Home / Browse projects / Mumbai Suburban, Maharashtra / KAILASH RESIDENCY

Registered No litigation declared Others project

KAILASH RESIDENCY

By TRIDEV SHREEJI ASSOCIATES

RG-MH-91522 · RERA P51800014738 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 48 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
5 of 11Construction stages donefurthest along: Staircases, 97%
47 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 200 documents Report an error

KAILASH RESIDENCY is a Others project by TRIDEV SHREEJI ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014738 on 26 Dec 2017. Possession was promised by 28 Aug 2026 and is now 2 months past that date. The completion date has moved by 48 months from the original filing. 17 of the 64 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAILASH RESIDENCY
  • TypeOthers
  • Location
    • M G ROAD
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014738
  • ReraGenie IDRG-MH-91522

Builder

  • NameTRIDEV SHREEJI ASSOCIATES
  • Entity typePartnership
  • PartnersMEHUL HARISH GOSAR, PIYUSH TULSIDAS THAKKER, HARESH D BHANUSHALI, PIYUSH HARISH GOSAR, HEMANT MANGALDAS BHANUSHALI, DEEPAK MULCHAND GOSAR

Key dates

2 months past promisethis monthRegisteredDec 2017First promiseAug 2022Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2017
  • Promised completion28 Aug 2026
  • Revised completionRevised to 28 Aug 2026 (originally 28 Aug 2022)
  • Buildings1 building record
  • Documents filed200 files

Current status

27%17 of 64 units booked
66.1%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAILASH RESIDENCYNA181856864

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.

KAILASH RESIDENCY: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises82%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,213 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
Declared on5 Jan 2026
LandownerVillageDistrict
SEJPAL CO OPERATIVE HOUSING SOCIETYKurlaMumbai Suburban
MOCHI BUILDING PRAGJI SUNDARJI APARTMENTKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI3742.72
Proposed, not sanctioned1,213 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND WEST MUMBAI 400080
Estimated costRs 32.93 cr
Cost incurredRs 21.76 cr
Work done66.06%
BuildingWingEstimatedIncurred
KAILASH RESIDENCYNARs 32.48 crRs 21.76 cr
-NARs 45.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY TURBADKAR
EngineerR C TIPNIS
Chartered AccountantCA LUCKY SHARMA
Chartered AccountantCA Ajit Ramchandra More
PartnerRole in project
TRIDEV SHREEJI ASSOCIATES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012572Aug 2022 → Aug 2023

Reason as filed by the promoterThis is due to covid related circumstances and provisions of DCPR 2034

EXT51800017364Aug 2022 → Aug 2024

Reason as filed by the promoterThis is due to the provisions of DCPR 2034 and handing over setback area to MCGM

EXT51800024570Aug 2022 → Aug 2025

Reason as filed by the promoterThe proposal is being submitted approved as per 33-20/B (DCPR 2023), hence extension is being required.

EA10092502551Aug 2022 → Aug 2026

Reason as filed by the promoterDue to Implication of 33/20B of DCPR 2034 & Landing over set back to BMC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed200

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 200 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 From Architects - December 2025_Sign.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 From Architects - March 2026_Sign.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 From Architects - March 2026_Sign.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - December 2025.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - March 2026.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - March 2026.pdf12 Aug 2026
Withdrawal Update Form 3File: TSA - Form 3 December 2025_Sign_Com.pdf12 Aug 2026
Withdrawal Update Form 3File: TSA - Form 3 March 2026_Sign.pdf12 Aug 2026
Withdrawal Update Form 3File: TSA - Form 3 March 2026_Sign.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 From Architects - September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 From Architects - September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 3File: TSA - Form 3 September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 3File: TSA - Form 3 September 2025_Sign.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 From Architects - September 2025_Sign.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 Structural Consultant - September 2025_Sign.pdf1 May 2026
Withdrawal Update Form 3File: TSA - Form 3 September 2025_Sign.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf22 Nov 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf22 Nov 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025 _Revised.pdf22 Nov 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf17 Nov 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf17 Nov 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025.pdf17 Nov 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025 _Revised.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: TSA Form 5 - FY 2024-2025.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf15 Sep 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf15 Sep 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf15 Sep 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf15 Sep 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025.pdf15 Sep 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025.pdf15 Sep 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf10 Sep 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant - June 2025.pdf10 Sep 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2025.pdf10 Sep 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2024_Compress.pdf8 Sep 2025
Withdrawal Update Form 2File: Form 2 Structural Consultant_June 2024.pdf8 Sep 2025
Withdrawal Update Form 3File: TSA - Form 3 June 2024_Compress.pdf8 Sep 2025
Form 1File: Form 1 From Architects - March 2025_Compress.pdf28 Aug 2025
Form 2File: Form 2 Structural Consultant - March 2025_Compress.pdf28 Aug 2025
Form 3File: Form 3 - TSA - March 2025_Compress.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - March 2025.pdf28 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects - December 2024_Compress.pdf5 Apr 2025
Certificates of CA (Form 3)File: TSA - Form 3 December 2024_Compress.pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant - December 2024_Compress.pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant - December 2024_Compress.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - September 2024_Compress.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - December 2024_Compress.pdf5 Apr 2025
Certificates of CA (Form 3)File: TSA - Form 3 September 2024.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects - September 2024.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant - September 2024_Signed_Compress.pdf15 Oct 2024
Layout approvalFile: Drawing.pdf12 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC-12-09-2023.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION-27-11-2023.pdf12 Aug 2024
Declaration about Commencement CertificateFile: TSA Declaration of Further CC 01042022.pdf12 Aug 2024
Declaration about Commencement CertificateFile: TSA Declartion of further CC 12092023.pdf12 Aug 2024
Declaration in FORM BFile: TSA KR Declaration - Form B - TSA.pdf12 Aug 2024
Declaration in FORM BFile: TSA KR Declaration - Form B - Society.pdf12 Aug 2024
Declaration in FORM BFile: TSA KR Declaration - Form B - TSA.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: TSA - Disc of Sold Unsold Inventory - June 2024.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant_June 2024.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate_Mar2024_05-04-2024.pdf10 Aug 2024
Certificates of CA (Form 3)File: TSA - Form 3 June 2024_Compress.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in Other Real Estate Org - Annexure A - TSA.pdf10 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects - June 2024_Compress.pdf5 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TSA Form 5 - FY 2023-2024.pdf5 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TSA Form 5 - FY 2023-2024.pdf5 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant_March 2024.pdf12 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects_December 2023.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects_September 2023.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 From Architects_March 2024.pdf16 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant_December 2023.pdf16 May 2024
Certificates of CA (Form 3)File: TSA Form 3_Oct 2023 - December 2023_Compress.pdf16 May 2024
Certificates of CA (Form 3)File: TSA Form 3 March 2024_Compress.pdf16 May 2024
Certificates of CA (Form 3)File: TSA From 3_September 2023.pdf14 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Consultant_September 2023.pdf13 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TSA ANNUAL REPORT - FY 2022-2023.pdf12 Aug 2023

How this compares with Mumbai Suburban

27%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAILASH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmKAILASH RESIDENCYCompleted 125Lapsed / revoked 97Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 374 registered projects within 2 km.

Builder: TRIDEV SHREEJI ASSOCIATES

TRIDEV SHREEJI ASSOCIATES has 1 registration on MahaRERA, including KAILASH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KAILASH RESIDENCY is delayed beyond 28 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAILASH RESIDENCY?

The registered promoter entity is TRIDEV SHREEJI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAILASH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAILASH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAILASH RESIDENCY?

The professionals named in the filing: Architect: VIJAY TURBADKAR; Engineer: R C TIPNIS; Chartered Accountant: CA LUCKY SHARMA; Chartered Accountant: CA Ajit Ramchandra More. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAILASH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAILASH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAILASH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.