Home / Browse projects / Pune, Maharashtra / Kalpataru Estate Building 8

Completed Litigation declared Residential / Group Housing project

Kalpataru Estate Building 8

By Kalpataru Construction (Pune)

RG-MH-35358 · RERA P52100017535 · Last updated on MahaRERA portal: 30 Oct 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 48 complaints at MahaRERA
  • Completion date moved by 30 months
  • 3 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 91%
48Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Kalpataru Estate Building 8 is a Residential / Group Housing project by Kalpataru Construction (Pune) in Pune, Maharashtra, registered with MahaRERA as P52100017535 on 24 Aug 2018. The registration is recorded completed; possession was promised by 28 Jun 2025. The completion date has moved by 30 months from the original filing. 48 complaints are on record with the regulator.

At a glance

Project

  • NameKalpataru Estate Building 8
  • TypeResidential / Group Housing
  • Location
    • Jawlkar Nagar
    • Pimple Gurav
    • Pimpale Gurav
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017535
  • ReraGenie IDRG-MH-35358

Builder

  • NameKalpataru Construction (Pune)
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2018First promiseDec 2022Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2018
  • Promised completion28 Jun 2025
  • Revised completionRevised to 28 Jun 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 8 ABCNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 91%.

Building 8 ABC: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.91%

Progress on shared amenities15

As on 30 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes86%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed345

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots345
Closed/Covered69
Open Space276

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,950 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7700.14
Proposed, not sanctioned7,552 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Maneckji Wadia Bldg Nanik Motwani Marg Fort Mumbai 400023

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Potdar
ArchitectVK:a Architects
EngineerJW Consultants
EngineerSachin Hirukude
Chartered AccountantC.R Mohnot & Co.
PartnerRole in project
Kalpataru Construction (Pune)-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006234Dec 2022 → Jun 2023

Reason as filed by the promoterDear Sir, In view of the aforementioned subject, we hereby submit for your kind advice and guidance in the matter: Kalpataru Construction (Pune) (Promoter) is a promoter of the real estate projects namely Kalpataru Estate Building 8 (Project) (bearing Maha-RERA Registration No P51800000810). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2022. We may inform that, after the registration of the said Project, as a part of the Promoter’s business decision in the market conditions, we did not launch the project and also have not

EXT52100024079Dec 2022 → Jun 2025

Reason as filed by the promoterThe Promoter has largely completed the development of the Project, along with the completion of all slabs, installation of lifts & other services, external painting, etc. and we have submitted an application dated 21st December, 2023 to Pimpri-Chinchwad Municipal Corporation (PCMC) for obtainment occupation certificate (copy enclosed). However, the Authority has till date not issued the occupation certificate for the Project, the reason being, the Municipal Commissioner of PCMC has sought an opinion from the Principal Secretary, Urban Development Department, Maharashtra State, for issuing occu

EXT52100018336Dec 2022 → Jun 2024

Reason as filed by the promoterDear Sir, In view of the aforementioned subject, we hereby submit for your kind advice and guidance in the matter: Kalpataru Construction (Pune) (Promoter) is a promoter of the real estate projects namely Kalpataru Estate Building 8 (Project) (bearing Maha-RERA Registration No P52100017535). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2022. In the meantime, the Promoter has obtained six (6) months extension for RERA Completion date as per Section 6 of the RERA Act 2016 and accordingly the Project completion date is 30th D

Litigation declared5

CaseCourtStatus
7069/2017Bombay High CourtPending
8693/2017Bombay High CourtPending
8694/2017Bombay High CourtPending
8695/2017Bombay High CourtPending
1154/2020Civil Judge Senior Division PunePending

Complaints filed with MahaRERA48

Case no.ComplainantRespondentFiled
CC005000000259307PRASHANT MISALKALPATARU CONSTRUCTIONS(PUNE)21/08/2023
CC005000000269321HITESH GODIYAKALPATARU CONSTRUCTIONS (PUNE)23/08/2023
CC005000000269340PUNITKUMAR PANDEYKALPATARU CONSTRUCTIONS (PUNE)26/08/2023
CC005000000269374AKASH MANDAGEKALPATARU CONSTRUCTIONS (PUNE)31/08/2023
CC005000000269389NAROTTAM SINGHKALPATARU CONSTRUCTIONS (PUNE)01/09/2023
CC005000000269404PRAKASH ABHYANKARKALPATARU CONSTRUCTIONS (PUNE)07/09/2023
CC005000000279715MAHESH RAO PANDALAKALPATARU CONSTRUCTIONS (PUNE)09/11/2023
CC005000000279777ROHIT CHOURASIAKALPATARU CONSTRUCTIONS (PUNE)01/12/2023
CC005000000279802ASHISH RANDHIRKALPATARU CONSTRUCTIONS (PUNE)04/12/2023
CC005000000279789SURENDRA VASANT DEOLEKARKALPATARU CONSTRUCTIONS (PUNE)30/11/2023
CC005000000279825LOKESHWAR BHAGWAT BARHATEKALPATARU CONSTRUCTIONS (PUNE)07/12/2023
CC005000000279801ADITHYA KUMAR SWAMINATHANKALPATARU CONSTRUCTIONS (PUNE)01/12/2023
CC005000000279867SOUMI RAIKALPATARU CONSTRUCTIONS (PUNE)14/12/2023
CC005000000279862KARUN BEER SHARMAKALPATARU CONSTRUCTIONS (PUNE)15/12/2023
CC005000000279906MANISH THAKKARKALPATARU CONSTRUCTIONS (PUNE)21/12/2023
CC005000000279890MANDAR PATHAKKALPATARU CONSTRUCTIONS (PUNE)20/12/2023
CC005000000279888AMAN GUPTAKALPATARU CONSTRUCTIONS (PUNE)21/12/2023
CC005000000279917JAYSHREE NAMDEO NIKAMKALPATARU CONSTRUCTIONS (PUNE)23/12/2023
CC005000000279912TUshar KateKALPATARU CONSTRUCTIONS (PUNE)22/02/2024
CC005000000279956ABHISHEK DEEPAK KILLEDARKALPATARU CONSTRUCTIONS (PUNE)28/12/2023
CC005000000289967SUNISH C PILLAIKALPATARU CONSTRUCTIONS (PUNE)29/12/2023
CC005000000290075ASHUTOSH RAMDULARI JADHAVKALPATARU CONSTRUCTIONS (PUNE)11/01/2024
CC005000000290098SHERIN JOHNKALPATARU CONSTRUCTIONS (PUNE)15/01/2024
CC005000000290101ROHAN GHORPADEKALPATARU CONSTRUCTIONS (PUNE)16/01/2024
CC005000000290110NIKHIL KIRTIKUMAR SHAHKALPATARU CONSTRUCTIONS (PUNE)18/01/2024
CC005000000290125MANSI ABHILASH PILLAIKALPATARU CONSTRUCTIONS (PUNE)20/01/2024
CC005000000310338MASAB AHMED KHALIL AHMEDKALPATARU CONSTRUCTIONS (PUNE)09/02/2024
CC005000000310355SARITA UMESH TELIKALPATARU CONSTRUCTIONS (PUNE)10/02/2024
CC005000000310526PRANITA RAMDAS SHINDEKALPATARU CONSTRUCTIONS (PUNE)03/03/2024
CC005000000310540ABHIJEET RATNAKAR SALUNKEKALPATARU CONSTRUCTIONS (PUNE)04/03/2024
CC005000000340656KANTA RAMACHANDRA DABADEKALPATARU CONSTRUCTIONS (PUNE)01/04/2024
CC005000000320595PRIYANKA SANDIP PATILKALPATARU CONSTRUCTIONS (PUNE)14/03/2024
CC005000000320623ABIJAR BHORIKALPATARU CONSTRUCTIONS (PUNE)16/03/2024
CC005000000320598Nirmalkumar Vasant PatelKalpataru Contructions (Pune)24/03/2024
CC005000000320627RAHUL NARAYAN NARKHEDEKALPATARU CONSTRUCTIONS (PUNE)17/03/2024
CC005000000340707SONALI RAMRAJE SHINDEKALPATARU CONSTRUCTIONS (PUNE)05/04/2024
CC005000000340706SUDHIR SHRIKRISHNA MODEKALPATARU CONSTRUCTIONS (PUNE)11/04/2024
CC005000000340703ANSHU BHARGAVAKALPATARU CONSTRUCTIONS (PUNE)03/04/2024
CC005000000340702KISHOR DAMODAR PATILKALPATARU CONSTRUCTIONS (PUNE)03/04/2024
CC005000000340745PRASANNA PRAKASH PATELKALPATARU CONSTRUCTIONS (PUNE)11/04/2024
CC005000000370899SANTUK SAMBHAJIRAO WADJEKALPATARU CONSTRUCTIONS (PUNE)22/06/2024
CC005000000441122RAHUL AGRAWALKALPATARU CONSTRUCTIONS (PUNE)18/06/2024
CC005000000461142KALAWATI JAINKALPATARU CONSTRUCTIONS (PUNE)25/06/2024
CC005000000471335SHELWYN JOSEPH AUGUSTINEKALPATARU CONSTRUCTIONS (PUNE)23/07/2024
CC12500002Rijo GeorgeKalpataru Construction (Pune)01/01/2025
CC12503435SOUMI RAIKalpataru Construction (Pune)26/09/2025
CC12503480NIKHIL KIRTIKUMAR SHAHKalpataru Construction (Pune)29/09/2025
CC12503809PRASANNA PRAKASH PATELKalpataru Construction (Pune)31/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Aug 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Estate 8.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf20 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Estate 8 Form 4.pdf20 Oct 2024
Certificates of CA (Form 3)File: Kalpataru Estate_UPLOAD.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Estate 8.pdf11 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Estate 8.pdf9 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8ABC completion.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: K Estate 8.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate bldg8abc.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate bldg8abc.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Estate 2019-2020.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Estate 2020-2021.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Estate 2021-2022.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Estate 2022-2023.pdf16 Jul 2024
Certificates of CA (Form 3)File: Kalpataru Estate 8ABC June24.pdf16 Jul 2024
Declaration in FORM BFile: FORM B.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K Estate.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Estate 8.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Estate 8.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Estate 8.pdf19 Apr 2024
Certificates of CA (Form 3)File: KC Pune Estate 8ABC Mar-2024.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf23 Jan 2024
Certificates of CA (Form 3)File: Estate Dec-23.pdf23 Jan 2024
Declaration in FORM BFile: Form B.pdf27 Dec 2023
Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf19 Oct 2023
Certificates of CA (Form 3)File: CA certificate Kalpataru Estate 8ABC Sep23.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Estate.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: K Estate 8 ABC.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Estate 8.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estate 8.pdf26 Jul 2023
Certificates of CA (Form 3)File: RERA Certificate Estate 8ABC.PDF26 Jul 2023
Annual Audit Report of Statutory CA (Form 5)File: FORM 5_KCP_Estate_F.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_KCP_Estate_F.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Kalpataru Estate Bldg 8.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cer Estate Bldg 8.pdf23 Feb 2023
Certificates of CA (Form 3)File: CA Certificate K Estate 8ABC.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (13).pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Estate Building 8.pdf30 Sep 2022
Declaration about Commencement CertificateFile: KL Estate 8ABC.pdf7 Oct 2021
Details of encumbrancesFile: EC Aug 21.pdf18 Aug 2021
Details of encumbrancesFile: EC.pdf8 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_Estate.pdf9 Oct 2020
Copy of the legal title reportFile: Title Certificate1932020.pdf20 Mar 2020
Details of encumbrancesFile: EC1932020.pdf20 Mar 2020
Proforma of Allotment letterFile: AFS Estate 8ABC.pdf20 Mar 2020
Annual Audit Report of Statutory CA (Form 5)File: Kalpataru Estate.pdf30 Sep 2019
OtherFile: Estate 8ABC - Carpet statment.pdf7 Aug 2018
Building plan approvalFile: CC compressed.pdf6 Aug 2018
Layout approvalFile: Estate 8ABC layout with parking bldg.pdf6 Aug 2018
Copy of the legal title reportFile: Suppl Title Report Adv Yande.pdf6 Aug 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf6 Aug 2018
Copy of Layout Approval (in case of layout)File: Estate 8ABC layout with parking bldg.pdf6 Aug 2018
Building Plan Approval (IOD)File: CC compressed.pdf6 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf6 Aug 2018
Declaration in FORM BFile: B Form - Estate.pdf6 Aug 2018
Certificates of CA (Form 3)File: CA Certificate - Kalpataru Estate Building -8.pdf6 Aug 2018
Proforma of Allotment letterFile: LOI - Building 8 Estate.pdf6 Aug 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kalpataru Estate Building 9Kalpataru Estate Pimple Gurav Pune 41102781CompletedOct 2013Late, Dec 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 30 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Estate Building 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Gurav13,700+ in Pune

2 kmKalpataru Estate BuildinCompleted 26Lapsed / revoked 18Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Kalpataru Construction (Pune)

Kalpataru Construction (Pune) has 1 registration on MahaRERA, including Kalpataru Estate Building 8. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kalpataru Estate Building 8 is delayed beyond 28 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Estate Building 8?

The registered promoter entity is Kalpataru Construction (Pune), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Estate Building 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalpataru Estate Building 8?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalpataru Estate Building 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Estate Building 8?

The professionals named in the filing: Architect: Swapnil Potdar; Architect: VK:a Architects; Engineer: JW Consultants; Engineer: Sachin Hirukude; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Estate Building 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Estate Building 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Estate Building 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.