Home / Browse projects / Pune, Maharashtra / Jubilation A Wing Phase II

De-registered No litigation declared Others project

Jubilation A Wing Phase II

By Aakankssha Properties

RG-MH-50112 · RERA P52100047953 · Last updated on MahaRERA portal: 11 Sep 2025

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 12 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
74 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Jubilation A Wing Phase II is a Others project by Aakankssha Properties in Pune, Maharashtra, registered with MahaRERA as P52100047953 on 2 Dec 2022. Possession was promised by 23 Oct 2025 and is now 12 months past that date. 2 of the 76 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameJubilation A Wing Phase II
  • TypeOthers
  • Location
    • Yawalewadi
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047953
  • ReraGenie IDRG-MH-50112

Builder

  • NameAakankssha Properties
  • Entity typePartnership
  • PartnersDipesh Balvantrai Naik, Karim Firoz Hirji
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

12 months past promisethis monthRegisteredDec 2022PromisedOct 2025

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on2 Dec 2022
  • Promised completion23 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

3%2 of 76 units booked

Figures as on 11 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA101072476

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A Wing: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered41
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,904 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5794.89
Proposed, not sanctioned4,634 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society, East Street Camp, Pune - 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA Consortium Pvt. Ltd.
EngineerS K Consultants & Engineers
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Aakankssha Properties-

Litigation declared1

CaseCourtStatus
559/2014Honarable Civil Judge Jr Division PunePending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: Circular 29 - Jubilation A Wing Phase II as on March 2025.pdf11 Sep 2025
Form 1File: Form 1 - Jubilation A Wing Phase II as on March 2025.pdf11 Sep 2025
Form 2File: Form 2 - Jubilation A Wing Phase II as on March 2025.pdf11 Sep 2025
Form 3File: Form 3 - Jubilation A Wing - Phase II as on 31-03-2025.pdf11 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jubilation A Wing Phase II as on March 2025.pdf1 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing - Phase II as on 31-03-2025_compressed.pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on March 2025.pdf1 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Oct-Dec,24 P-II_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - Oct-Dec,24 - P-II.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing Phase II as on Dec 2024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on Dec 2024.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jubilation A Wing Phase 2 as on December 2024.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Jubilation A Wing Phase II as on Sep 2024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing Phase II as on Sep 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on Sep 2024.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jubilation A Wing Phase II as on June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on June 2024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing Phase II as on June 2024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: ERA CIRCULAR - 29 - 12072024.pdf12 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: RERA CIRCULAR - 45 - 12072024.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jubilation A Wing Phase II as on March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing Phase II as on March 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Jubilation A wing as on Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 -.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing as on 31-12-2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Jubilation A Wing as on September 2023.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jubilation A Wing Phase II as on Sep 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jubilation A Wing Phase II as on Sep 2023.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Jubilation A Wing Phase II FY 2022-23.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Jubilation A Wing Phase II as on 30-06-2023.pdf6 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jubilation A Wing Phase II as on 30-06-2023.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: form 29 sign.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jubilation A Wing Phase II Mar 23 - Form 2.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jubilation A Wing Phase II as on March 2023.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Jubilation A Wing Phase II.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Jubilation A Wing Phase -II as on December 2022.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jubilation A Wing as on December 2022.pdf15 Feb 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter -Dues.pdf24 Nov 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Letter -Dues.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (31).pdf24 Nov 2022
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_Registered Mortgage (1).pdf5 Nov 2022
Building plan approvalFile: 5-1-2.pdf1 Nov 2022
Copy of the legal title reportFile: 1 Copy of the legal title report (10)_rotated.pdf1 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 5-1-2.pdf1 Nov 2022
Declaration about Commencement CertificateFile: CC Declaration -Format D.pdf1 Nov 2022
Proforma of Agreement for saleFile: Draft AFS_Aakankssha Properties_Jubilation_13_10_2022.pdf1 Nov 2022
Proforma of Allotment letterFile: Allotment Letter_Aakankssha Properties_Jubilation_13_10_2022.pdf1 Nov 2022
Layout approvalFile: 1(86)_compressed_rotated.pdf19 Oct 2022
Building plan approvalFile: ilovepdf_merged (3)_11zon.pdf19 Oct 2022
PAN CardFile: PANCARD.pdf19 Oct 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter -Dues.pdf19 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf19 Oct 2022
Copy of Layout Approval (in case of layout)File: 1(86)_compressed_rotated.pdf19 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (3)_11zon.pdf19 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_11072022.pdf19 Oct 2022
Declaration in FORM BFile: FORM -B (Promoter).pdf19 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf19 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter_Aakankssha Properties_Jubilation_17102022.pdf19 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFS_Aakankssha Properties_Jubilation_17102022.pdf19 Oct 2022

How this compares with Pune

3%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jubilation A Wing Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yawalewadi13,700+ in Pune

2 kmJubilation A Wing Phase Completed 52Lapsed / revoked 26Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: Aakankssha Properties

AAKANKSSHA PROPERTIES has 2 registrations on MahaRERA, including JUBILATION and Jubilation A Wing Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Jubilation A Wing Phase II shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Jubilation A Wing Phase II is delayed beyond 23 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jubilation A Wing Phase II?

The registered promoter entity is Aakankssha Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jubilation A Wing Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jubilation A Wing Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jubilation A Wing Phase II?

The professionals named in the filing: Architect: ANA Consortium Pvt. Ltd.; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jubilation A Wing Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jubilation A Wing Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jubilation A Wing Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.