JIVAN PRAKASH 89 BUILDCON
RG-MH-86987 · RERA P51900034521 · Last updated on MahaRERA portal: 16 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JIVAN PRAKASH 89 BUILDCON is a Residential / Group Housing project by EIGHTY NINE BUILDCON in MAHIM WEST, 400016, registered with MahaRERA as P51900034521 on 11 Apr 2022. Possession is promised by 31 Dec 2028. 35 of the 115 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameJIVAN PRAKASH 89 BUILDCON
- TypeResidential / Group Housing
- Location
- SENAPATI BAPAT MARG
- MAHIM WEST
- 400016
- Pincode400016
- RERA no.P51900034521
- ReraGenie IDRG-MH-86987
Builder
- NameEIGHTY NINE BUILDCON
- Entity typePartnership
- GSTIN27AAJFE3535H1ZF
- PartnersMANSI ANKIT DHARIA, NEETA DHARIA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Apr 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Current status
Figures as on 16 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JIVAN PRAKASH 89BUILDCON | NA | 28 | 16 | 89 | 26 | 115 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
JIVAN PRAKASH 89BUILDCON: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHARAD DHARIA | Greater Mumbai (M Corp.) (Part) (802794) | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAKASH R DHARIA |
| Engineer | PRADEEP R DHARIA |
| Chartered Accountant | JEET RAJESH WANI |
| Chartered Accountant | JINESH SHAH AND CO |
| Chartered Accountant | KAGRANA AND ASSOCIATES |
| Chartered Accountant | ISHWARLAL AND CO |
| Partner | Role in project |
|---|---|
| EIGHTY NINE BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Nov 2024
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate Eighty Nine Oct to Dec-25 sign.pdf | 16 May 2026 |
| Form 2File: Form 2 Eighty Nine Oct to Dec-25.pdf | 16 May 2026 |
| Form 3File: Form 3 Eighty Nine Oct to Dec-25.pdf | 16 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser Oct to Dec-25 sign 89.pdf | 16 May 2026 |
| Form 1File: Architct Certificate Eighty Nine Jan to March-26 sign.pdf | 16 May 2026 |
| Form 2File: Form 2 Eighty Nine Jan to Mar-26.pdf | 16 May 2026 |
| Form 3File: Form 3 Eighty Nine Jan to Mar-26.pdf | 16 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser Jan to March-26 Sign 89.pdf | 16 May 2026 |
| Form 5 (FY 2024-2025)File: CA Annual report form 5 2024-25.pdf | 24 Apr 2026 |
| Form 3File: CA Certificate March-25.pdf | 20 Mar 2026 |
| Form 1File: Architecht Certificate Eighty Nine March-25 SIGN.pdf | 20 Mar 2026 |
| Form 2File: Engg certificate March-25.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inverntory March-25 sign.pdf | 20 Mar 2026 |
| Form 3File: CA Certifcate June 2025.pdf | 20 Mar 2026 |
| Form 1File: Architect Certificate June-25 sign.pdf | 20 Mar 2026 |
| Form 2File: Engg Certificate June- 2025.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory June-25-Sign.pdf | 20 Mar 2026 |
| Form 3File: CA Certifcate Sept 2025.pdf | 20 Mar 2026 |
| Form 1File: Architect Sep-25 sign.pdf | 20 Mar 2026 |
| Form 2File: Engg Certificate Sep-25.pdf | 20 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Sep-25 sign.pdf | 20 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-24 sign.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aehictect Certifiate June-24 Sign.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecht Cer Sep-24 Sign.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 March-24_compressed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 June-24_compressed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate report Form 3 Sep-24_compressed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate March-2024.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certiticate June-2024.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Sep-2024.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engg Certificate March-2024.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Annual report Form 5 2023-2024_compressed.pdf | 18 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate.pdf | 15 Nov 2024 |
| Building plan approvalFile: Amend letter 13022024_compressed.pdf | 11 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amend letter 13022024_compressed.pdf | 11 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-23.pdf | 11 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Mar-24.pdf | 11 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JUNE-23.pdf | 11 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certticate 300623.pdf | 11 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certifcate 300923.pdf | 11 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate 311223.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eighty Nine Form 3 Certificate June-23_compressed.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eighty Nine Form 3 Certificate Sep-23_compressed.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eighty Nine Form 3 Certificate Dec-23_compressed.pdf | 11 Jun 2024 |
| Building plan approvalFile: Amend Plan 1.pdf | 20 Mar 2024 |
| Building plan approvalFile: Amed Plan 2.pdf | 20 Mar 2024 |
| Building plan approvalFile: Amed-3-4.pdf | 20 Mar 2024 |
| Building plan approvalFile: Amed Plan 5-6.pdf | 20 Mar 2024 |
| Building plan approvalFile: Amed Plan 7-8.pdf | 20 Mar 2024 |
| Layout approvalFile: Amend letter_compressed (1).pdf | 20 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Amend letter_compressed (1).pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amend Plan 1.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amed Plan 2.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amed-3-4.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amed Plan 5-6.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amed Plan 7-8.pdf | 20 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Mar-23_compressed.pdf | 12 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate form 3 March-23_compressed.pdf | 12 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual report form 5 2023-24_C-compressed.pdf | 12 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March-23.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June-23.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep- 23.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 MAR-23.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JUNE-23.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SEPT-23.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2 MAR-23.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate june-22.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep-22.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-22.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate june-22.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate sep-22.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate dec-22.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCT TO DEC-22.pdf | 4 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: full CC 20042023.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf | 9 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA FORM 5.pdf | 9 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Certificate.pdf | 9 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Form-3.pdf | 17 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 4 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arechitecht certificate.pdf | 4 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 106 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep JIVAN PRAKASH 89 BUILDCON on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHIM WEST
Island Cove
LH Residential Housing Private Limited
Midtown Bay
Rising Sun Impex Private Limited
Island Cove Tower 4
LH Residential Housing Private Limited, Sh
Bayline Residences
HRUB Infra Projects Pvt Ltd
VITALIS
SURAJ ESTATE DEVELOPERS LTD
Suraj One Business Bay
ICONIC PROPERTY DEVELOPERS PVT LTD
Builder: EIGHTY NINE BUILDCON
EIGHTY NINE BUILDCON has 1 registration on MahaRERA, including JIVAN PRAKASH 89 BUILDCON. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if JIVAN PRAKASH 89 BUILDCON is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JIVAN PRAKASH 89 BUILDCON?
The registered promoter entity is EIGHTY NINE BUILDCON, a partnership as per the filing. Its GSTIN 27AAJFE3535H1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JIVAN PRAKASH 89 BUILDCON?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for JIVAN PRAKASH 89 BUILDCON?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JIVAN PRAKASH 89 BUILDCON?
The professionals named in the filing: Architect: PRAKASH R DHARIA; Engineer: PRADEEP R DHARIA; Chartered Accountant: JEET RAJESH WANI; Chartered Accountant: JINESH SHAH AND CO; Chartered Accountant: KAGRANA AND ASSOCIATES; Chartered Accountant: ISHWARLAL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JIVAN PRAKASH 89 BUILDCON?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.