Home / Browse projects / Thane, Maharashtra / Jai Shree Ganesh Co-Operative Housing Society Limited
Jai Shree Ganesh Co-Operative Housing Society Limited
By Shree Vyankatesh Enterprises
RG-MH-85451 · RERA P51700048313 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jai Shree Ganesh Co-Operative Housing Society Limited is a Residential / Group Housing project by Shree Vyankatesh Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700048313 on 26 Dec 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 15 of the 31 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameJai Shree Ganesh Co-Operative Housing Society Limited
- TypeResidential / Group Housing
- Location
- Mahatma Phule road
- Dombivli west
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- RERA no.P51700048313
- ReraGenie IDRG-MH-85451
Builder
- NameShree Vyankatesh Enterprises
- Entity typePartnership
- PartnersSamir Dasharath Deshmukh, Sushant Ashok Rakhade, Prashant Ashok Rakhade, Vilas Ramchandra Deshmukh, Milind Kamalakar Moghe, Ajit Bhagwandas Sanghvi
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Dec 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 18 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jai Shree Ganesh Co-Operative Housing Society Limited | NA | 8 | 8 | 28 | 3 | 31 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Jai Shree Ganesh Co-Operative Housing Society Limited: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Jai Shree Ganesh Co-Operative Housing Society LTD | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Jai Shree Ganesh Co-Operative Housing Society Limited | NA | Rs 4.50 cr | Rs 4.50 cr |
| - | NA | Rs 1.00 cr | Rs 92.47 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rachana Shilp |
| Engineer | RajeshThakare and Associates |
| Chartered Accountant | Kapure & kapure Chartered Accountant |
| Chartered Accountant | NAVAL KARNIK & CO. |
| Partner | Role in project |
|---|---|
| Shree Vyankatesh Enterprises | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per attachment
Reason as filed by the promoterAs per attachment
Reason as filed by the promoterThe application for Full Occupancy certificate also submitted to Competent authority that is Kalyan Dombivli Municipal Corporation through the online “Mahavastu” portal as on 1st April 2025 vide application number KDMCC/2025/1506048/71544. Screenshot of the application is annexed herewith for your quick reference. It may be noted that all the required NOC’s are submitted by the promoter and there are no compliance pending to be complied on the part of the Promoter, in order to receive Occupancy Certificate from Kalyan Dombivli Municipal Corporation. The application for full Occupancy Certifica
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Shree Vyankatesh Enterprises June 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Shree Vyankatesh Enterprises June 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Jai Shree Ganesh June 26-compressed.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 SVE.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 SVE.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Jai Ganesh - Mar 26_compressed.pdf | 20 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Jai Ganesh - 24-25.pdf | 31 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - Jai Shree Ganesh.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Jai Ganesh - Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Jai Ganesh - Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Jai Ganesh - Dec 25_compressed.pdf | 20 Jan 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - March 23.pdf | 26 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf | 26 Dec 2025 |
| Form 5 (FY 2022-2023)File: shree Vyankatesh Enterprises Form 5.pdf | 26 Dec 2025 |
| Form 5 (FY 2023-2024)File: Jai GAnesh CHS.pdf | 26 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 - Jai Shree Ganesh.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - Jai Shree Ganesh.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Jai Ganesh - Sept 25_compressed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Jai Ganesh - Form 1.pdf | 22 Aug 2025 |
| Withdrawal Update Form 2File: Shree Vyankatesh - form 2.pdf | 22 Aug 2025 |
| Withdrawal Update Form 3File: Jai Shree Ganesh - Form 3_compressed.pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: Jai Ganesh - Form 1.pdf | 7 Aug 2025 |
| Withdrawal Update Form 1File: Jai Ganesh - Form 1.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: Shree Vyankatesh - form 2.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: Shree Vyankatesh - form 2.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Jai Shree Ganesh - Form 3_compressed.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Jai Shree Ganesh - Form 3_compressed.pdf | 7 Aug 2025 |
| Form 1File: Form 1 - Jai Shree Ganesh - March 25.pdf | 25 Jun 2025 |
| Form 2File: Form 2.pdf | 25 Jun 2025 |
| Form 3File: Signed Form 3 - Jai Shree Ganesh - March 25_compressed.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclsoure - Jai Shree Ganesh - March 25.pdf | 25 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jai Shree Ganesh - March 25.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Jai Shree Ganesh - March 25_compressed.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclsoure - Jai Shree Ganesh - March 25.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jai Ganesh - Form 1.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jai Ganesh - Form 2.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Jai shree Ganesh- Disclosure.pdf | 19 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Jai GAnesh CHS.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jai Shree Ganesh - Arch Sep - 2024.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jai Shree Ganesh - Form 3_compressed.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jai Shree Ganesh - Engg Sep - 2024.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Jai Shree Ganesh - Disclosure Sept 2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure June 24 - Jai Shree Ganesh.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jai Ganesh_compressed.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assuarance - Jai Shree Ganesh - 2024.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jai Shree Ganesh.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Jai shree Ganesh.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Mar - 24.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jai Shree Ganesh - Signed form 3.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jai Shree Ganesh Engg Cert Dec 2023.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Jai Shree Ganesh Flat Inventory.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jai shree Ganesh - Form 3_compressed.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jai Shree Ganesh Dec Arch Cert.pdf | 14 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: JAI SHREE Ganesh - Quality Assuarance.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jai Shree Ganesh - Architect.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jai Shree Ganesh - Eng.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Shree Ganesh co-op Society Sep 23_compressed.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree Vyankatesh Enterprises Form 5.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar - Shree Vyankatesh - March.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar - Shree Vyankatesh - June.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Vyankatesh - March.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Vyankatesh - June.pdf | 21 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From -3 shree Ganesh Co-op Society -March 23_compressed.pdf | 21 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From -3 shree Ganesh Co-op Society -June 23_C.pdf | 21 Sep 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale-RERA-revised.pdf | 17 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for seprate bank account.pdf | 17 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: AFS deviation report_compressed.pdf | 17 Dec 2022 |
| Other - FinanceFile: Declaration for unsecured loan.pdf | 14 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrance concerned to finance.pdf | 23 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrance concerned to legal.pdf | 23 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrance concerned to finance.pdf | 23 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrance concerned to legal.pdf | 23 Nov 2022 |
| Declaration about Commencement CertificateFile: Declaration for CC.pdf | 23 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jai Ganesh Soc.pdf | 23 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shree Vyanktesh.pdf | 23 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Jai Shree Ganesh Co-Operative Housing Societ on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivli west7,600+ in Thane
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Shree Vyankatesh Enterprises
Shree Vyankatesh Enterprises has 2 registrations on MahaRERA, including Jai Shree Ganesh Co-Operative Housing Society Limited and Sai Ganesh Co-Operative Housing Society Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Jai Shree Ganesh Co-Operative Housing Society Limited is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jai Shree Ganesh Co-Operative Housing Society Limited?
The registered promoter entity is Shree Vyankatesh Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jai Shree Ganesh Co-Operative Housing Society Limited?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jai Shree Ganesh Co-Operative Housing Society Limited?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jai Shree Ganesh Co-Operative Housing Society Limited?
The professionals named in the filing: Architect: Rachana Shilp; Engineer: RajeshThakare and Associates; Chartered Accountant: Kapure & kapure Chartered Accountant; Chartered Accountant: NAVAL KARNIK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jai Shree Ganesh Co-Operative Housing Society Limited?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback