Home / Browse projects / Aurangabad, Maharashtra / Kalyani Park Phase II

Registered No litigation declared Residential / Group Housing project

Kalyani Park Phase II

By Bharat Janardhan Kale

RG-MH-55889 · RERA P51500029516 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 12 months from the original
10 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 98%
35 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Kalyani Park Phase II is a Residential / Group Housing project by Bharat Janardhan Kale in Aurangabad, Maharashtra, registered with MahaRERA as P51500029516 on 4 Jun 2021. Possession is promised by 1 Apr 2027. The completion date has moved by 12 months from the original filing. 13 of the 48 units on this registration are recorded sold or booked, and 10 of 33 construction stages are filed complete.

At a glance

Project

  • NameKalyani Park Phase II
  • TypeResidential / Group Housing
  • Location
    • Palshi Road
    • Pisadevi
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500029516
  • ReraGenie IDRG-MH-55889

Builder

  • NameBharat Janardhan Kale
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2021First promiseApr 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jun 2021
  • Promised completion1 Apr 2027
  • Revised completionRevised to 1 Apr 2027 (originally 1 Apr 2026)
  • Buildings3 building records
  • Documents filed100 files

Current status

27%13 of 48 units booked
55.2%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA20808
Building ANA20808
Building CDNA6032032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

Building B33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building CD0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes92%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered1
Open Space5
BuildingClosed/CoveredOpen SpaceTotal
Building B033
Building A022
Building CD101

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Permissible FSI3394.22
Proposed, not sanctioned3,394 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 79 Udyog Bhavan Cidco Aurangabad
Estimated costRs 655
Cost incurredRs 361
Work done55.16%
BuildingWingEstimatedIncurred
Building CDNARs 356-
Building BNARs 107Rs 170
Building ANARs 99Rs 99
-NARs 92Rs 92

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaurabh Mirkute
EngineerPradeep V Mote
Chartered AccountantCA Gopal S Malpani
Chartered AccountantARJUN APTE AND ASSOCIATES
Chartered AccountantNVM AND ASSOCIATES
PartnerRole in project
Bharat Janardhan Kale-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27052621113Apr 2026 → Apr 2027

Reason as filed by the promoterThe real estate market and slow response from purchasers resulting in unsold inventory in the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Apr 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Bharat kale_Form-2A.pdf30 May 2026
Withdrawal Update Form 1File: Form-1 Q-4.pdf28 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-4.pdf28 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-4.pdf28 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-1.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-2.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-2.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-2.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-2.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Q-3.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-2.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-2.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-2.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-2.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-2.pdf27 Apr 2026
Withdrawal Update Form 2File: Form-2 Q-3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Q-3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form-3 Q-3.pdf27 Apr 2026
Form 5 (FY 2024-2025)File: Form-5 Final.pdf3 Oct 2025
Form 1File: From-1 Q-2.pdf21 Aug 2025
Form 2File: From-2 Q-2.pdf21 Aug 2025
Form 3File: Form 3 Q2 Final.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vithala Builder Inventory.pdf21 Aug 2025
Form 1File: Form 1 Qtr 3.pdf21 Aug 2025
Form 2File: Form 2 Qtr 3.pdf21 Aug 2025
Form 3File: Form-3 Q-3.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vithala Builder Inventory.pdf21 Aug 2025
Form 1File: Form 1 QTR 4.pdf21 Aug 2025
Form 2File: Form 2 QTR 4.pdf21 Aug 2025
Form 3File: Form-3 Q-4.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vithala Builder Inventory.pdf21 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf21 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Vithala builders and developers.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-4.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-1.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 Q-2.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q-4.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Q-1.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Q-2.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q4 Final_.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-1 Final_.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 Final_.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Vitthala Builders.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-3 Form-1 Architech certificate.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-3 Form-2 Engineer certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-3 Form-3 CA certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-1 Form 3_compressed.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-2 FORM 3.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 Form 1.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2 Form 1.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 Form 2.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 Form 2.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance FY 22-23.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Q1.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q2.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q3.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q4.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q1.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q2.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q3.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q4.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q1.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q2.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q3.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q4.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q2_compressed.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q3_compressed.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q4_compressed.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q1_compressed.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Q1_compressed.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Q2_compressed.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Q3_compressed.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Q4_compressed.pdf16 Sep 2023

How this compares with Aurangabad

27%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 12 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Kalyani Park Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pisadevi1,400+ in Aurangabad

2 kmKalyani Park Phase IICompleted 3Lapsed / revoked 3Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: Bharat Janardhan Kale

Bharat Janardhan Kale has 1 registration on MahaRERA, including Kalyani Park Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Kalyani Park Phase II is delayed beyond 1 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalyani Park Phase II?

The registered promoter entity is Bharat Janardhan Kale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalyani Park Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalyani Park Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalyani Park Phase II?

The professionals named in the filing: Architect: Saurabh Mirkute; Engineer: Pradeep V Mote; Chartered Accountant: CA Gopal S Malpani; Chartered Accountant: ARJUN APTE AND ASSOCIATES; Chartered Accountant: NVM AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalyani Park Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalyani Park Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalyani Park Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.