May 19, 2025 11-48 AM (1).pdf19 May 2025
Disclosure of sold/ booked inventoryFile: DocScanner May 19, 2025 3-14 PM (1).pdf19 May 2025
Details of encumbrances concerned to FinanceFile: Adobe Scan Mar 22, 2025 (1) (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: kavya heights sep 2022 (1) (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: dec 2022 kavya (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: march 2023 kavya heights (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: kavya heights june 2023 (1) (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: kavya sep 2023 (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: dec 2023 kavya heights (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: kavya heights march 2024 (1) (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: june 2024 kavya heights (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: sep 2024 kavya heights (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: Document (2).pdf22 Mar 2025
Details of encumbrances concerned to LegalFile: Adobe Scan Mar 22, 2025 (1) (1).pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: Document.pdf15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Document 2 (1).pdf15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Document 2.pdf15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DEEPAK P SONI_compressed.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DEEPAK P SONI_compressed (1).pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DEEPAK P SONI_compressed.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 dec 2025_compressed (1).pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 dec 2025_compressed (2).pdf13 Mar 2025
Declaration in FORM BFile: afidevite (1).pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 8_0001.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 7_0001.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 5_0001.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: lokhande 2_0001.pdf12 Mar 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 14 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAVYA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

Builder: AARYA DEVELOPERS

AARYA DEVELOPERS has 4 registrations on MahaRERA, including PRANAV APARTMENT and VARAD RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KAVYA HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAVYA HEIGHTS is delayed beyond 25 Feb 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAVYA HEIGHTS?

The registered promoter entity is AARYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAVYA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAVYA HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAVYA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAVYA HEIGHTS?

The professionals named in the filing: Engineer: ANKUSH RANDAS LOKHANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAVYA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAVYA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAVYA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.