Home / Browse projects / Aurangabad, Maharashtra / KALE ESTATE - VASANT VIHAR
KALE ESTATE - VASANT VIHAR
RG-MH-95128 · RERA P51500027894 · Last updated on MahaRERA portal: 13 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KALE ESTATE - VASANT VIHAR is a Residential / Group Housing project by R.R REALITIES in Aurangabad, Maharashtra, registered with MahaRERA as P51500027894 on 14 Jan 2021. Possession was promised by 15 Jun 2026 and is now 4 months past that date.
At a glance
Project
- NameKALE ESTATE - VASANT VIHAR
- TypeResidential / Group Housing
- Location
- GUT NO 35
- 36
- ETHKHEDA
- Aurangabad (M Corp.)
- Aurangabad
- 431005
- Pincode431005
- RERA no.P51500027894
- ReraGenie IDRG-MH-95128
Builder
- NameR.R REALITIES
- Entity typePartnership
- PartnersANKIT RAMESHWAR BHARUKA, VIJAY RAMDAS SAKKARVAR
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jan 2021
- Promised completion15 Jun 2026
- Revised completionNone
- Buildings4 building records
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A AND B | NA | 8 | 0 | 0 | 0 | 0 |
| ROW HOUSE R1 TO R14 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE R15 TO R26 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE R27 TO R37 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 13 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 50%.
WING A AND B5%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE R1 TO R140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE R15 TO R260%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE R27 TO R379%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A AND B | 28 | 28 |
| ROW HOUSE R1 TO R14 | 14 | 14 |
| ROW HOUSE R15 TO R26 | 12 | 12 |
| ROW HOUSE R27 TO R37 | 11 | 11 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prakash Baburao Kale | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Promod Narale |
| Engineer | Mr Prashant Kala |
| Chartered Accountant | CA Shrikant Thorat |
| Partner | Role in project |
|---|---|
| R.R REALITIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Mar 2025
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-05 Kale estate 23-24.pdf | 13 Jun 2025 |
| Other - TechnicalFile: form-04 kale estate.pdf | 16 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Vasant Form 1 Mar 25.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: 6 Vasant Sold Mar 25.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Vasant Form 3 Mar 25.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Vasant Form 2 Mar 25.pdf | 3 May 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Association.pdf | 2 May 2025 |
| Status of ConveyanceFile: DOD 2973 RR REALITIES_compressed_removed_compressed_compressed.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 23.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 March 23.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 June 23.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sep 23.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 23.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 March 24.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 June 24.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sep 24.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 24.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 22.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration March 24.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Dec 24.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Sep 24.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration June 24.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Dec 23.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Sep 23.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration June 23.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration March 23.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Dec 22.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec 22.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March 23.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 June 23.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sep 23.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec 23.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March 24.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 June 24.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sep 24.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec 24.pdf | 25 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VV Completion Certificate_compressed.pdf | 25 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf | 25 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A 22-23.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -05 ( AR) FY-2022-2023.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R R Realities Form 1_compressed.pdf | 20 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R R Realities Form 2_compressed.pdf | 20 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: R R Realities Form 2A_compressed.pdf | 20 May 2022 |
| Disclosure of sold/ booked inventoryFile: Vasant Vihar_compressed.pdf | 13 Oct 2021 |
| Layout approvalFile: Layout Compressed-compressed-1.pdf | 4 Mar 2021 |
| Layout approvalFile: Layout Compressed-compressed-2.pdf | 4 Mar 2021 |
| Layout approvalFile: Layout Compressed-compressed-3.pdf | 4 Mar 2021 |
| Layout approvalFile: Layout Compressed-compressed-4.pdf | 4 Mar 2021 |
| Layout approvalFile: Layout Compressed-compressed-5.pdf | 4 Mar 2021 |
| Layout approvalFile: Layout Compressed-compressed-6.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-1.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-2.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-3.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-4.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-5.pdf | 4 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Compressed-compressed-6.pdf | 4 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 4 Mar 2021 |
| Proforma of Allotment letterFile: Allotment_letter.pdf | 7 Jan 2021 |
| Proforma of Allotment letterFile: ATS_format_RERA.pdf | 7 Jan 2021 |
| Building plan approvalFile: Plan Layout Compressed.pdf | 24 Dec 2020 |
| Layout approvalFile: Plan Layout Compressed.pdf | 24 Dec 2020 |
| PAN CardFile: RR Pan-converted.pdf | 24 Dec 2020 |
| Details of encumbrancesFile: NOC.pdf | 24 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: Plan Layout Compressed.pdf | 24 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Layout Compressed.pdf | 24 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 24 Dec 2020 |
| Declaration in FORM BFile: form_B_compressed.pdf | 24 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Regulations__Architects_Certificate__compressed.pdf | 24 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Uplaod.pdf | 24 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 Dec 2020 |
| Copy of the legal title reportFile: Title Report compressed.pdf | 19 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KALE ESTATE - VASANT VIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ETHKHEDA1,400+ in Aurangabad
One World Phase I
SIMAR PRIDE VENTURES LLP
The Solitairee Phase I
Dizzi Land Farms Private Limited
Neo Orbit
Piyush Infratech Pvt.Ltd.
180 and 51 Greens
A.M.PATEL INFRA PVT LTD
MILLENNIUM BUSINESS CENTER
MILLENNIUMPRO NEST LLP
The Solitairee Phase II
Dizzi Land Farms Private Limited
See every Aurangabad project, with the district possession charts
Builder: R.R REALITIES
R.R REALITIES has 2 registrations on MahaRERA, including KALE ESTATE - VASANT VIHAR and VASANT VIHAR MHADA BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that KALE ESTATE - VASANT VIHAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KALE ESTATE - VASANT VIHAR is delayed beyond 15 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KALE ESTATE - VASANT VIHAR?
The registered promoter entity is R.R REALITIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KALE ESTATE - VASANT VIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KALE ESTATE - VASANT VIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KALE ESTATE - VASANT VIHAR?
The professionals named in the filing: Architect: Mr Promod Narale; Engineer: Mr Prashant Kala; Chartered Accountant: CA Shrikant Thorat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KALE ESTATE - VASANT VIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback