Home / Browse projects / Sindhudurg, Maharashtra / Kamat Highlight

Completed No litigation declared Residential / Group Housing project

Kamat Highlight

By Pranav Prakash Kamat

RG-MH-41880 · RERA P52900050327 · Last updated on MahaRERA portal: 15 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
12 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

Kamat Highlight is a Residential / Group Housing project by Pranav Prakash Kamat in Sindhudurg, Maharashtra, registered with MahaRERA as P52900050327 on 5 Apr 2023. The registration is recorded completed; possession was promised by 25 Dec 2025. 18 of the 30 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameKamat Highlight
  • TypeResidential / Group Housing
  • Location
    • Mohar Vidya Nagar
    • Kankavali
    • Kankavli
    • Sindhudurg
    • 416602
  • Pincode416602
  • RERA no.P52900050327
  • ReraGenie IDRG-MH-41880

Builder

  • NamePranav Prakash Kamat
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2023
  • Promised completion25 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Current status

60%18 of 30 units booked
91.6%Work done, per cost certificate

Figures as on 15 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kamat HighlightNA11830030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Kamat Highlight: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,639 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Subhash Narayan KakadeKankavaliSindhudurg
Kedar Mohan KulkarniNashikNashik
Madhura Mohan KulkarniPanvelRaigarh

Approvals and building plan

Sanctioning authorityKankavali Nagar Panchayat
Permissible FSI2883.44
Proposed, not sanctioned2,883 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKanakavali Rameshwar Plaza on NH - 66
Estimated costRs 7.00 cr
Cost incurredRs 6.41 cr
Work done91.61%
BuildingWingEstimatedIncurred
Kamat HighlightNARs 7.00 crRs 6.41 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Sadanand Andhari
EngineerSANDEEP SHETYE
EngineerHarshad Santaram Patade
Chartered AccountantChetan V Oswal
Chartered AccountantGaurav Phadnis
PartnerRole in project
Pranav Prakash Kamat-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: KH APRIL-JUNE23.pdf15 Dec 2025
Form 2File: KG FORM-2 APRIL-JUNE23.pdf15 Dec 2025
Form 3File: KH FORM-3 APRIL-JUNE23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-APRIL-JUNE23.pdf15 Dec 2025
Form 1File: KH JULY-SEP23.pdf15 Dec 2025
Form 2File: KH FORM-2 JULY-SEP23.pdf15 Dec 2025
Form 3File: KH FORM-3 JULY-SEP23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-JULY-SEP23.pdf15 Dec 2025
Form 1File: KH OCT-DEC23.pdf15 Dec 2025
Form 2File: KH FORM-2 OCT-DEC23.pdf15 Dec 2025
Form 3File: KH FORM-3 OCT-DEC23.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD OCT-DEC23.pdf15 Dec 2025
Form 1File: KH JAN-MARCH24.pdf15 Dec 2025
Form 2File: KH FORM-2 JAN-MARCH24.pdf15 Dec 2025
Form 3File: KH FORM-3 JAN-MARCH24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD JAN-MARCH24.pdf15 Dec 2025
Form 1File: KH APRIL-JUNE24.pdf15 Dec 2025
Form 2File: KH FORM-2 APRIL-JUNE24.pdf15 Dec 2025
Form 3File: KH FORM-3 APRIL-JUNE24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD APRIL-JUNE24.pdf15 Dec 2025
Form 1File: KH JULY-SEP24.pdf15 Dec 2025
Form 2File: KH FROM2 JULY-SEP24.pdf15 Dec 2025
Form 3File: KH FORM-3 JULY-SEP24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD JULY-SEP24.pdf15 Dec 2025
Form 1File: KH OCT-DEC24.pdf15 Dec 2025
Form 2File: KH FORM2 OCT-DEC24.pdf15 Dec 2025
Form 3File: KH FORM-3 OCT-DEC24.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD OCT-DEC24.pdf15 Dec 2025
Withdrawal Update Form 1File: OC Kamat Highlight - Form 1 - Arch certificate.pdf15 Dec 2025
Withdrawal Update Form 1File: OC Kamat Highlight - Form 1 - Arch certificate.pdf15 Dec 2025
Withdrawal Update Form 2File: OC Kamat Highlight - Form 2 - Engi certificate.pdf15 Dec 2025
Withdrawal Update Form 2File: OC Kamat Highlight - Form 2 - Engi certificate.pdf15 Dec 2025
Withdrawal Update Form 3File: Final Form3 kamat highlights.pdf15 Dec 2025
Withdrawal Update Form 3File: Final Form3 kamat highlights.pdf15 Dec 2025
Occupational CertificateFile: KAMAT HIGHLIGHT OC.pdf15 Dec 2025
Form 2A (FY 2023-2024)File: Kamat Highlight - Form 2A - Engi Qlty 23-24_compressed.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Kamat Highlight - Form 2A - Engi Qlty 24-25_compressed.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Kamat Highlight Form 5.pdf8 Dec 2025
Form 1File: KAMAT HIGHLIGHTS FORM-1 MARCH.pdf31 Jul 2025
Form 2File: KAMAT HILIGHTS FORM-2 MARCH.pdf31 Jul 2025
Form 3File: KAMAT HIGHLIGHTS FORM-3 MARCH.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: KAMAT HIGHLIGHTS SOLD AND BOOKED MARCH.pdf31 Jul 2025
Form 5 (FY 2023-2024)File: KAMAT HIGHLIGHTS FORM-5 APRIL23 TO OCT23.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q9-Kamat Highlight - Form 1 - Arch certificate.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q9-Kamat Highlight - Form 2 - Engi certificate.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Q9-Sold and Booked Inventory.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certifcate Highlight.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Highlight.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Highlight.pdf4 May 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory Highlight.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q8_signed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q8-Kamat Highlight -Form2 - Engi certificate.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q8-Kamat Highlight- Form1-arch certificate.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Q8-Kamat Highlight - sold unsold inventories.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q7-Kamat Highlight- Form1-arch certificate.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q7-Kamat Highlight Form 3 -CA Certificate RERA updation sept24.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q7-Kamat Highlight -Form2 - Engi certificate.pdf27 Nov 2024
Disclosure of sold/ booked inventoryFile: Q7-Kamat Highlight - sold unsold inventories.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Signed.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q7-Kamat Highlight- Form1-arch certificate.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Signed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q7-Kamat Highlight -Form2 - Engi certificate.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Kamat Highlight - sold unsold inventories.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cert upload.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Highlights upload.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Mar.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 april to june (1).pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 July to september (1).pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Oct to Dec (1).pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 April to June.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 July to September.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 October to Decmember2023.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 April to June.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 July to Sep2023.pdf5 Mar 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KAMAT VISHWA - 2P52900052902Near Kankavli College, Sindhudurg56Oct 2023OngoingDec 2025Not delivered

How this compares with Sindhudurg

60%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Kamat Highlight on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kankavali530+ in Sindhudurg

Builder: Pranav Prakash Kamat

Pranav Prakash Kamat has 3 registrations on MahaRERA, including Kamat Gurukul and Kamat Highlight. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Kamat Highlight is delayed beyond 25 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kamat Highlight?

The registered promoter entity is Pranav Prakash Kamat, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kamat Highlight?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kamat Highlight?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kamat Highlight?

The professionals named in the filing: Architect: Sanjay Sadanand Andhari; Engineer: SANDEEP SHETYE; Engineer: Harshad Santaram Patade; Chartered Accountant: Chetan V Oswal; Chartered Accountant: Gaurav Phadnis. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kamat Highlight?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kamat Highlight. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kamat Highlight to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.