Home / Browse projects / Mumbai Suburban, Maharashtra / KANAKIA FUTURE CITY D

Completed No litigation declared Residential / Group Housing project

KANAKIA FUTURE CITY D

By KANAKIA SPACES REALTY PRIVATE LIMITED

RG-MH-34159 · RERA P51800017413 · Last updated on MahaRERA portal: 21 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 224 documents Report an error

KANAKIA FUTURE CITY D is a Residential / Group Housing project by KANAKIA SPACES REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017413 on 9 Aug 2018. The registration is recorded completed; possession was promised by 30 Jun 2027.

At a glance

Project

  • NameKANAKIA FUTURE CITY D
  • TypeResidential / Group Housing
  • Location
    • TIRANDAZ
    • POWAI
    • Kurla
    • Mumbai Suburban
    • 400076
  • Pincode400076
  • RERA no.P51800017413
  • ReraGenie IDRG-MH-34159

Builder

  • NameKANAKIA SPACES REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2019PTC331509
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsRasesh Babubhai Kanakia, Himanshu Babubhai Kanakia
  • Other registrations10 more →
  • Completed11 of 11
  • Declared earlier projects15 →

Key dates

this monthRegisteredAug 2018PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2018
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed224 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CODENAME FUTURE DNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

CODENAME FUTURE D: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed242

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots242
Closed/Covered242

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19404.0
Proposed, not sanctioned1,075 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTRE MAHAKALI CAVES ROAD ANDHERI EAST MUMBAI 400093

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Sujit Yede
ArchitectMr.Siddhesh Samant
ArchitectMr. Manoj V. Daisaria
ArchitectV P ARCHITECT
EngineerMr.Nikhil Shanghavi
EngineerMr. Charudatta V. Samant
PartnerRole in project
KANAKIA SPACES REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2024

Documents filed224

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 224 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf21 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf21 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Kanakia Future City D.pdf29 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Powai.pdf21 Feb 2024
Certificates of CA (Form 3)File: CA Certificate Kanakia Future City D.pdf19 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 02022024 Kanakia Future City D.pdf19 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Kanakia Future City D.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Kanakia Future City D 31122023.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate D wing 30092023.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate D wing 03112023.pdf22 Nov 2023
Certificates of CA (Form 3)File: CA Certificate- D wing compressed.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Kanakia Future City D Form5 2022 23.pdf20 Nov 2023
Certificates of CA (Form 3)File: CA Certificate Future City D.pdf17 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC dated 12923.pdf10 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certicate Future D.pdf9 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Future city D.pdf23 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Kanakia Future City D - Form 2A 310323.pdf19 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Future city D.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate 310323 Future City D.pdf30 May 2023
Certificates of CA (Form 3)File: CA Certificate Future City D.pdf30 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-2022 - D Wing.pdf28 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KFC - D - Ar Certificate_compressed.pdf30 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KFC - D - Engg Certificate - December 2022_compressed.pdf29 Mar 2023
Certificates of CA (Form 3)File: KFC - D - CA Certificate.pdf29 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: kanakia future City D Dec 22.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-2019.pdf24 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021 - future City D.pdf23 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Kanakia Future City D.pdf23 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2022 compressed.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2022 compressed.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2022 compressed.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 2021 compressed.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: March 2022 compressed.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June 2022 compressed.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 2022 compressed.pdf25 Jan 2023
Certificates of CA (Form 3)File: Dec 2021 compressed.pdf25 Jan 2023
Certificates of CA (Form 3)File: March 2022 compressed.pdf25 Jan 2023
Certificates of CA (Form 3)File: June 2022 compressed.pdf25 Jan 2023
Certificates of CA (Form 3)File: Sep 2022 compressed.pdf25 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: kanakia future City D.pdf19 Jan 2023
Certificates of CA (Form 3)File: Kanakia Future City D RERA CA Certificate 300922.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kanakia Future City D Form5 202122.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kanakia Future City D.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Codename D Engineers Certificate 31122021.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kanakia Future City D Engineers Certificate 31032022.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kanakia Future City D Engineers Certificate 300622.pdf12 Jan 2023
Certificates of CA (Form 3)File: Rera certificate December 21 Wing D.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA certificate Kanakia Future City D 310322.pdf12 Jan 2023
Certificates of CA (Form 3)File: Kanakia Future City D Certificate 300622.pdf12 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect certificate 30062022 D Wing.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect certificate 30092022 D Wing.pdf11 Jan 2023
Declaration about Commencement CertificateFile: Declaration about CC Kanakia Future City D.pdf5 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf25 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: kanakia future City D-1.pdf23 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Kanakia Future City D.pdf16 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Kanakia Future City D.pdf16 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Kanakia Future City D.pdf4 Jul 2022
Certificates of CA (Form 3)File: CA Certificate December 21 Kanakia Future City D.pdf16 Feb 2022
CERSAI detailsFile: CERSAI Search Report Kanakia Future City D.pdf11 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep 2019.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2019.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar 2020.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2020.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep 2020.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2020.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar 2021.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2021.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate August 2021.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 2019.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2020.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2020.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Sep 2020.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 2020.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2021.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate June 2021.pdf17 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate August 2021.pdf17 Nov 2021
Certificates of CA (Form 3)File: Form 3 codename D Dec 19.pdf16 Nov 2021
Certificates of CA (Form 3)File: Form 3 codename D Mar 20.pdf16 Nov 2021

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise8 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KANAKIA MIAMIPlot No 766 Junction of Causeway Mori Road Mahim W Mumbai 40001647CompletedSep 2018Late, Nov 2019
WALL STREET WING BCHAKALA ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 400093211CompletedDec 2017Mar 2017
KANAKIA AROHADATTAPADA ROAD DONGRI OFF VILLAGE KANHERI NEAR LOHANA MARRIAGE HALL BORIVALI EAST MUMBAI 400066183CompletedDec 2017Mar 2017
ZILLION PHASE 2LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070107CompletedDec 2016Late, Jan 2017
BOOMERANG PHASE 2MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 40007256CompletedJun 2015Late, May 2016
ZILLION PHASE 1LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070100CompletedDec 2014Aug 2014
ATRIUM IINEXT TO 215 ATRIUM BEHIND COURTYARD MARRIOT ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 40009364CompletedDec 2014Late, Jan 2015
SAMARPAN EXCOTICAWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066189CompletedApr 2014Late, Jun 2014
351 ICONWETSERN EXPRESS HIGHWAY ANDHERI EAST MUMBAI 4000699CompletedSep 2013Jul 2013
ANANTABEVERLY PARK MIRA ROAD EAST THANE 40110756CompletedJun 2012Late, Dec 2012
WESTERN EDGE IIWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066152CompletedDec 2011Late, Jul 2012
BOOMERANG PHASE 1MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 400072159CompletedApr 2010Late, Aug 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KANAKIA FUTURE CITY D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POWAI6,700+ in Mumbai Suburban

Builder: KANAKIA SPACES REALTY PRIVATE LIMITED

KANAKIA SPACES REALTY PRIVATE LIMITED has 11 registrations on MahaRERA, including KANAKIA MIAMI and KANAKIA WALLSTREET WING A. Its filings disclose 15 earlier MahaRERA projects: declares 5 of 15 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KANAKIA FUTURE CITY D is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KANAKIA FUTURE CITY D?

The registered promoter entity is KANAKIA SPACES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC331509 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KANAKIA FUTURE CITY D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KANAKIA FUTURE CITY D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KANAKIA FUTURE CITY D?

The professionals named in the filing: Architect: Mr. Sujit Yede; Architect: Mr.Siddhesh Samant; Architect: Mr. Manoj V. Daisaria; Architect: V P ARCHITECT; Engineer: Mr.Nikhil Shanghavi; Engineer: Mr. Charudatta V. Samant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KANAKIA FUTURE CITY D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KANAKIA FUTURE CITY D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KANAKIA FUTURE CITY D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.