Completed No litigation declared Residential / Group Housing project

K City Phase 1

By Unique Triaa Ventures

RG-MH-16802 · RERA P52100026909 · Last updated on MahaRERA portal: 13 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

K City Phase 1 is a Residential / Group Housing project by Unique Triaa Ventures in Pune, Maharashtra, registered with MahaRERA as P52100026909 on 3 Nov 2020. The registration is recorded completed; possession was promised by 15 May 2025.

At a glance

Project

  • NameK City Phase 1
  • TypeResidential / Group Housing
  • Location
    • Near Renuka Mata Mandir
    • Keshavnagar
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100026909
  • ReraGenie IDRG-MH-16802

Builder

  • NameUnique Triaa Ventures
  • Entity typePartnership
  • PartnersAnkush Krishanlal Bansal, Manish Radhesham Agarwal, Mukesh Tilakchand Agarwal
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredNov 2020PromisedMay 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2020
  • Promised completion15 May 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA150000
B WingNA150000
C WingNA160000
MHADANA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,074 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Peerpasha Huseni Abdul Razzak Inamdar(P A Inamdar)PethPune

Approvals and building plan

Permissible FSI14544.12
Proposed, not sanctioned13,325 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhosale Nagar, Range Hills Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHirak Shah
EngineerAnkit Goel
Chartered AccountantParakh Shah and Associates
PartnerRole in project
Unique Triaa Ventures-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Nov 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: K CITY PH 1 FORM 4.PDF13 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: K CITY PH 1 FORM 4.PDF8 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K CITY BUILDING MHADA A B OCCUPANCY.pdf8 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K City Ph 1 and DEF OC.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K CITY PH 1 FORM 1.PDF19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PH 1 FORM 3_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K CITY PH 1 FORM 2.PDF19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY K CITY PH 1.PDF19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K CITY PH 1 FORM 2A.PDF19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: K CITY PH 1 FORM 5.PDF19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K CITY PH 1 FORM 1 Q1.PDF20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K CITY PH 1 FORM 2 Q1.PDF19 Jul 2024
Disclosure of sold/ booked inventoryFile: K CITY PH 1 SOLD INVENTORY Q1.PDF19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PH 1 FORM 3 Q1_compressed (1).pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K CITY PH 1 FORM 2 MAR 24.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PH 1 FORM 3 MAR 24_compressed.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K CITY PH 1 FORM 2 JAN 24.PDF16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PH 1 FORM 3 DEC 23_compressed.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K CITY ABC.PDF13 Apr 2024
Disclosure of sold/ booked inventoryFile: K CITY PH 1 SOLD INVENTORY MAR 24.PDF13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K CITY PH 1 FORM 1 DEC 23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: K CITY PH 1 SOLD INVENTORY DEC 23.PDF20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K CITY PH 1 FORM 5.PDF12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PH 1 FORM 3 Q2_compressed.pdf5 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: K CITY PH 1 FORM 2A.PDF30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K CITY Q4 DT 31-03-2023.PDF20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K CITY PHASE 1.PDF20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K CITY PH 1 FORM 1 Q2_compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Phase I.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: K CITY PH 1 SOLD INVENTORY_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K CITY PHASE 1 31052023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY K CITY PH 1.PDF27 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DT31032023 K CITY PHASE1 MHADA.PDF16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A K-CITY_31-03-2022.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA CERTIFICATE PHASE I APRIL 2021 TO MARCH 2022.pdf27 Mar 2023
Disclosure of sold/ booked inventoryFile: PHASE I 30-09-2022.pdf11 Jan 2023
Disclosure of sold/ booked inventoryFile: PHASE I 31-12-2022.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOC3.pdf16 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOC1.pdf16 Dec 2022
Disclosure of sold/ booked inventoryFile: PHASE I INVENTORY OF FLATS_compressed.pdf3 Aug 2022
Layout approvalFile: Layout.pdf21 Sep 2021
Building plan approvalFile: Layout.pdf21 Sep 2021
Copy of the legal title reportFile: K City Tile Search.pdf21 Sep 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf21 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf21 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Cert 1.pdf21 Sep 2021
Disclosure of sold/ booked inventoryFile: kcity.pdf21 Sep 2021
Declaration about Commencement CertificateFile: CC Disclosure.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory.pdf27 Jul 2021
Proforma of Allotment letterFile: Agreement to sale Draft.pdf28 Jun 2021
Proforma of Allotment letterFile: DRAFT -AGREEMENT TO SALE.pdf10 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: SKMBT_C36021040909160_compressed.pdf1 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: SKMBT_C36021040909160_compressed.pdf1 Jun 2021
Copy of the legal title reportFile: SEARCH AND TITLE REPORT pressed_compr.pdf30 Dec 2020
Layout approvalFile: Layout Plan.pdf28 Oct 2020
Building plan approvalFile: Building Plan.pdf28 Oct 2020
PAN CardFile: PAN-Unique Triaa.pdf28 Oct 2020
Copy of the legal title reportFile: SEARCH AND TITLE REPORT.pdf28 Oct 2020
Copy of the legal title reportFile: SEARCH AND TITLE REPORT.pdf28 Oct 2020
Details of encumbrancesFile: Details of encumbrances.pdf28 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf28 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf28 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate_compressed.pdf28 Oct 2020
Declaration in FORM BFile: Declaration in Form B.pdf28 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 of Unique Triaa Ventures_Phase 1.pdf28 Oct 2020
Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale.pdf28 Oct 2020
Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale.pdf28 Oct 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K City Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Keshavnagar13,700+ in Pune

2 kmK City Phase 1Completed 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Unique Triaa Ventures

Unique Triaa Ventures has 3 registrations on MahaRERA, including K City Phase 1 and K City Building D, E, F. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K City Phase 1 is delayed beyond 15 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K City Phase 1?

The registered promoter entity is Unique Triaa Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K City Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for K City Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K City Phase 1?

The professionals named in the filing: Architect: Hirak Shah; Engineer: Ankit Goel; Chartered Accountant: Parakh Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K City Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K City Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K City Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.