Home / Browse projects / Pune, Maharashtra / KAMALRAJ DATTAVIHAR E AND H

Registration lapsed No litigation declared Residential / Group Housing project

KAMALRAJ DATTAVIHAR E AND H

By KAMALRAJ ESTATE

RG-MH-22598 · RERA P52100031669 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 5 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
25 of 224Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

KAMALRAJ DATTAVIHAR E AND H is a Residential / Group Housing project by KAMALRAJ ESTATE in Pune, Maharashtra, registered with MahaRERA as P52100031669 on 3 Nov 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 5 months from the original filing. 199 of the 224 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKAMALRAJ DATTAVIHAR E AND H
  • TypeResidential / Group Housing
  • Location
    • DEHU ROAD
    • BORHADEWADI
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031669
  • ReraGenie IDRG-MH-22598

Builder

  • NameKAMALRAJ ESTATE
  • Entity typePartnership
  • PartnerKAMLESH KANYALAL GANDHI
  • Other registrations8 more →
  • Completed3 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

10 months past promisethis monthRegisteredNov 2021First promiseJul 2025Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Nov 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Jul 2025)
  • Buildings2 building records
  • Documents filed46 files

Current status

89%199 of 224 units booked
99.0%Work done, per cost certificate

Figures as on 22 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAMALRAJ DATTAVIHAR ENA16141120112
KAMALRAJ DATTAVIHAR HNA16141120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

KAMALRAJ DATTAVIHAR E81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
KAMALRAJ DATTAVIHAR H81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes85%
Street LightingYes90%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110
BuildingClosed/CoveredTotal
KAMALRAJ DATTAVIHAR E5555
KAMALRAJ DATTAVIHAR H5555

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area28,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
YOGESH DATTATRAY BORATEMoshiPune
SANDEEP DATTATRAY BORATEMoshiPune
DEEPAK DATTATRAY BORATEMoshiPune
VIKAS DATTATRAY BORATEMoshiPune
RADHIKA DATTATRAY BORATEMoshiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Munciple Corporation
Permissible FSI20025.75
Proposed, not sanctioned20,026 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIF BRANCH PIMPRI PUNE
Estimated costRs 44.40 cr
Cost incurredRs 43.95 cr
Work done98.99%
BuildingWingEstimatedIncurred
KAMALRAJ DATTAVIHAR ENARs 19.80 crRs 19.58 cr
KAMALRAJ DATTAVIHAR HNARs 19.80 crRs 19.58 cr
-NARs 4.80 crRs 4.78 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKAS ACHALKAR
EngineerAMOL MANKAR
Chartered AccountantAGH AND ASSOCIATES
Chartered AccountantChandrashekhar Ramanlal Luniya
PartnerRole in project
KAMALRAJ ESTATE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08072501980Jul 2025 → Dec 2025

Reason as filed by the promoterDelay due to lack of labour availability, rainy season, some paper work related to project such as revised plan, 95% of work completed. Only 5% Work is balance, which will completed before 31st December 2025.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504461Vishram Sacchidanand KhatavakarKAMALRAJ ESTATE14/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Dattavihar E and H - Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form-2-25-26-3rd Qtr Dattavihar E and H.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 25 - Dattavihar E and H.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 DV E and H.pdf29 Nov 2025
Withdrawal Update Form 1File: Dattavihar E and H - Form 1.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2 - Dattavihar Eu0026H 25-26 - 2nd Qtr.pdf31 Oct 2025
Withdrawal Update Form 3File: Form - 3 DV- E u0026 H- 25-26 - Q2.pdf31 Oct 2025
Withdrawal Update Form 1File: Kamalraj Form 1 DV E and H.pdf21 Jul 2025
Withdrawal Update Form 2File: Dattavihar E and H Form 2.pdf21 Jul 2025
Withdrawal Update Form 3File: DV E and H.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DV E H.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dattavihar E H.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dattavihar E H.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DV- E H - Dec-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kamalraj Form 1 - Dattavihar E H.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dv E H - Sept 24.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 DV E H.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DV E H.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DV E and H.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DV E and H March 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DV E and H Dec 23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DV E and H Dec23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DV - E and H.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 DV - E and H.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect DV E H.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 22.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Dattavihar E and H.pdf8 Dec 2022
Layout approvalFile: Plan.pdf18 Nov 2022
Building plan approvalFile: Plan.pdf18 Nov 2022
Copy of Layout Approval (in case of layout)File: Plan.pdf18 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf18 Nov 2022
Layout approvalFile: E H Sanction plan layout.pdf25 Oct 2021
Building plan approvalFile: E H Sanction plan layout.pdf25 Oct 2021
PAN CardFile: KE Pancard.pdf25 Oct 2021
Copy of the legal title reportFile: E H SEARCH REPORT.pdf25 Oct 2021
Details of encumbrancesFile: E H Encumbrances.pdf25 Oct 2021
Copy of Layout Approval (in case of layout)File: E H Sanction plan layout.pdf25 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: E H Sanction plan layout.pdf25 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: E H commencement certificate.pdf25 Oct 2021
Declaration about Commencement CertificateFile: E H Declration for Commencement certificate.pdf25 Oct 2021
Declaration in FORM BFile: E H Developer Form B.pdf25 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E H Architect Form 1.pdf25 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E H Engineer Form 2.pdf25 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: E H Engineer Quality Certificate 2A.pdf25 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E H Building Form No 3.pdf25 Oct 2021
Proforma of Allotment letterFile: E H Rera ATS.pdf25 Oct 2021

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KAMALRAJ AKSHARDHAM B and C BUILDINGP52100056285CHOVISAWADI, Pune220May 2024OngoingDec 2028Not due yet
KAMALRAJ AKSHARDHAM A BUILDINGP52100079718CHOVISAWADI, Pune108Mar 2025OngoingDec 2028Not due yet
Kamalaraj Athens B and CP52100028848Kaveri Nagar, Pune182Apr 2021OngoingJun 2027Not due yet
KAMALRAJ ATHENS AP52100054711KAVERI NAGAR, Pune112Feb 2024OngoingJun 2027Not due yet
KAMALRAJ DATTAVIHAR CENTRALP52100025876Borade Wadi, Pune124Jul 2020CompletedSep 2025Registered original: Mar 2022Feb 2024
KAMALRAJ DATTAVIHAR G - F BUILDINGP52100025201BORADE WADI, Pune-Mar 2020CompletedDec 2023Dec 2023
Kamalraj Datta Vihar D BuildingP52100015707Borhadewadi ( Moshi ), Pune-Mar 2018CompletedJun 2022Late, Oct 2022
Kamalraj Datta Vihar A BldngP52100002971MOSHI, Pune-Aug 2017CompletedDec 2021Registered original: Dec 2019Late, Oct 2022

How this compares with Pune

89%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAMALRAJ DATTAVIHAR E AND H on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORHADEWADI13,700+ in Pune

2 kmKAMALRAJ DATTAVIHAR E ANCompleted 163Lapsed / revoked 118Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: KAMALRAJ ESTATE

KAMALRAJ ESTATE has 9 registrations on MahaRERA, including Kamalraj Datta Vihar A Bldng and Kamalraj Datta Vihar D Building. Its filings disclose 9 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KAMALRAJ DATTAVIHAR E AND H shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAMALRAJ DATTAVIHAR E AND H is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAMALRAJ DATTAVIHAR E AND H?

The registered promoter entity is KAMALRAJ ESTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAMALRAJ DATTAVIHAR E AND H?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAMALRAJ DATTAVIHAR E AND H?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAMALRAJ DATTAVIHAR E AND H?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAMALRAJ DATTAVIHAR E AND H?

The professionals named in the filing: Architect: VIKAS ACHALKAR; Engineer: AMOL MANKAR; Chartered Accountant: AGH AND ASSOCIATES; Chartered Accountant: Chandrashekhar Ramanlal Luniya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAMALRAJ DATTAVIHAR E AND H?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAMALRAJ DATTAVIHAR E AND H. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAMALRAJ DATTAVIHAR E AND H to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.