Home / Browse projects / Palghar, Maharashtra / JB PEARL

Registered No litigation declared Residential / Group Housing project

JB PEARL

By JB DEVELOPERS

RG-MH-05878 · RERA P99000051940 · Last updated on MahaRERA portal: 8 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
35 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

JB PEARL is a Residential / Group Housing project by JB DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000051940 on 13 Jul 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 21 of the 56 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameJB PEARL
  • TypeResidential / Group Housing
  • Location
    • MAJITHIA PARK
    • ACHOLE ROAD
    • NALASOPARA EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000051940
  • ReraGenie IDRG-MH-05878

Builder

  • NameJB DEVELOPERS
  • Entity typePartnership
  • GSTIN27AARFJ2256N1ZP
  • PartnersRAHUL ANILKUMAR TIWARI, SHEKHAR H JADHAV, AJAY H JADHAV, ROSHANI A JADHAV, SACHINKUMAR B BHATT

Key dates

this monthRegisteredJul 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Mar 2026)
  • Buildings1 building record
  • Documents filed79 files

Current status

38%21 of 56 units booked
90.5%Work done, per cost certificate

Figures as on 8 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JB PEARLNA8850656

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

JB PEARL: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered1
Open Space34

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area690 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
BINOY MAJITHIA PARK CHSLVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI2358.59
Proposed, not sanctioned2,359 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRELIABLE PRESTIGE ,ACHOLE ROAD, NALASOPARA EAST
Estimated costRs 5.58 cr
Cost incurredRs 5.05 cr
Work done90.5%
BuildingWingEstimatedIncurred
JB PEARLNARs 5.02 crRs 4.77 cr
-NARs 55.83 lakhRs 27.92 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAPE CONSULTANTS
EngineerSEEMU CONSULTANCY
Chartered AccountantGANESH PATNE
Chartered AccountantANAND DESAI
PartnerRole in project
JB DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28072621910Mar 2026 → Mar 2027

Reason as filed by the promoter100% WORK IS COMPLETED AND APPLIED FOR OCCUPANCY CERTFICATE. 1. LACK OF LABOUR 2. NON AVAILIBILITY OF MATERIALS 3. RAIN 4. PAPER WORK

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf8 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Sep 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf8 Sep 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf28 Jul 2026
Withdrawal Update Form 1File: JBD FORM1.pdf24 Apr 2026
Withdrawal Update Form 2File: JBD FORM2.pdf24 Apr 2026
Withdrawal Update Form 3File: JBD FORM3.pdf24 Apr 2026
Withdrawal Update Form 1File: JBD ARCHITECT CERTIFICATE..pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate JBD.pdf18 Apr 2026
Withdrawal Update Form 3File: CA certificate of JBD.pdf18 Apr 2026
Withdrawal Update Form 1File: JBD Form 1.pdf25 Mar 2026
Withdrawal Update Form 1File: JBD ARCHITECT CERTIFICATE..pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate JBD.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate JBD.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate JBD.pdf25 Mar 2026
Withdrawal Update Form 3File: CA certificate of JBD.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate JBD.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate JBD.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate JBD.pdf17 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JB PERAL Architect certificate.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JB pearl CA certificate.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JBD ENGINEER RERA CERTIFICATE.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: JB Peral unsold inventory.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate JAN 25.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate JAN 25.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE JAN 2025.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: jb pearl unsold inventory January 25.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JBD Architect Certificate.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JBD Engineer Certificate.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: JBD Quality certificate.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JBD CA Certificate new.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JBD Architect Certificate.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JBD CA Certificate new.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JBD Engineer Certificate.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: JBD Quality certificate.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate JBD.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JBD CIVIL ENGINEER.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: JB Developer Unsold Inventory.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JBD CA Certificate_11zon.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JBD Architect Certificate .pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JBD Engineer Certificate .pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: JBD unsold inventory.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JB Developers CA form 3.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JBD Architect certificate.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JB PEARL ENGINEER CERTIFICATE.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: JBD Unsold inventory jan 2024.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JB pearl Form 3 Ca certIficate.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JBD.pdf24 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE JBD form 2.pdf24 Oct 2023
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY JBD.pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JBD CA CERTIFICATE.pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: no encumbrances (1).pdf1 Jul 2023
Details of encumbrances concerned to LegalFile: no encumbrances (1).pdf1 Jul 2023
CERSAI detailsFile: cersai DECLARATION.pdf1 Jul 2023
Other - LegalFile: JBD Title report new.pdf25 Jun 2023
Other - FinanceFile: JBD no encumbrances finance.pdf25 Jun 2023
Copy of the legal title reportFile: JBD Title report new.pdf10 Jun 2023
Proforma of Allotment letterFile: JBD Model form of allotment letter (1).pdf10 Jun 2023
Proforma of Agreement for saleFile: JBD rera english final agmt (1).pdf10 Jun 2023
Deviation Report with respect to Allotment letterFile: JBD-No Deviation in allotment letter format.pdf10 Jun 2023
Deviation Report with respect to model copy of AgreementFile: JBD-No Deviation in format of Agreement.pdf10 Jun 2023
Declaration about Commencement CertificateFile: JBD-Declaration about Commencement certificate.pdf27 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: JBD- Disclosure of interest in other real estate Organizations.pdf27 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: JBD-Declaration about seperate Bank Account for real estate project.pdf27 May 2023
Layout approvalFile: JBD BP.pdf20 May 2023
Building plan approvalFile: JBD BP.pdf20 May 2023
Building plan approvalFile: JBD NA Order (2).pdf20 May 2023
PAN CardFile: JBD PanCard.pdf20 May 2023
Details of encumbrances concerned to FinanceFile: jbd no encumbrance.pdf20 May 2023
Details of encumbrances concerned to LegalFile: jbd no encumbrance.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: JBD BP.pdf20 May 2023
Building Plan Approval / NA Order for plotted developmentFile: JBD BP.pdf20 May 2023
Building Plan Approval / NA Order for plotted developmentFile: JBD NA Order (2).pdf20 May 2023
Commencement Certificates / NA Order for plotted developmentFile: JBD CC.pdf20 May 2023
Declaration in FORM BFile: jbd form b developers.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1 JBD RERA.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 JBD RERA.pdf20 May 2023
Disclosure of sold/ booked inventoryFile: jbd unsold inventory.pdf20 May 2023

How this compares with Palghar

38%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JB PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALASOPARA EAST3,200+ in Palghar

Builder: JB DEVELOPERS

JB DEVELOPERS has 1 registration on MahaRERA, including JB PEARL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if JB PEARL is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JB PEARL?

The registered promoter entity is JB DEVELOPERS, a partnership as per the filing. Its GSTIN 27AARFJ2256N1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JB PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JB PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JB PEARL?

The professionals named in the filing: Architect: SHAPE CONSULTANTS; Engineer: SEEMU CONSULTANCY; Chartered Accountant: GANESH PATNE; Chartered Accountant: ANAND DESAI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JB PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JB PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JB PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.