KAPILA VASTU

By KAPILA DEVELOPERS & BUILDERS

RG-MH-09169 · RERA P52100010029 · Last updated on MahaRERA portal: 10 Feb 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 81 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 81 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
15 of 32Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

KAPILA VASTU is a Residential / Group Housing project by KAPILA DEVELOPERS & BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100010029 on 23 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 81 months from the original filing. 17 of the 32 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKAPILA VASTU
  • TypeResidential / Group Housing
  • Location
    • Kesnand
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010029
  • ReraGenie IDRG-MH-09169

Builder

  • NameKAPILA DEVELOPERS & BUILDERS
  • Entity typePartnership
  • PartnersMININATH BHAUSAHEB GHADGE, ANIRUDHA HARI MORE, SANGRAM SAMPATRAO SALUNKE

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed161 files

Current status

53%17 of 32 units booked
73.7%Work done, per cost certificate

Figures as on 10 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAPILA VASTU Phase-1NA8732032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

KAPILA VASTU Phase-1: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 10 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,650 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025
LandownerVillageDistrict
Sandeep WalhekarKesnandPune
Shankar Laxman WalhekarKesnandPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI1960.41
Proposed, not sanctioned1,060 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHINJEWADI PUNE
Estimated costRs 4.73 cr
Cost incurredRs 3.49 cr
Work done73.71%
BuildingWingEstimatedIncurred
KAPILA VASTU Phase-1NARs 4.27 crRs 3.09 cr
-NARs 46.00 lakhRs 39.44 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SANGRAM SALUNKE
EngineerSHRI UPENDRA PURANADARE GENSYS TECHNOLOGIES PVT LTD
Chartered Accountantpriyesh jain
Chartered AccountantNilesh Raut
Chartered AccountantG C Godbole
PartnerRole in project
KAPILA DEVELOPERS & BUILDERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015367Sep 2020 → Mar 2024

Reason as filed by the promoterDue to after effect of COVID pandemic, labor force, necessary for carrying out construction activity, still havent returned back to active duty from their native places. With the current slow restarting of economy developer is confident to complete remaining work within next One year. After communicating the same to stake holders even they are of the opinion that an extension of One year would be in interest of all parties involved

EXT52100008670Sep 2020 → Sep 2021

Reason as filed by the promoterAmenity space sanction pending from PMRDA which is already mentioned in previous plan sanction

EXT52100011707Sep 2020 → Mar 2023

Reason as filed by the promoterDue to after effect of COVID pandemic, labor force, necessary for carrying out construction activity, still haven't returned back to active duty from their native places. With the current gradual restarting of economy, developer is confident to complete remaining work within next twelve months. After communicating the same to stake holders even they are of the opinion that an extension of twelve months would be in interest of all parties involved.

EA01012619216Sep 2020 → Jun 2027

Reason as filed by the promoterWe are applying for Extension of our Project Completion Date with MahaRERA Authority under Section - 7(3) of the Act. We would like to inform the Authority that the development on site is under process and is expected to be completed in next 36 to 37 months and then will require another 2 months to fulfil Sanction Authorities formalities and receive the completion certificate for the project. After conveying the same to the allottees, it was mutually decided to apply for an extension with the Authority. Hence, we request you to extend proposed date of completion for the Project from 28/03/2024

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000290197Ganapati Pandurang PowarKapila Developers22/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30092025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025 (1).pdf10 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30092025.pdf10 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30092025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31122025.pdf10 Feb 2026
Form 2A (FY 2023-2024)File: Form-2A Quality Assurance 31032024.pdf6 Jan 2026
Form 2A (FY 2022-2023)File: Form-2A FY 2022-23.pdf6 Jan 2026
Form 2A (FY 2021-2022)File: Form-2A Quality Assurance FY 2020-21 15032022.pdf6 Jan 2026
Form 2A (FY 2020-2021)File: Form-2A FY 2021-22.pdf6 Jan 2026
Form 2A (FY 2018-2019)File: Form-2A FY 2018-19.pdf6 Jan 2026
Form 2A (FY 2017-2018)File: Form-2A FY 2017-18.pdf6 Jan 2026
Form 1File: Form-1 Architect Certificate 31032023.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31032023.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31032023.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032023.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 30092022.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 30092022.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 30092022.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 30092022.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 30062022.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 30062022.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 30062022.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 30062022.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 15032022.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31032022.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31032022.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032022.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 31122021.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31122021.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31122021.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31122021.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 31032021.pdf3 Jan 2026
Form 2File: Form-1 Architect Certificate 31032021.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31032021.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032021.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 31032020.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31032020.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31032020.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032020.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 31032019.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31032019.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31032019.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032019.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 31032018.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 16062018.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 16062018.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032018.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 30122022.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 31122022.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 31122022.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31122022.pdf3 Jan 2026
Form 1File: Form-1 Architect Certificate 30062023.pdf3 Jan 2026
Form 2File: Form-2 Engineer Certificate 30062023.pdf3 Jan 2026
Form 3File: Form-3 CA Certificate 30062023.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092023.pdf3 Jan 2026
Form 5 (FY 2023-2024)File: Fomr-5 FY 2023-24.pdf3 Jan 2026
Form 5 (FY 2022-2023)File: Fomr-5 FY 2022-23.pdf3 Jan 2026
Form 5 (FY 2021-2022)File: Fomr-5 FY 2021-22.pdf3 Jan 2026
Form 5 (FY 2017-2018)File: Form-5 RERA Audit FY 2017-18 30042022.pdf2 Jan 2026
Form 5 (FY 2018-2019)File: Form-5 RERA Audit FY 2018-19 30042022.pdf2 Jan 2026
Form 5 (FY 2019-2020)File: Form-5 RERA Audit FY 2019-20 30042022.pdf2 Jan 2026
Form 5 (FY 2020-2021)File: Form-5 RERA Audit FY 2020-21 30042022.pdf2 Jan 2026
Form 1File: Form-1 Architect Certificate 30092023.pdf25 Dec 2025
Form 2File: Form-2 Engineer Certificate 30092023.pdf25 Dec 2025
Form 3File: Form-3 CA Certificate 30092023.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 30092023.pdf25 Dec 2025
Form 1File: Form-1 Architect Certificate 31122023.pdf25 Dec 2025
Form 2File: Form-2 Engineer Certificate 31122023.pdf25 Dec 2025
Form 3File: Form-3 CA Certificate 31122023.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31122023.pdf25 Dec 2025
Form 1File: Form-1 Architect Certificate 31032024.pdf25 Dec 2025
Form 2File: Form-2 Engineer Certificate 31032024.pdf25 Dec 2025
Form 3File: Form-3 CA Certificate 31032024.pdf25 Dec 2025

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 81 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAPILA VASTU on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kesnand13,700+ in Pune

2 kmKAPILA VASTUCompleted 8Lapsed / revoked 10Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: KAPILA DEVELOPERS & BUILDERS

KAPILA DEVELOPERS & BUILDERS has 1 registration on MahaRERA, including KAPILA VASTU. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KAPILA VASTU is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAPILA VASTU?

The registered promoter entity is KAPILA DEVELOPERS & BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAPILA VASTU?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAPILA VASTU?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAPILA VASTU?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAPILA VASTU?

The professionals named in the filing: Architect: AR SANGRAM SALUNKE; Engineer: SHRI UPENDRA PURANADARE GENSYS TECHNOLOGIES PVT LTD; Chartered Accountant: priyesh jain; Chartered Accountant: Nilesh Raut; Chartered Accountant: G C Godbole. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAPILA VASTU?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAPILA VASTU. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAPILA VASTU to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.