KANCHANGIRI

By GOODWILL BUILDERS

RG-MH-43149 · RERA P51800009001 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
11 of 11Construction stages doneevery applicable stage filed complete
62 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 228 documents Report an error

KANCHANGIRI is a Others project by GOODWILL BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009001 on 19 Aug 2017. Possession was promised by 15 Sep 2026 and is now 1 months past that date. The completion date has moved by 33 months from the original filing. 102 of the 164 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameKANCHANGIRI
  • TypeOthers
  • Location
    • ASHOK CHAKRAVARTI ROAD
    • VILLAGE WADHWAN
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009001
  • ReraGenie IDRG-MH-43149

Builder

  • NameGOODWILL BUILDERS
  • Entity typePartnership
  • PartnersRAJANIKANT KANTILAL KADAKIA, MALKESH PRATAPRAI SHETH, MILAN DINESH SHAH, PIYUSH PRATAPRAI SHETH, KALAVATI PRATAPRAI SHETH

Key dates

1 months past promisethis monthRegisteredAug 2017First promiseDec 2023Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion15 Sep 2026
  • Revised completionRevised to 15 Sep 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed228 files

Current status

62%102 of 164 units booked
73.8%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KANCHANGIRINA28251559164

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

KANCHANGIRI: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed290

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots290
Closed/Covered290

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,399 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI16956.27
Proposed, not sanctioned16,956 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround and mezzanine Floor, Botawala Chambers, 2, Mumbai- 400001
Estimated costRs 115.00 cr
Cost incurredRs 84.87 cr
Work done73.8%
BuildingWingEstimatedIncurred
KANCHANGIRINARs 115.00 crRs 84.87 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHIT SANGHAVI
EngineerPravin Kulkarni
Chartered AccountantYash Mehta
Chartered AccountantMehta Bharat & Associates
PartnerRole in project
GOODWILL BUILDERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017554Dec 2023 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51800024954Dec 2023 → Jun 2025

Reason as filed by the promoterAs per Order No. 40 Dated 27/12/2022 we are applying for Extension without majority consents of the allottees. We have also received the Order from the Chairperson of MahaRERA Mr. Manoj Saunik for the approval of extension As per Order No. 40 for the same which has been uploaded in the application for the extension.

EA09062501457Dec 2023 → Sep 2026

Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 29/08/2025 and we have also initiated the process for the possession as well. In view of this as the said project obtained full OC uploading consents from allottees will not be required. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring timely execution, and addressing any issues that may arise. This proactive approach aims to ensure a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Oct 2024

Documents filed228

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 228 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_FY_2024-25.pdf18 Aug 2026
Form 5 (FY 2023-2024)File: Form 5_FY_2023-24.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf17 Aug 2026
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf17 Aug 2026
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf17 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A_FY_ 2024-25.pdf17 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A_FY_ 2024-25.pdf17 Aug 2026
Layout approvalFile: Page 01 (5).pdf10 Jun 2026
Building plan approvalFile: Page 02.pdf10 Jun 2026
Building plan approvalFile: Page 03.pdf10 Jun 2026
Building plan approvalFile: Page 04.pdf10 Jun 2026
Building plan approvalFile: Page 05.pdf10 Jun 2026
Building plan approvalFile: Page 06.pdf10 Jun 2026
Building plan approvalFile: Page 07.pdf10 Jun 2026
Building plan approvalFile: Page 08.pdf10 Jun 2026
Building plan approvalFile: Page 09.pdf10 Jun 2026
Building plan approvalFile: Page 10.pdf10 Jun 2026
Building plan approvalFile: Page 11.pdf10 Jun 2026
Building plan approvalFile: Page 12.pdf10 Jun 2026
Building plan approvalFile: Page 13.pdf10 Jun 2026
Building plan approvalFile: Page 14.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - 29-08-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 - 29-08-2025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 - 29-08-2025.pdf17 Dec 2025
Form 1File: Form 1 March 2025.pdf7 Jul 2025
Form 2File: Form 2 March 2025.pdf7 Jul 2025
Form 3File: Form_3_March25.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2025.pdf7 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Kanchangiri as on Dec 2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kanchangiri as on Dec 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Kanchangiri as on Dec 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form-3 Sept 2024.pdf11 Nov 2024
Certificates of CA (Form 5)File: Form 5 FY2017-18.pdf4 Nov 2024
Certificates of CA (Form 5)File: Form 5 FY2017-18.pdf4 Nov 2024
Certificates of CA (Form 5)File: Form 5FY2018-19.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5FY2018-19.pdf4 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (2).pdf4 Nov 2024
Disclosure of sold/ booked inventoryFile: Circular 29 (1).pdf4 Nov 2024
Declaration in FORM BFile: FORM -B.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2024.pdf30 Oct 2024
Form 2AFile: FORM 2A FY 2019-20.PDF30 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D (32).pdf30 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Promoter in other Real Estate Organisation.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2418034_OC_signed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Sign_GB.pdf28 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Sign_GB.pdf28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GB_FORM-5_SIGN.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kanchangiri.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Kanchangiri.pdf8 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Kanchangiri.pdf8 Aug 2024
OtherFile: Kanchangiri Brochure_compressed.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kanchangiri as on March 2024.pdf1 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Kanchangiri as on March 2024.pdf1 Jun 2024
Certificates of CA (Form 3)File: Form 3 - Kanchangiri as on March 2024.pdf1 Jun 2024
Layout approvalFile: Layout - KANCHANGIRI-1.pdf10 May 2024
Building plan approvalFile: Layout - KANCHANGIRI-2-12.pdf10 May 2024
Copy of Layout Approval (in case of layout)File: Layout - KANCHANGIRI-1.pdf10 May 2024
Building Plan Approval (IOD)File: Layout - KANCHANGIRI-2-12.pdf10 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - KANCHANGIRI.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kanchangiri as on Dec 2023.pdf8 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Kanchangiri as on Dec 2023.pdf8 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Kanchangiri as on Dec 2023.pdf8 Mar 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf8 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Kanchangiri as on Dec 2023.pdf8 Mar 2024

How this compares with Mumbai Suburban

62%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 33 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KANCHANGIRI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE WADHWAN6,700+ in Mumbai Suburban

2 kmKANCHANGIRICompleted 86Lapsed / revoked 64Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 270 registered projects within 2 km.

Builder: GOODWILL BUILDERS

GOODWILL BUILDERS has 1 registration on MahaRERA, including KANCHANGIRI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KANCHANGIRI is delayed beyond 15 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KANCHANGIRI?

The registered promoter entity is GOODWILL BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KANCHANGIRI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KANCHANGIRI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KANCHANGIRI?

The professionals named in the filing: Architect: NISHIT SANGHAVI; Engineer: Pravin Kulkarni; Chartered Accountant: Yash Mehta; Chartered Accountant: Mehta Bharat & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KANCHANGIRI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KANCHANGIRI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KANCHANGIRI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.