Home / Browse projects / Pune, Maharashtra / Kairosa Cluster A

Registration lapsed Litigation declared Residential / Group Housing project

Kairosa Cluster A

By Benchmarrk Realty LLP

RG-MH-13041 · RERA P52100021921 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 92%
83 of 244Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Kairosa Cluster A is a Residential / Group Housing project by Benchmarrk Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100021921 on 8 Aug 2019. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 161 of the 244 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKairosa Cluster A
  • TypeResidential / Group Housing
  • Location
    • Kate Wasti
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021921
  • ReraGenie IDRG-MH-13041

Builder

  • NameBenchmarrk Realty LLP
  • Entity typePartnership
  • CINU68100PN2025PTC237318
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBenchmarrk Promoters and Builders Pvt Ltd, Akash Rajendra Pharande, Anil Jayram Pharande, Ramesh Jayram Pharande, Ramesh Jayram Pharande, Anil Jayram Pharande, Akash Rajendra Pharande, Benchmarrk Promoters and Builders Pvt Ltd, Ramesh Jayram Pharande, Anil Jayram Pharande, Akash Rajendra Pharande, Benchmarrk Promoters and Builders Pvt Ltd
  • Other registrations10 more →
  • Completed2 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

16 months past promisethis monthRegisteredAug 2019First promiseJun 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Aug 2019
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
  • Buildings2 building records
  • Documents filed38 files

Current status

66%161 of 244 units booked

Figures as on 24 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA18141360136
DNA18141080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 92%.

C86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
D83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities16

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes30%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes100%
Swimming PoolYes0%

Parking filed254

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots254
Closed/Covered144
Open Space110
BuildingClosed/CoveredOpen SpaceTotal
C7955134
D6555120

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,440 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Farheez Eruch AgaChinchwadPune
Monaz Farheez AgaChinchwadPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI10689.19
Proposed, not sanctioned10,689 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNigdi, Pune

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK architecture
EngineerRAHUL SURESH DHUMAL
Chartered AccountantANJK & CO LLP
Chartered AccountantG N Mantri & Associates
Chartered AccountantFAA & ASSOCIATES LLP
Chartered AccountantR. Devendra Kumar & Associates
PartnerRole in project
BENCHMARRK REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019896Jun 2024 → Jun 2025

Reason as filed by the promoterCOVID-19 has made significant impact on various industries, including construction, it is difficult in finding skilled labor for construction project. The status of Construction till date is 85%, only 15% work is left. We will finish the remaining task within 3 months. Also we have promptly updated the project Quarterly & Annually with necessary information/documents.

Litigation declared1

CaseCourtStatus
1939/2008/2008Civil Judge Senior Division PuneHearing on Interim Application

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602311Roma Raghav ShanbhagBenchmarrk Realty LLP19/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KAIROSA CLUSTER A_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: KAIROSA CLUSTER A_SOLD-UNSOLD_DECEMBER-24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KAIROSA CLUSTER-A_ARCHITECT CERTIFICATE_SEP-24_ FORM-1.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KAIROSA CLUSTER A_CA CERTIFICATE_FORM-5_2023-24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KAIROSA CLUSTER A_ARCHITECT CERTIFICATE_JUNE-24_ FORM-1.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KAIROSA CLUSTER A_ENGINEER CERTIFICATE_JUNE-24_FORM-2.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: KAIROSA CLUSTER A_SOLD UN-SOLD_JUNE-24.pdf24 Jul 2024
Declaration in FORM BFile: FORM B KAIROSA CLUSTER A BRLLP.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KAIROSA_FORM-1_compressed.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: KAIROSA_SOLD UNSOLD.pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 9) COMMENCEMENT CERTIFICATE.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KAIROSA_FORM-2A_compressed.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_KAIROSA CLUSTER A_ARCHITECT CERTIFICATE_MAR-24_compressed.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4_KAIROSA CLUSTER A_QUALITY CERTIFICATE_FORM-2A_2023-24_compressed.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 10_KAIROSA CLUSTER A_P52100021921_2022-23_compressed.pdf13 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 9_KAIROSA CLUSTER A_P52100021921_2020-21.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 8_KAIROSA CLUSTER A_P52100021921_2019-20.pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KAIROSA CLUSTER A.pdf15 Oct 2022
Building plan approvalFile: IOD.pdf30 Jul 2019
Layout approvalFile: 1-LAYOUT PLAN.pdf30 Jul 2019
Copy of the legal title reportFile: TITLE SEARCH.pdf30 Jul 2019
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf30 Jul 2019
Copy of Layout Approval (in case of layout)File: 1-LAYOUT PLAN.pdf30 Jul 2019
Building Plan Approval (IOD)File: IOD.pdf30 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf30 Jul 2019
Declaration in FORM BFile: FORM B BRLLP.pdf30 Jul 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf30 Jul 2019
Proforma of Allotment letterFile: AGREEMENT AND ALLOTMENT LETTER.pdf30 Jul 2019
OtherFile: CONSENT LETTER.pdf30 Jul 2019
OtherFile: 5-13.pdf30 Jul 2019
OtherFile: 6-13.pdf30 Jul 2019
OtherFile: 7-13.pdf30 Jul 2019
OtherFile: 8-13.pdf30 Jul 2019
OtherFile: 9-13.pdf30 Jul 2019
OtherFile: 10-13.pdf30 Jul 2019
OtherFile: 11-13.pdf30 Jul 2019
OtherFile: 12-13.pdf30 Jul 2019
OtherFile: 13-13.pdf30 Jul 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Puneville Phase II Cluster AP52100000440Punawale, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Dec 2023
The EminenceP52100022805Punawale, Pune15Oct 2019CompletedSep 2023Sep 2023
Puneville Phase IP52100000441Punawale, Pune-Jul 2017CompletedJun 2022Registered original: Dec 2020Late, Jun 2024

How this compares with Pune

66%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kairosa Cluster A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmKairosa Cluster ACompleted 79Lapsed / revoked 27Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 187 registered projects within 2 km.

Builder: Benchmarrk Realty LLP

Benchmarrk Realty LLP has 11 registrations on MahaRERA, including Puneville Phase I and Puneville Phase II Cluster A. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Kairosa Cluster A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kairosa Cluster A is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kairosa Cluster A?

The registered promoter entity is Benchmarrk Realty LLP, a partnership as per the filing. Its CIN U68100PN2025PTC237318 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kairosa Cluster A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kairosa Cluster A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kairosa Cluster A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kairosa Cluster A?

The professionals named in the filing: Architect: VK architecture; Engineer: RAHUL SURESH DHUMAL; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: G N Mantri & Associates; Chartered Accountant: FAA & ASSOCIATES LLP; Chartered Accountant: R. Devendra Kumar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kairosa Cluster A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kairosa Cluster A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kairosa Cluster A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.