Jare Aangan
RG-MH-82878 · RERA P52100051275 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jare Aangan is a Residential / Group Housing project by Sachin Vasant Jare in Pune, Maharashtra, registered with MahaRERA as P52100051275 on 8 Jun 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 49 of the 56 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameJare Aangan
- TypeResidential / Group Housing
- Location
- Chikhali
- Haveli
- Pune
- 411062
- Pincode411062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051275
- ReraGenie IDRG-MH-82878
Builder
- NameSachin Vasant Jare
- Entity typeIndividual
- Other registrations3 more →
- Completed1 of 4
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed62 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jare Aangan | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 98%.
Jare Aangan: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Jare Aangan | NA | Rs 6.00 cr | Rs 2.60 cr |
| - | NA | Rs 1.00 cr | Rs 1.59 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shekhar Kokane kokane |
| Engineer | Piraji Narayanrao Kambale |
| Engineer | Shriram Ramesh Nagargoje |
| Chartered Accountant | NPSR & Associates - CA. Vivek Lahoti |
| Chartered Accountant | Ganesh Sunil Mandlecha |
| Partner | Role in project |
|---|---|
| Sachin Vasant Jare | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSir / Madam, all construction activities of the project have been completed in all respects. The project is now at the final statutory stage, and the only remaining milestone is Firm Demarcation and receipt of the Completion Certificate (CC) from the competent authority. The application for firm demarcation has already been submitted to the concerned authority, and the same is under process. As per the current status and official communication, the Firm Demarcation is expected to be received on or before 31.03.2026 The critical path of the project presently consists only of the following activ
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 (1).pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Engg (1).pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA (1).pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Jare Aangan.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Jare Aangan.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Jare Aangan.pdf | 31 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 31 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Aangan with sign.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 with sign corect.pdf | 4 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 WIith Sign.pdf | 3 Oct 2025 |
| Form 5 (FY 2023-2024)File: Jare Angan Form 5.pdf | 3 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Aangan.pdf | 8 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 Aangan with sign.pdf | 8 Sep 2025 |
| Withdrawal Update Form 3File: Final Form 3 Q4_compressed.pdf | 8 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jare Aangan Form 3 31-03-25.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31-03-25 Jare Aangan.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jare Aangan 31-03-25.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 06 2024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 09 2024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 12 2024.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 06 2024.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 09 2024.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 06 2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 09 2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 30 12 2024.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Jare Angan Form 5.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Sept 2023.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 Dec 2023.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 March 2024.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Q1_compressed.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Q2_compressed.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Q3_compressed.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Q4_compressed.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Interest in Other Real Estate Organizations (2).pdf | 10 May 2023 |
| Layout approvalFile: Approved Layout_compressed.pdf | 2 May 2023 |
| Building plan approvalFile: Building Plan_compressed.pdf | 2 May 2023 |
| PAN CardFile: PAN Card.pdf | 2 May 2023 |
| Copy of the legal title reportFile: Search Title_compressed.pdf | 2 May 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf | 2 May 2023 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf | 2 May 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf | 2 May 2023 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf | 2 May 2023 |
| Copy of Layout Approval (in case of layout)File: Approved Layout_compressed.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf | 2 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-Latest.pdf | 2 May 2023 |
| Declaration about Commencement CertificateFile: Declaration of CC.pdf | 2 May 2023 |
| Declaration in FORM BFile: Form B.pdf | 2 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 2 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jare Angan_compressed.pdf | 2 May 2023 |
| Proforma of Agreement for saleFile: Agreement - JARE ANGAN - Draft.pdf | 2 May 2023 |
| Proforma of Allotment letterFile: Draft Allotment Letter.pdf | 2 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf | 2 May 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation wrt Allotment.pdf | 2 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation wrt Agreement.pdf | 2 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Jare Aangan on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chikhali13,700+ in Pune
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
SHAKUNTAL COMMERCIA
SHAKUNTAL GROUP
Santiago Skyarc
Anjani Promoters
DWARKA BLUE WATER
SHAKUNTAL BUILDCON
24 SUNSHINE TOWERS
SHIV ASSOCIATES
Ganesh Paradise Phase I
EKDANTA NEST LLP
GANESH SIDDHI PHASE 3
S B PATIL SPACES AND INFRA PVT LTD
Builder: Sachin Vasant Jare
Sachin Vasant Jare has 4 registrations on MahaRERA, including Shridhar Heights and Jare Shrusti. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Jare Aangan is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jare Aangan?
The registered promoter entity is Sachin Vasant Jare, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jare Aangan?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jare Aangan?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jare Aangan?
The professionals named in the filing: Architect: Shekhar Kokane kokane; Engineer: Piraji Narayanrao Kambale; Engineer: Shriram Ramesh Nagargoje; Chartered Accountant: NPSR & Associates - CA. Vivek Lahoti; Chartered Accountant: Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jare Aangan?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback