Home / Browse projects / Sindhudurg, Maharashtra / KAMAT VISHWA - 2

Registered No litigation declared Residential / Group Housing project

KAMAT VISHWA - 2

By Pranav Prakash Kamat

RG-MH-06112 · RERA P52900052902 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 85%
20 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

KAMAT VISHWA - 2 is a Residential / Group Housing project by Pranav Prakash Kamat in Sindhudurg, Maharashtra, registered with MahaRERA as P52900052902 on 5 Oct 2023. Possession is promised by 25 Dec 2026. The completion date has moved by 12 months from the original filing. 36 of the 56 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAMAT VISHWA - 2
  • TypeResidential / Group Housing
  • Location
    • Vidya Nagar
    • Near Kankavli College
    • Kankavali
    • Kankavli
    • Sindhudurg
    • 416602
  • Pincode416602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900052902
  • ReraGenie IDRG-MH-06112

Builder

  • NamePranav Prakash Kamat
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion25 Dec 2026
  • Revised completionRevised to 25 Dec 2026 (originally 25 Dec 2025)
  • Buildings1 building record
  • Documents filed66 files

Current status

64%36 of 56 units booked
86.2%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kamat Vishwa - 2NA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Kamat Vishwa - 2: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes70%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,997 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025

Approvals and building plan

Sanctioning authorityKankavli Nagar Panchayat
Permissible FSI3444.69
Proposed, not sanctioned3,445 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGuruprasad Building, BKG Road, Kankavali
Estimated costRs 8.06 cr
Cost incurredRs 6.95 cr
Work done86.24%
BuildingWingEstimatedIncurred
Kamat Vishwa - 2NARs 8.06 crRs 6.95 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Sadanand Andhari
EngineerSandeep Shetye
Chartered AccountantChetan V Oswal
Chartered AccountantGaurav Phadnis
PartnerRole in project
Pranav Prakash Kamat-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20122518861Dec 2025 → Dec 2026

Reason as filed by the promoterOnly 45% work is left to complete project, then we are going to apply for Occupancy Certificate. For this we want extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q10-kamat vishwa2- Form1- arch certificate_compressed.pdf8 May 2026
Withdrawal Update Form 1File: Q9-kamat vishwa2- Form1- arch certificate.pdf8 May 2026
Withdrawal Update Form 1File: Q10-kamat vishwa2- Form1- arch certificate_compressed.pdf8 May 2026
Withdrawal Update Form 2File: Q10-KAMAT Vishwa 2- Form2- Engi certificate_compressed.pdf8 May 2026
Withdrawal Update Form 2File: Q9-KAMAT Vishwa 2- Form2- Engi certificate_compressed.pdf8 May 2026
Withdrawal Update Form 2File: Q10-KAMAT Vishwa 2- Form2- Engi certificate_compressed.pdf8 May 2026
Withdrawal Update Form 3File: Q10-KAMAT Vishwa 2- Form3- CA certificate_compressed.pdf8 May 2026
Withdrawal Update Form 3File: Q9-KAMAT Vishwa 2- Form3- CA certificate_compressed.pdf8 May 2026
Withdrawal Update Form 3File: Q10-KAMAT Vishwa 2- Form3- CA certificate_compressed.pdf8 May 2026
Withdrawal Update Form 1File: Q8-kamat vishwa2- Form1- arch certificate.pdf20 Dec 2025
Withdrawal Update Form 2File: Q8-KAMAT Vishwa 2- Form2- Engi certificate (1).pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3 CA.pdf20 Dec 2025
Withdrawal Update Form 1File: Q7-kamat vishwa2- Form1- arch certificate.pdf12 Oct 2025
Withdrawal Update Form 2File: Q7-KAMAT Vishwa 2- Form2- Engi certificate.pdf12 Oct 2025
Withdrawal Update Form 3File: Q7-KAMAT Vishwa 2- Form3- CA certificate_compressed.pdf12 Oct 2025
Form 1File: Q6-kamat vishwa2- Form1- arch certificate.pdf30 Jul 2025
Form 2File: Q6-KAMAT Vishwa 2- Form2- Engi certificate (1).pdf30 Jul 2025
Form 3File: K vishwa 2 FORM-3 MARCH25.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q6-kamat vishwa2- sold unsold inventories.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q5-kamat vishwa2- Form1- arch certificate_compressed.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q5-KAMAT Vishwa 2- Form3- CA certificate_compressed.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q5-KAMAT Vishwa 2- Form2- Engi certificate.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4-kamat vishwa2- Form1- arch certificate.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4-KAMAT Vishwa 2- Form3- CA certificate.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4-KAMAT Vishwa 2- Form2- Engi certificate.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3- Kamat Vishwa 2-Form 1- Arch certificate.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3-KAMAT Vishwa 2- Form2- Engi certificate .pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Q3- Kamat Vishwa 2- sold-unsold inventory.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3-KAMAT Vishwa 2- Form3- CA certificate.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ilovepdf_merged (2).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kamat Vishwa2 - engineer certificate mar24 (1)_compressed.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Kamat Vishwa-2 - Archi certificate_compressed.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Kamat Vishwa-2 - engi certificate.pdf20 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORIES_compressed.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 9-Commencement Certificate.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Document.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: kamat vishwa-2 declaration about commencement certificate .pdf29 Aug 2023
Other - TechnicalFile: kamat vishwa-2 declaration about commencement certificate .pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf10 Jul 2023
Building plan approvalFile: 8-Approved Plan.pdf5 Jul 2023
Copy of the legal title reportFile: 2-Legal Title Report.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: 4-Kamat Vishva-2- No encumbrances- finance.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: 4-No encumbrances legal.pdf5 Jul 2023
Details of encumbrances concerned to LegalFile: 4-Kamat Vishva-2- No encumbrances- finance.pdf5 Jul 2023
Details of encumbrances concerned to LegalFile: 4-No encumbrances legal.pdf5 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 8-Approved Plan.pdf5 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12-Architect certificate.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13-Enginner certificate.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: 18-Disclosure of sold unsold inventory.pdf5 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 23-Kamat Vishva-2- Bank declaration (1).pdf5 Jul 2023
Other - LegalFile: 34-NA order.pdf5 Jul 2023
Other - LegalFile: Agreement Part 1.pdf5 Jul 2023
Other - LegalFile: Agreement Part 2.pdf5 Jul 2023
Layout approvalFile: 17-Kamat Vishva-2 - gutbook nakasha (layout).pdf12 Jun 2023
PAN CardFile: 1-PAN - ADHAR.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 17-Kamat Vishva-2 - gutbook nakasha (layout).pdf12 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Document.pdf12 Jun 2023
Declaration about Commencement CertificateFile: 20-Kamat Vishva-2 - declaration of commencement.pdf12 Jun 2023
Declaration in FORM BFile: 12-Kamat Vishva-2 - Declaration in Form B_compressed.pdf12 Jun 2023
CERSAI detailsFile: 6-Kamat Vishva-2- self declaration CERSAI.pdf12 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22-Kamat Vishva-2- disclosure of interest in other REO.pdf12 Jun 2023
Proforma of Agreement for saleFile: 10-Kamat Vishva 2 - Model Agreement to sell.pdf12 Jun 2023
Proforma of Allotment letterFile: 8-Kamat Vishva-2 model of allotment letter_compressed.pdf12 Jun 2023
Deviation Report with respect to Allotment letterFile: 9-Kamat Vishva-2- deviation model allotment letter.pdf12 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 11-Kamat Vishva-2- deviation agreement of sale.pdf12 Jun 2023

How this compares with Sindhudurg

64%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 12 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep KAMAT VISHWA - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Kankavli College530+ in Sindhudurg

2 kmKAMAT VISHWA - 2Completed 18Lapsed / revoked 13Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Pranav Prakash Kamat

Pranav Prakash Kamat has 3 registrations on MahaRERA, including Kamat Gurukul and Kamat Highlight. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if KAMAT VISHWA - 2 is delayed beyond 25 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAMAT VISHWA - 2?

The registered promoter entity is Pranav Prakash Kamat, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAMAT VISHWA - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAMAT VISHWA - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAMAT VISHWA - 2?

The professionals named in the filing: Architect: Sanjay Sadanand Andhari; Engineer: Sandeep Shetye; Chartered Accountant: Chetan V Oswal; Chartered Accountant: Gaurav Phadnis. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAMAT VISHWA - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAMAT VISHWA - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAMAT VISHWA - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.