Home / Browse projects / Kalpataru

Registered No litigation declared Others project

Kalpataru

By Akash Anilkumar Bumb

RG-MH-47037 · RERA P51600051777 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 20 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 20 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
20 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Kalpataru is a Others project by Akash Anilkumar Bumb in Saradwadi Road, 422103, registered with MahaRERA as P51600051777 on 27 Jun 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 20 months from the original filing. 14 of the 34 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameKalpataru
  • TypeOthers
  • Location
    • Plot No.2
    • Zopwadi
    • Saradwadi Road
    • 422103
  • Pincode422103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051777
  • ReraGenie IDRG-MH-47037

Builder

  • NameAkash Anilkumar Bumb
  • Entity typeIndividual
  • GSTIN27BPMPB1282H1ZY
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023First promiseApr 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 1 Apr 2025)
  • Buildings1 building record
  • Documents filed91 files

Current status

41%14 of 34 units booked
91.0%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KalpataruNA55241034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Kalpataru: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Open Space66

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,059 sq m
Land owned byNot the promoter
Named landowners6
LandownerVillageDistrict
Akash BumbNashikNashik
Niraj Pagar-Nashik
Saurabh Pagar-Nashik
Surekha GawaleNashikNashik
Alka Ramesh Pawar-Nashik
Lilabai Pawar-Nashik

Approvals and building plan

Permissible FSI1926.05
Proposed, not sanctioned1,922 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jyoti Sahakari, Patsanstha Ltd, Jyoti Circle, main road, Kopargaon - 423601
Estimated costRs 2.59 cr
Cost incurredRs 2.36 cr
Work done91.04%
BuildingWingEstimatedIncurred
KalpataruNARs 2.59 crRs 2.36 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnup Bumb
EngineerShubham Anil Bedmutha
Chartered AccountantShubham Ravindra Chhajed
Chartered AccountantJLM & CO.
Chartered AccountantBKCNS & CO.
PartnerRole in project
Akash Anilkumar Bumb-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29092517969Apr 2025 → Dec 2026

Reason as filed by the promoter1. Due to the operational issues, we are unable to complete the project within the estimated timeline mentioned dated 01.04.2025 submitted to MahaRERA. 2. We would want to make an application with MahaRERA for extension of completion of the project "Kalpataru" until 31st December 2026, under section 7(3) of the MahaRERA act. 3. As required by MahaRERA, we have obtained the consent from two-thirds of the allottees in the project for project extension and the same is attached separately for your perusal.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 May 2025

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form - 1 - Jun 2026.pdf16 Jul 2026
Withdrawal Update Form 2File: Form - 2 - Mar 2026.pdf16 Jul 2026
Withdrawal Update Form 3File: Form - 3 - June 2026.pdf16 Jul 2026
Withdrawal Update Form 1File: Form - 1 - Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form - 2 - Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form - 3 - Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 1File: Form - 1 - Sept 2025.pdf12 Mar 2026
Withdrawal Update Form 1File: Form - 1 - Dec 2025.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2 - Sept 25.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2 - Dec 25.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 - Sept 2025_compressed.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025_compressed.pdf12 Mar 2026
Form 2A (FY 2023-2024)File: Form 2A - 31.03.2024.pdf7 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A - 31.03.2025.pdf7 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 - Akash - 2023-24.pdf4 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Akash - 2024-25.pdf4 Oct 2025
Withdrawal Update Form 1File: Form - 1 - Mar 25.pdf29 Sep 2025
Withdrawal Update Form 2File: Form - 2 - Mar 25.pdf29 Sep 2025
Withdrawal Update Form 3File: Form - 3 - Mar 25_compressed.pdf29 Sep 2025
Form 1File: Form - 1 - June 2023.pdf27 Sep 2025
Form 2File: Form - 2 - Jun 23.pdf27 Sep 2025
Form 3File: Form 3 - Jun 23_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Jun 23.pdf27 Sep 2025
Form 1File: Form - 1 - Sept 2023.pdf27 Sep 2025
Form 2File: Form - 2 - Sept 23.pdf27 Sep 2025
Form 3File: Form 3 - Sept 23_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Sept 23.pdf27 Sep 2025
Form 3File: Form 3 - Dec 23_compressed.pdf27 Sep 2025
Form 2File: Form - 2 - Dec 23.pdf27 Sep 2025
Form 1File: Form - 1 - Dec 2023.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Dec 23.pdf27 Sep 2025
Form 1File: Form - 1 - Mar 25.pdf27 Sep 2025
Form 2File: Form - 2 - Mar 25.pdf27 Sep 2025
Form 3File: Form 3 - Mar 25_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Mar 25.pdf27 Sep 2025
Form 1File: Form - 1 - Dec 24.pdf27 Sep 2025
Form 2File: Form - 2 - Dec 24.pdf27 Sep 2025
Form 3File: Form 3 - Dec 24_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Invetory - Dec 24.pdf27 Sep 2025
Form 1File: Form - 1 - Sept 24.pdf27 Sep 2025
Form 2File: Form - 2 - Sept 24.pdf27 Sep 2025
Form 3File: Form 3 - Sept 24_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Sept 24.pdf27 Sep 2025
Form 1File: Form - 1 - Jun 24.pdf27 Sep 2025
Form 2File: Form - 2 - Jun 24.pdf27 Sep 2025
Form 3File: Form 3 - Jun 24_compressed.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Invetory - June 24.pdf27 Sep 2025
Form 1File: Form - 1 - Mar 24.pdf27 Sep 2025
Form 2File: Form - 2 - Mar 24.pdf27 Sep 2025
Form 3File: Form - 3 - Mar 24.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Mar 24.pdf27 Sep 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part_Occupancy_Certificate_Signed.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2024
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance.pdf8 Jun 2023
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance.pdf8 Jun 2023
CERSAI detailsFile: cersai declaration new.pdf8 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca attested1 (Compressed).pdf8 Jun 2023
PAN CardFile: PAN-1 - akash.pdf7 Jun 2023
PAN CardFile: 6 PAN Card - Nitraj.pdf7 Jun 2023
PAN CardFile: 5 PAN Card - Saurabh.pdf7 Jun 2023
PAN CardFile: 4 PAN Card- Surekha.pdf7 Jun 2023
PAN CardFile: PAN-2 - alka.pdf7 Jun 2023
PAN CardFile: PAN-3 - lilabai.pdf7 Jun 2023
Copy of the legal title reportFile: Legal Title Report (Compressed).pdf3 Jun 2023
Details of encumbrances concerned to FinanceFile: Declearation of finance encumberence.pdf3 Jun 2023
Details of encumbrances concerned to LegalFile: Declearation of finance encumberence.pdf3 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Seperate Account.pdf3 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf28 May 2023
Declaration in FORM BFile: Form B Alka Pawar.pdf15 May 2023
Declaration in FORM BFile: Form B Lilabai Pawar.pdf15 May 2023
Declaration in FORM BFile: Form B Niraj Pagar.pdf15 May 2023
Declaration in FORM BFile: Form B Saurabh Pagar.pdf15 May 2023
Declaration in FORM BFile: Form B Surekha Gawale.pdf15 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect4.pdf15 May 2023
Details of encumbrances concerned to FinanceFile: Detail of emburance.pdf13 May 2023
Details of encumbrances concerned to LegalFile: Detail of emburance.pdf13 May 2023
Declaration about Commencement CertificateFile: Declaration of commencement certificate.pdf13 May 2023

Keep Kalpataru on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Saradwadi Road

2 kmKalpataruCompleted 9Lapsed / revoked 12Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: Akash Anilkumar Bumb

Akash Anilkumar Bumb has 2 registrations on MahaRERA, including Kalpataru and SHREE SHANKAR ENCLAVE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record.

Frequently asked questions

What are my rights if Kalpataru is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru?

The registered promoter entity is Akash Anilkumar Bumb, an individual as per the filing. Its GSTIN 27BPMPB1282H1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru?

The professionals named in the filing: Architect: Anup Bumb; Engineer: Shubham Anil Bedmutha; Chartered Accountant: Shubham Ravindra Chhajed; Chartered Accountant: JLM & CO.; Chartered Accountant: BKCNS & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.