ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Kamalaraj Athens B and C

Registered No litigation declared Residential / Group Housing project

Kamalaraj Athens B and C

By KAMALRAJ ESTATE

RG-MH-17364 · RERA P52100028848 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
43 of 182Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Kamalaraj Athens B and C is a Residential / Group Housing project by KAMALRAJ ESTATE in Pune, Maharashtra, registered with MahaRERA as P52100028848 on 5 Apr 2021. Possession is promised by 30 Jun 2027. 139 of the 182 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameKamalaraj Athens B and C
  • TypeResidential / Group Housing
  • Location
    • Pink city road
    • Kaveri Nagar
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028848
  • ReraGenie IDRG-MH-17364

Builder

  • NameKAMALRAJ ESTATE
  • Entity typePartnership
  • PartnerMOHAN SHAHAJI THORAT
  • Other registrations8 more →
  • Completed3 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredApr 2021PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Current status

76%139 of 182 units booked
100.0%Work done, per cost certificate

Figures as on 22 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kamalaraj Athens B BuildingNA161456056
Kamalaraj Athens C BuildingNA16141260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Kamalaraj Athens B Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Kamalaraj Athens C Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Kamalaraj Athens B Building11
Kamalaraj Athens C Building11

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
Declared on23 Jun 2025
LandownerVillageDistrict
MR. AMIT TUKARAM SHEDGEWakadPune
MR ASHISH TUKARAM SHEDGEWakadPune
MR GIRISH DYANESHWAR SHEDAGEWakadPune
MR SATYVAN JAYRAM SHEDGEWakadPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Munciple Corporation
Permissible FSI17410.0
Proposed, not sanctioned6,612 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchI F branch Pimpri Pune
Estimated costRs 43.01 cr
Cost incurredRs 43.01 cr
Work done100.0%
BuildingWingEstimatedIncurred
Kamalaraj Athens B BuildingNARs 17.21 crRs 17.21 cr
Kamalaraj Athens C BuildingNARs 17.21 crRs 17.21 cr
-NARs 8.60 crRs 8.60 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
ArchitectMANOJ TATOOSKAR
EngineerG A Bhilare
EngineerVijay Mandalik
Chartered AccountantYogesh Gupta
Chartered AccountantAGH Associates
Chartered AccountantChandrashekhar Ramanlal Luniya
PartnerRole in project
KAMALRAJ ESTATE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Athens B and C - Form 1.pdf22 Jan 2026
Withdrawal Update Form 1File: Athens B and C - Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Athens B and C Form 2.pdf22 Jan 2026
Withdrawal Update Form 2File: Form-2-25-26-3rd Qtr Athens B and C.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 25 - Athens B and C.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 25 - Athens B and C.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Akshardham B and C.pdf29 Nov 2025
Form 5 (FY 2022-2023)File: Form 5 ATH - B and C.pdf11 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 Athens B and C.pdf11 Nov 2025
Withdrawal Update Form 1File: Athens B and C - Form 1.pdf8 Nov 2025
Withdrawal Update Form 2File: Athens B and C Form 2.pdf8 Nov 2025
Withdrawal Update Form 3File: Form - 3 Athens B u0026 C - 25-26 - Q2_11zon.pdf8 Nov 2025
Withdrawal Update Form 1File: Athens B and C - Form 1.pdf1 Nov 2025
Withdrawal Update Form 2File: Athens B and C Form 2.pdf1 Nov 2025
Withdrawal Update Form 3File: Form - 3 Athens B u0026 C - 25-26 - Q2_11zon.pdf1 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ath B C.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Athens B C.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Athens B C.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH B C - Dec-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kamalraj Form 1 - Athens B C.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Athens B C - Sept 24.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Athens B C.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5 Athens B C.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ath B C.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Athens B C.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ath B and C.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Athens B and C March 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Athens B and C Dec 23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Athens B and C Dec 23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Athens B and C.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 ATH - B and C.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Athens B C.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Athens.pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances Athens.pdf31 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrances Athens.pdf31 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Ath.pdf28 Sep 2022
Layout approvalFile: Layout.pdf20 May 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf20 May 2022
Details of encumbrancesFile: Encumbrances Athens.pdf12 Mar 2022
Proforma of Allotment letterFile: RERA ATS 13-03-2021 Final Draft Copy-compressed.pdf7 Mar 2022
Proforma of Allotment letterFile: RERA ATS 13-03-2021 Final Draft Copy-compressed.pdf7 Mar 2022
Proforma of Allotment letterFile: RERA ATS 13-03-2021 Final Draft Copy-compressed.pdf7 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Athens B and C Bldg.pdf1 Apr 2021
Copy of the legal title reportFile: Athens Revised Search Report.pdf24 Mar 2021
Copy of the legal title reportFile: Athens Search Report.pdf24 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Athens CC.pdf22 Mar 2021
Declaration in FORM BFile: Developer Form B.pdf15 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf15 Mar 2021
Proforma of Allotment letterFile: Wakad Rera Draft Agreement.pdf15 Mar 2021
Proforma of Allotment letterFile: KE-Athens Allotment Letter.pdf15 Mar 2021
Layout approvalFile: Wakad Sanction Layout.pdf8 Mar 2021
Layout approvalFile: Wakad Parking Layout.pdf8 Mar 2021
Building plan approvalFile: Wakad IOD.pdf8 Mar 2021
PAN CardFile: KAMALRAJ ESTATE PAN CARD.pdf8 Mar 2021
Details of encumbrancesFile: KE ATH B and C Bldg No encumnrances.pdf8 Mar 2021
Copy of Layout Approval (in case of layout)File: Wakad Sanction Layout.pdf8 Mar 2021
Copy of Layout Approval (in case of layout)File: Wakad Parking Layout.pdf8 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Wakad IOD.pdf8 Mar 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KAMALRAJ ATHENS AP52100054711KAVERI NAGAR, Pune112Feb 2024OngoingJun 2027Not due yet
KAMALRAJ DATTAVIHAR E AND HP52100031669BORHADEWADI, Pune152Nov 2021Certificate SignedJul 2025Not delivered

How this compares with Pune

76%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kamalaraj Athens B and C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kaveri Nagar13,700+ in Pune

2 kmKamalaraj Athens B and CCompleted 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: KAMALRAJ ESTATE

KAMALRAJ ESTATE has 9 registrations on MahaRERA, including Kamalraj Datta Vihar A Bldng and Kamalraj Datta Vihar D Building. Its filings disclose 9 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kamalaraj Athens B and C is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kamalaraj Athens B and C?

The registered promoter entity is KAMALRAJ ESTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kamalaraj Athens B and C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kamalaraj Athens B and C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kamalaraj Athens B and C?

The professionals named in the filing: Architect: Vikas Achalkar; Architect: MANOJ TATOOSKAR; Engineer: G A Bhilare; Engineer: Vijay Mandalik; Chartered Accountant: Yogesh Gupta; Chartered Accountant: AGH Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kamalaraj Athens B and C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kamalaraj Athens B and C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kamalaraj Athens B and C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.