Red flags
- Litigation declared, 5 cases
- 48 complaints at MahaRERA
- Completion date moved by 30 months
- 3 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kalpataru Estate Building 8 is a Residential / Group Housing project by Kalpataru Construction (Pune) in Pune, Maharashtra, registered with MahaRERA as P52100017535 on 24 Aug 2018. The registration is recorded completed; possession was promised by 28 Jun 2025. The completion date has moved by 30 months from the original filing. 48 complaints are on record with the regulator.
At a glance
Project
- NameKalpataru Estate Building 8
- TypeResidential / Group Housing
- Location
- Jawlkar Nagar
- Pimple Gurav
- Pimpale Gurav
- Haveli
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017535
- ReraGenie IDRG-MH-35358
Builder
- NameKalpataru Construction (Pune)
- Entity typePartnership
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Aug 2018
- Promised completion28 Jun 2025
- Revised completionRevised to 28 Jun 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 8 ABC | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 91%.
Building 8 ABC: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 91% |
Progress on shared amenities15
As on 30 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 86% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed345
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Swapnil Potdar |
| Architect | VK:a Architects |
| Engineer | JW Consultants |
| Engineer | Sachin Hirukude |
| Chartered Accountant | C.R Mohnot & Co. |
| Partner | Role in project |
|---|---|
| Kalpataru Construction (Pune) | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, In view of the aforementioned subject, we hereby submit for your kind advice and guidance in the matter: Kalpataru Construction (Pune) (Promoter) is a promoter of the real estate projects namely Kalpataru Estate Building 8 (Project) (bearing Maha-RERA Registration No P51800000810). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2022. We may inform that, after the registration of the said Project, as a part of the Promoter’s business decision in the market conditions, we did not launch the project and also have not
Reason as filed by the promoterThe Promoter has largely completed the development of the Project, along with the completion of all slabs, installation of lifts & other services, external painting, etc. and we have submitted an application dated 21st December, 2023 to Pimpri-Chinchwad Municipal Corporation (PCMC) for obtainment occupation certificate (copy enclosed). However, the Authority has till date not issued the occupation certificate for the Project, the reason being, the Municipal Commissioner of PCMC has sought an opinion from the Principal Secretary, Urban Development Department, Maharashtra State, for issuing occu
Reason as filed by the promoterDear Sir, In view of the aforementioned subject, we hereby submit for your kind advice and guidance in the matter: Kalpataru Construction (Pune) (Promoter) is a promoter of the real estate projects namely Kalpataru Estate Building 8 (Project) (bearing Maha-RERA Registration No P52100017535). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2022. In the meantime, the Promoter has obtained six (6) months extension for RERA Completion date as per Section 6 of the RERA Act 2016 and accordingly the Project completion date is 30th D
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 7069/2017 | Bombay High Court | Pending |
| 8693/2017 | Bombay High Court | Pending |
| 8694/2017 | Bombay High Court | Pending |
| 8695/2017 | Bombay High Court | Pending |
| 1154/2020 | Civil Judge Senior Division Pune | Pending |
Complaints filed with MahaRERA48
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000259307 | PRASHANT MISAL | KALPATARU CONSTRUCTIONS(PUNE) | 21/08/2023 |
| CC005000000269321 | HITESH GODIYA | KALPATARU CONSTRUCTIONS (PUNE) | 23/08/2023 |
| CC005000000269340 | PUNITKUMAR PANDEY | KALPATARU CONSTRUCTIONS (PUNE) | 26/08/2023 |
| CC005000000269374 | AKASH MANDAGE | KALPATARU CONSTRUCTIONS (PUNE) | 31/08/2023 |
| CC005000000269389 | NAROTTAM SINGH | KALPATARU CONSTRUCTIONS (PUNE) | 01/09/2023 |
| CC005000000269404 | PRAKASH ABHYANKAR | KALPATARU CONSTRUCTIONS (PUNE) | 07/09/2023 |
| CC005000000279715 | MAHESH RAO PANDALA | KALPATARU CONSTRUCTIONS (PUNE) | 09/11/2023 |
| CC005000000279777 | ROHIT CHOURASIA | KALPATARU CONSTRUCTIONS (PUNE) | 01/12/2023 |
| CC005000000279802 | ASHISH RANDHIR | KALPATARU CONSTRUCTIONS (PUNE) | 04/12/2023 |
| CC005000000279789 | SURENDRA VASANT DEOLEKAR | KALPATARU CONSTRUCTIONS (PUNE) | 30/11/2023 |
| CC005000000279825 | LOKESHWAR BHAGWAT BARHATE | KALPATARU CONSTRUCTIONS (PUNE) | 07/12/2023 |
| CC005000000279801 | ADITHYA KUMAR SWAMINATHAN | KALPATARU CONSTRUCTIONS (PUNE) | 01/12/2023 |
| CC005000000279867 | SOUMI RAI | KALPATARU CONSTRUCTIONS (PUNE) | 14/12/2023 |
| CC005000000279862 | KARUN BEER SHARMA | KALPATARU CONSTRUCTIONS (PUNE) | 15/12/2023 |
| CC005000000279906 | MANISH THAKKAR | KALPATARU CONSTRUCTIONS (PUNE) | 21/12/2023 |
| CC005000000279890 | MANDAR PATHAK | KALPATARU CONSTRUCTIONS (PUNE) | 20/12/2023 |
| CC005000000279888 | AMAN GUPTA | KALPATARU CONSTRUCTIONS (PUNE) | 21/12/2023 |
| CC005000000279917 | JAYSHREE NAMDEO NIKAM | KALPATARU CONSTRUCTIONS (PUNE) | 23/12/2023 |
| CC005000000279912 | TUshar Kate | KALPATARU CONSTRUCTIONS (PUNE) | 22/02/2024 |
| CC005000000279956 | ABHISHEK DEEPAK KILLEDAR | KALPATARU CONSTRUCTIONS (PUNE) | 28/12/2023 |
| CC005000000289967 | SUNISH C PILLAI | KALPATARU CONSTRUCTIONS (PUNE) | 29/12/2023 |
| CC005000000290075 | ASHUTOSH RAMDULARI JADHAV | KALPATARU CONSTRUCTIONS (PUNE) | 11/01/2024 |
| CC005000000290098 | SHERIN JOHN | KALPATARU CONSTRUCTIONS (PUNE) | 15/01/2024 |
| CC005000000290101 | ROHAN GHORPADE | KALPATARU CONSTRUCTIONS (PUNE) | 16/01/2024 |
| CC005000000290110 | NIKHIL KIRTIKUMAR SHAH | KALPATARU CONSTRUCTIONS (PUNE) | 18/01/2024 |
| CC005000000290125 | MANSI ABHILASH PILLAI | KALPATARU CONSTRUCTIONS (PUNE) | 20/01/2024 |
| CC005000000310338 | MASAB AHMED KHALIL AHMED | KALPATARU CONSTRUCTIONS (PUNE) | 09/02/2024 |
| CC005000000310355 | SARITA UMESH TELI | KALPATARU CONSTRUCTIONS (PUNE) | 10/02/2024 |
| CC005000000310526 | PRANITA RAMDAS SHINDE | KALPATARU CONSTRUCTIONS (PUNE) | 03/03/2024 |
| CC005000000310540 | ABHIJEET RATNAKAR SALUNKE | KALPATARU CONSTRUCTIONS (PUNE) | 04/03/2024 |
| CC005000000340656 | KANTA RAMACHANDRA DABADE | KALPATARU CONSTRUCTIONS (PUNE) | 01/04/2024 |
| CC005000000320595 | PRIYANKA SANDIP PATIL | KALPATARU CONSTRUCTIONS (PUNE) | 14/03/2024 |
| CC005000000320623 | ABIJAR BHORI | KALPATARU CONSTRUCTIONS (PUNE) | 16/03/2024 |
| CC005000000320598 | Nirmalkumar Vasant Patel | Kalpataru Contructions (Pune) | 24/03/2024 |
| CC005000000320627 | RAHUL NARAYAN NARKHEDE | KALPATARU CONSTRUCTIONS (PUNE) | 17/03/2024 |
| CC005000000340707 | SONALI RAMRAJE SHINDE | KALPATARU CONSTRUCTIONS (PUNE) | 05/04/2024 |
| CC005000000340706 | SUDHIR SHRIKRISHNA MODE | KALPATARU CONSTRUCTIONS (PUNE) | 11/04/2024 |
| CC005000000340703 | ANSHU BHARGAVA | KALPATARU CONSTRUCTIONS (PUNE) | 03/04/2024 |
| CC005000000340702 | KISHOR DAMODAR PATIL | KALPATARU CONSTRUCTIONS (PUNE) | 03/04/2024 |
| CC005000000340745 | PRASANNA PRAKASH PATEL | KALPATARU CONSTRUCTIONS (PUNE) | 11/04/2024 |
| CC005000000370899 | SANTUK SAMBHAJIRAO WADJE | KALPATARU CONSTRUCTIONS (PUNE) | 22/06/2024 |
| CC005000000441122 | RAHUL AGRAWAL | KALPATARU CONSTRUCTIONS (PUNE) | 18/06/2024 |
| CC005000000461142 | KALAWATI JAIN | KALPATARU CONSTRUCTIONS (PUNE) | 25/06/2024 |
| CC005000000471335 | SHELWYN JOSEPH AUGUSTINE | KALPATARU CONSTRUCTIONS (PUNE) | 23/07/2024 |
| CC12500002 | Rijo George | Kalpataru Construction (Pune) | 01/01/2025 |
| CC12503435 | SOUMI RAI | Kalpataru Construction (Pune) | 26/09/2025 |
| CC12503480 | NIKHIL KIRTIKUMAR SHAH | Kalpataru Construction (Pune) | 29/09/2025 |
| CC12503809 | PRASANNA PRAKASH PATEL | Kalpataru Construction (Pune) | 31/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Aug 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Aug 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Estate 8.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf | 20 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Estate 8 Form 4.pdf | 20 Oct 2024 |
| Certificates of CA (Form 3)File: Kalpataru Estate_UPLOAD.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Estate 8.pdf | 11 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Estate 8.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8ABC completion.pdf | 5 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: K Estate 8.pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate bldg8abc.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate bldg8abc.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate 2019-2020.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Estate 2020-2021.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Estate 2021-2022.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Estate 2022-2023.pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: Kalpataru Estate 8ABC June24.pdf | 16 Jul 2024 |
| Declaration in FORM BFile: FORM B.pdf | 1 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K Estate.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Estate 8.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Estate 8.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Estate 8.pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: KC Pune Estate 8ABC Mar-2024.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Estate Dec-23.pdf | 23 Jan 2024 |
| Declaration in FORM BFile: Form B.pdf | 27 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf | 20 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: CA certificate Kalpataru Estate 8ABC Sep23.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Estate.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf | 12 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf | 26 Jul 2023 |
| Certificates of CA (Form 3)File: RERA Certificate Estate 8ABC.PDF | 26 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5)File: FORM 5_KCP_Estate_F.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_KCP_Estate_F.pdf | 24 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Kalpataru Estate Bldg 8.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cer Estate Bldg 8.pdf | 23 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate K Estate 8ABC.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (13).pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Estate Building 8.pdf | 30 Sep 2022 |
| Declaration about Commencement CertificateFile: KL Estate 8ABC.pdf | 7 Oct 2021 |
| Details of encumbrancesFile: EC Aug 21.pdf | 18 Aug 2021 |
| Details of encumbrancesFile: EC.pdf | 8 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_Estate.pdf | 9 Oct 2020 |
| Copy of the legal title reportFile: Title Certificate1932020.pdf | 20 Mar 2020 |
| Details of encumbrancesFile: EC1932020.pdf | 20 Mar 2020 |
| Proforma of Allotment letterFile: AFS Estate 8ABC.pdf | 20 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Kalpataru Estate.pdf | 30 Sep 2019 |
| OtherFile: Estate 8ABC - Carpet statment.pdf | 7 Aug 2018 |
| Building plan approvalFile: CC compressed.pdf | 6 Aug 2018 |
| Layout approvalFile: Estate 8ABC layout with parking bldg.pdf | 6 Aug 2018 |
| Copy of the legal title reportFile: Suppl Title Report Adv Yande.pdf | 6 Aug 2018 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 6 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: Estate 8ABC layout with parking bldg.pdf | 6 Aug 2018 |
| Building Plan Approval (IOD)File: CC compressed.pdf | 6 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf | 6 Aug 2018 |
| Declaration in FORM BFile: B Form - Estate.pdf | 6 Aug 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Kalpataru Estate Building -8.pdf | 6 Aug 2018 |
| Proforma of Allotment letterFile: LOI - Building 8 Estate.pdf | 6 Aug 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kalpataru Estate Building 9 | Kalpataru Estate Pimple Gurav Pune 411027 | 81 | Completed | Oct 2013 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
Keep Kalpataru Estate Building 8 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Gurav13,700+ in Pune
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: Kalpataru Construction (Pune)
Kalpataru Construction (Pune) has 1 registration on MahaRERA, including Kalpataru Estate Building 8. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kalpataru Estate Building 8 is delayed beyond 28 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kalpataru Estate Building 8?
The registered promoter entity is Kalpataru Construction (Pune), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kalpataru Estate Building 8?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kalpataru Estate Building 8?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kalpataru Estate Building 8?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kalpataru Estate Building 8?
The professionals named in the filing: Architect: Swapnil Potdar; Architect: VK:a Architects; Engineer: JW Consultants; Engineer: Sachin Hirukude; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kalpataru Estate Building 8?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback