Home / Browse projects / Mumbai Suburban, Maharashtra / Kalaniketan

Registration lapsed Litigation declared Residential / Group Housing project

Kalaniketan

By SiroyaFM Constructions Pvt Ltd

RG-MH-82707 · RERA P51800009790 · Last updated on MahaRERA portal: 8 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 93 months past the filed date
  • Litigation declared, 9 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2019Possession promised93 months past this date
7 of 11Construction stages donefurthest along: Internal walls, 95%
2Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Kalaniketan is a Residential / Group Housing project by SiroyaFM Constructions Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009790 on 22 Aug 2017. Possession was promised by 31 Jan 2019 and is now 93 months past that date. The completion date has moved by 10 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKalaniketan
  • TypeResidential / Group Housing
  • Location
    • NA
    • Kurla
    • Mumbai Suburban
    • 400062
  • Pincode400062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009790
  • ReraGenie IDRG-MH-82707

Builder

  • NameSiroyaFM Constructions Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2005PTC152161
  • Managing DirectorFatesh Kishanchand Mirchandani
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

93 months past promisethis monthRegisteredAug 2017First promiseMar 2018Revised toJan 2019

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion31 Jan 2019
  • Revised completionRevised to 31 Jan 2019 (originally 31 Mar 2018)
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KalaniketanNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Kalaniketan: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities16

As on 8 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
GymnasiumYes40%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,032 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2024
LandownerVillageDistrict
KalaniketanAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNCIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI2067.0
Proposed, not sanctioned2,067 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Shrikant Bldg Next to RK Studio Chembur Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhijit Mehta
EngineerUD Chande
Chartered AccountantDIMPLE JAIN
PartnerRole in project
SiroyaFM Constructions Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000250Mar 2018 → Jan 2019

Reason as filed by the promoterThe Government of Maharashtra has vide notification no. TPB 4316/CR-237/2016/UD-11 permitted for additional FSI known as Road TDR that can be consumed on plot of land abutting Road width of 9 mtrs and above. The present project has access from road having width above 9 mtrs. and therefore, the benefits of road TDR are available to the Developer which the Developer proposes to avail on the subject plot for which the developer is in process of negotiation with the owner of the plot and the flat purchasers for their positive consent which would take some time and thereafter the benefits of the TD

Litigation declared9

CaseCourtStatus
442/2016High CourtPre admission
675/2016High CourtOngoing
3104/2016High CourtPre admission
412/2016High CourtPre admission
1338/2016High CourtPre admission
1296/2017High CourtPre admission
1016/2016/2016High CourtPre admission
1127/2017High CourtPre admission
Commercial Notice of Motion L no 1031 of 2019 IN Commercial Suit L no 339 of 2019/2019Bombay High CourtDisposed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000000729ATUL GUPTAsiroyaFMconstructionsPvtltd20/09/2017
CC006000000000489Santosh GuptaFatesh Mirchandani12/09/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM 1_JUNE 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 FORM 1_SEP 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 FORM 1_DEC 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 FORM 1_MARCH 25_ KALNIKETAN.pdf8 Jul 2025
Certificates of CA (Form 3)File: 15 FORM 3_DEC 24_ KALNIKETAN_compressed.pdf8 Jul 2025
Certificates of CA (Form 3)File: 16 FORM 3_MARCH 25_ KALNIKETAN_compressed.pdf8 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 FORM 2_JUNE 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 FORM 2_SEP 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 FORM 2_DEC 24_ KALNIKETAN.pdf8 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 FORM 2_MARCH 25_ KALNIKETAN.pdf8 Jul 2025
Disclosure of sold/ booked inventoryFile: 9 Disclosure of sold booked inventory .pdf8 Jul 2025
Disclosure of sold/ booked inventoryFile: 10 Disclosure of Sold booked Inventory.pdf8 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 Disclosure of sold inventory.pdf8 Jul 2025
Disclosure of sold/ booked inventoryFile: 12 Ultra Safe Services - Disclosure of Sold Booked Inventory.pdf8 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf2 Jul 2025
Details of encumbrances concerned to FinanceFile: finance.pdf4 Feb 2025
Details of encumbrances concerned to LegalFile: finance.pdf4 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: INDI.pdf4 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: sec unse.pdf4 Feb 2025
Declaration in FORM BFile: Form B Notarized_compressed (1).pdf27 Nov 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf27 Nov 2024
CERSAI detailsFile: CERSAI.pdf27 Nov 2024
Building plan approvalFile: plans_compressed-1.pdf19 Nov 2024
Building plan approvalFile: plans_compressed-2.pdf19 Nov 2024
Building plan approvalFile: plans_compressed-3.pdf19 Nov 2024
Building plan approvalFile: plans_compressed-4.pdf19 Nov 2024
Building Plan Approval (IOD)File: plans_compressed-2.pdf19 Nov 2024
Building Plan Approval (IOD)File: plans_compressed-4.pdf19 Nov 2024
Building Plan Approval (IOD)File: plans_compressed-3.pdf19 Nov 2024
Building Plan Approval (IOD)File: plans_compressed-1.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf16 Nov 2024
Certificates of CA (Form 3)File: 5 Certificates of CA (Form 3).pdf16 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 Disclosure of sold_ booked inventory (1).pdf16 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf16 Nov 2024
PAN CardFile: 4 PAN CARD.pdf12 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM_ JUNE 24.pdf15 Oct 2024
Certificates of CA (Form 3)File: 3 FORM 3_ JUNE 24.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 FORM 2_JUNE 24.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf8 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM 1.pdf6 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD.pdf6 Apr 2024
Certificates of CA (Form 3)File: 3 FORM 3.pdf6 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory.pdf20 Oct 2023
Certificates of CA (Form 3)File: Form-3_compressed.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2018.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2019.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2020.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2021.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2022.pdf25 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023.pdf25 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kalaniketan Form 2 070723.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE CERTIFICATE NO-1-FY-2019-20.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE-FY-ENDING-2020-21.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE-3-FY-2021-22.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE- FY ENDING 20222-23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE NO-5-JUNE-2023.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: Kalaniketan disclosure of sold inventory.pdf7 Jul 2023
Certificates of CA (Form 3)File: Form 3 Submission.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: QUALITY ASSURANCE CERTIFICATE NO-1-FY-2019-20.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf7 Jul 2023
Annual Audit Report of Statutory CA (Form 5)File: Kalaniketan Form 5.pdf21 Sep 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: POWER OF ATTORNEY-ilovepdf-compressed.pdf24 Apr 2018
Details of encumbrancesFile: Kalaniketan encumbrances.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kalaniketan.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - Kalaniketan.pdf31 Jul 2017
Certificates of CA (Form 3)File: New Doc 2017-07-31.pdf31 Jul 2017
Layout approvalFile: Kalaniketan Bmc plan 1compressed.pdf30 Jul 2017
Building plan approvalFile: IOD kalaniketan compressed.pdf30 Jul 2017
PAN CardFile: sfm pan card PDF.pdf30 Jul 2017
Copy of the legal title reportFile: Tital certificate kalaniketancompressed.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Kalaniketan Bmc plan 1compressed.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD kalaniketan compressed.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC kalaniketan compressed.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shiv SadanGoregaon W Mumbai29CompletedOct 2010Oct 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 10 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalaniketan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmKalaniketanCompleted 118Lapsed / revoked 77Other 119Dot size: filed unitsN

Filed coordinates, straight-line distance. 314 registered projects within 2 km.

Builder: SiroyaFM Constructions Pvt Ltd

SiroyaFM Constructions Pvt Ltd has 4 registrations on MahaRERA, including Orchid and New Jagdamba. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Kalaniketan shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kalaniketan is delayed beyond 31 Jan 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalaniketan?

The registered promoter entity is SiroyaFM Constructions Pvt Ltd, a company as per the filing. Its CIN U45200MH2005PTC152161 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalaniketan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalaniketan?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalaniketan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalaniketan?

The professionals named in the filing: Architect: Abhijit Mehta; Engineer: UD Chande; Chartered Accountant: DIMPLE JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalaniketan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalaniketan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalaniketan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.