Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpataru Vienta Tower A
Kalpataru Vienta Tower A
By Kalpataru Retail Ventures Private Limited
RG-MH-28793 · RERA P51800027059 · Last updated on MahaRERA portal: 29 Jul 2025
Source: official MahaRERA filing
Red flags
- Rs 300.00 crore secured on the land, in favour of IndusInd Bank Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kalpataru Vienta Tower A is a Residential / Group Housing project by Kalpataru Retail Ventures Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027059 on 13 Nov 2020. The registration is recorded completed; possession was promised by 30 Jun 2027. 195 of the 215 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameKalpataru Vienta Tower A
- TypeResidential / Group Housing
- Location
- Ashok Nagar Main Road
- Kandivali East
- Borivali
- Mumbai Suburban
- 400101
- Pincode400101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800027059
- ReraGenie IDRG-MH-28793
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Nov 2020
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 29 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 46 | 40 | 211 | 4 | 215 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 91%.
Tower A: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 82% |
| Sanitary Fittings within the flats / premises | 3% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 91% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 88% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 49% |
Progress on shared amenities18
As on 29 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 91% |
| Storm Water Drains | Yes | 83% |
| Landscaping & Tree Planting | Yes | 33% |
| Street Lighting | Yes | 60% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 96% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Fitness Centre, swimming Pool & Other recreation areas | Yes | 93% |
| 4 No. of Common Podium | Yes | 0% |
| 2 No. of Common Basement | Yes | 0% |
Parking filed416
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nandkumar V Jethe |
| Engineer | Mohan Parab |
| Engineer | Satish Datey |
| Engineer | Vikram Panchal |
| Chartered Accountant | C R Mohnot & Co ( CA Certificate-Form 3) |
| Chartered Accountant | Khimji Kunverji & Co (Statutory Auditor - Form 5) |
| Partner | Role in project |
|---|---|
| Kalpataru Retail Ventures Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Drawing First Page.pdf | 29 Jul 2025 |
| Occupational CertificateFile: Drawing 02-05.pdf | 29 Jul 2025 |
| Occupational CertificateFile: Drawing 06-09.pdf | 29 Jul 2025 |
| Occupational CertificateFile: Drawing 10-13.pdf | 29 Jul 2025 |
| Occupational CertificateFile: Drawing 14-17.pdf | 29 Jul 2025 |
| Form 1File: Vienta A AC.pdf | 19 Jul 2025 |
| Form 2File: Vienta A EC.pdf | 19 Jul 2025 |
| Form 3File: Vienta Tower A.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: KL Vienta A.pdf | 19 Jul 2025 |
| Occupational CertificateFile: OC_signed.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vienta Tower A.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vienta A.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vienta A AC.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vienta A EC.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Vienta A.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Vienta Tower A.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vienta A.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vienta A.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vienta Tower A.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Vienta A.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vienta A.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vienta A.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta A.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A 30-06-2024.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vienta A.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: K vienta A.pdf | 13 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VientaTower A.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Vienta A.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Vienta A.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: K Vienta Tower A.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Vineta tower A.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Vineta tower A.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: K Vienta Tower A.pdf | 20 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta Tower A.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Vienta Tower A.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Vienta Tower A.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 VIENTA A.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: K Vienta Tower A.pdf | 6 Sep 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: K Vienta A.pdf | 14 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Vienta Tower A.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Vienta Tower A.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Vienta Tower A.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Vienta A.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vienta A.pdf | 22 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: K Vienta T A.pdf | 14 Jun 2023 |
| Layout approvalFile: vienta 1st sheet approval _upload.pdf | 27 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: vienta 1st sheet approval _upload.pdf | 27 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2372115_FurtherCC_signed.pdf | 27 Apr 2023 |
| Declaration about Commencement CertificateFile: KalpataruVienta A.pdf | 27 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vienta A.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vienta A.pdf | 23 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vienta A Dec22.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Vienta Tower A.pdf | 30 Sep 2022 |
| CERSAI detailsFile: CERSAI Vienta.pdf | 8 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Vienta Tower A.pdf | 31 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vienta A.pdf | 21 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Sona CC.pdf | 18 Feb 2022 |
| Declaration about Commencement CertificateFile: Vienta A 3.pdf | 18 Feb 2022 |
| Layout approvalFile: 1ST PAGE SONA AMENDED.PDF | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 1ST PAGE SONA AMENDED.PDF | 26 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Sona CC.pdf | 26 Nov 2021 |
| Declaration about Commencement CertificateFile: Vienta A.pdf | 26 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vienta A.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_KRVPL_Vienta Tower A_F_compressed.pdf | 6 Oct 2021 |
| Layout approvalFile: sona .pdf | 4 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: sona .pdf | 4 Oct 2021 |
| Declaration about Commencement CertificateFile: vienta a.pdf | 4 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ll.pdf | 20 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A (Tower A).pdf | 7 May 2021 |
| PAN CardFile: PAN.pdf | 10 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -Kalpataru Vienta Tower A.pdf | 5 Nov 2020 |
| Copy of the legal title reportFile: Title Certificate.pdf | 4 Nov 2020 |
| Copy of the legal title reportFile: ADDENDUM-Vienta.pdf | 4 Nov 2020 |
| Declaration in FORM BFile: Form B- Kalpataru Vienta Tower A.pdf | 4 Nov 2020 |
| Proforma of Allotment letterFile: Letter of Intent - Tower A.pdf | 4 Nov 2020 |
| Building plan approvalFile: Sona-Zero FSI_IOD_signed.pdf | 3 Nov 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kalpataru Harmony | 253-1 and 247-6-1 Kalpataru Harmony Village Wakad Taluka Mulshi Pune | 479 | Completed | Sep 2016 | Late, Nov 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
Keep Kalpataru Vienta Tower A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kandivali East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 340 registered projects within 2 km.
Sheetal Uptown
SIDHESHWAR LIFESPACES PRIVATE LIMITED
ENSO SANZA
Sai Aastha Developers
SPRINGWOODS
PRATIK CONSTRUCTION
Godrej Nest
Shivam Megastructures Pvt Ltd
PATON TOWERS
PRAVIN VIRAM SATRA
Godrej Bliss
SHIVAM DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: Kalpataru Retail Ventures Private Limited
Kalpataru Retail Ventures Private Limited has 7 registrations on MahaRERA, including Kalpataru Exquisite - Wing 1 and Kalpataru Exquisite - Wing 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kalpataru Vienta Tower A is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kalpataru Vienta Tower A?
The registered promoter entity is Kalpataru Retail Ventures Private Limited, a company as per the filing. Its CIN U45202MH2000PTC129761 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kalpataru Vienta Tower A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kalpataru Vienta Tower A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kalpataru Vienta Tower A?
The professionals named in the filing: Architect: Nandkumar V Jethe; Engineer: Mohan Parab; Engineer: Satish Datey; Engineer: Vikram Panchal; Chartered Accountant: C R Mohnot & Co ( CA Certificate-Form 3); Chartered Accountant: Khimji Kunverji & Co (Statutory Auditor - Form 5). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kalpataru Vienta Tower A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback