Registered No litigation declared Others project

Jagdale Giriraj

By JAGDALE INFRASTRUCTURE PVT. LTD.

RG-MH-77177 · RERA P51800045510 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
31 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

Jagdale Giriraj is a Others project by JAGDALE INFRASTRUCTURE PVT. LTD. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045510 on 24 May 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 1 of the 32 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameJagdale Giriraj
  • TypeOthers
  • Location
    • VB PHADKE MARG 90 FEET ROAD
    • MULUND EAST
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045510
  • ReraGenie IDRG-MH-77177

Builder

  • NameJAGDALE INFRASTRUCTURE PVT. LTD.
  • Entity typeCompany
  • CINU45200MH2007PTC174171
  • GSTIN27AACCJ0653K1ZJ
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRAHUL HANMANT JAGDALE, ROHIT HANMANT JAGDALE
  • Other registrations4 more →
  • Completed1 of 5
  • Past their filed date2
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredMay 2022First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 May 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 1 Sep 2025)
  • Buildings1 building record
  • Documents filed45 files

Current status

3%1 of 32 units booked
71.9%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRIRAJNA232229332

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GIRIRAJ: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area701 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
Giriraj Co Op Housing SocietyKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2298.23
Proposed, not sanctioned1,736 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor, kanakia zillion, lbs-cst road, juncation, bkc annexe, kurla west, mumbai 400070
Estimated costRs 9.92 cr
Cost incurredRs 7.13 cr
Work done71.89%
BuildingWingEstimatedIncurred
GIRIRAJNARs 9.92 crRs 7.13 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch. Yateen Gokhale
EngineerEPICONS CONSULTANTS PVT. LTD.
EngineerJACOB DOSUZA
Chartered AccountantNEHALI & CO
PartnerRole in project
JAGDALE INFRASTRUCTURE PVT. LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25072502202Sep 2025 → Mar 2026

Reason as filed by the promoterI would like to inform you that construction work on site is nearing completion, the completion of the project would be delayed by a year, due to constraint of movement space, as it adversely affects and hampers movement of materials and manpower. In spite of many adverse conditions 90% of construction work on site is completed in stipulated time. Attached herewith is Status Table of Items of work which shows that further extension of maximum 1 year would be required. You are requested to follow applicable MAHARERA guidelines for extension approval, and comply with the same to ensure timely ex

EA14032620228Sep 2025 → Sep 2026

Reason as filed by the promoterI would like to inform you that construction work on site is nearing completion, the completion of the project would be delayed by a year, due to constraint of movement space, as it adversely affects and hampers movement of materials and manpower. In spite of many adverse conditions 90% of construction work on site is completed in stipulated time. Attached herewith is Status Table of Items of work, which shows that further extension of maximum 1 year would be required. You are requested to follow applicable MAHARERA guidelines for extension approval, and comply with the same to ensure timely e

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Jagdale Giriraj Form 1.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2 JAGDALE GIRIRAJ.pdf17 Jul 2026
Withdrawal Update Form 3File: Jagdale Giriraj FROM 3.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 Giriraj.pdf7 May 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE GIRIRAJ Form 2.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 Jagdale Giriraj.pdf7 May 2026
Withdrawal Update Form 1File: FORM 1 Giriraj.pdf7 Mar 2026
Withdrawal Update Form 2File: FORMM 2.pdf7 Mar 2026
Withdrawal Update Form 3File: Form 3 Giriraj.pdf7 Mar 2026
Withdrawal Update Form 1File: form 1.pdf11 Nov 2025
Withdrawal Update Form 2File: engineers certificate (1).pdf11 Nov 2025
Withdrawal Update Form 3File: form 3.pdf11 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Giriraj Form 1.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Giriraj.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jagdale Giriraj (1).pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 giriraj.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jagdale Giriraj.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jagdale Giriraj form 3.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: disclosure of inventory.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf26 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Giriraj.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf30 May 2024
Proforma of Agreement for saleFile: Draft Agreement-Jagdale Giriraj.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf29 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement-Jagdale Giriraj (1).pdf27 Apr 2024
Details of encumbrancesFile: Encumbrance financial.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 23.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 12 23.pdf3 Apr 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf20 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA.pdf20 May 2022
Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale.pdf18 May 2022
Building plan approvalFile: 2300029_IOD_signed (1).pdf12 May 2022
Layout approvalFile: IOD RERA GIRIRAJ.pdf12 May 2022
Details of encumbrancesFile: Encumbrances .pdf12 May 2022
Copy of Layout Approval (in case of layout)File: IOD RERA GIRIRAJ.pdf12 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 2300029_IOD_signed (1).pdf12 May 2022
Commencement Certificates / NA Order for plotted developmentFile: 06FD947C-5F04-45AC-9E4F-198DA7403541.pdf12 May 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 May 2022
Declaration in FORM BFile: Affidavit cum declaration Giriraj.pdf12 May 2022
CERSAI detailsFile: CRESAI.pdf12 May 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AMIZRAOpp Runwal Plaza Anand Next To Dosti MMRDA Kores Road Vartak Nagar164CompletedDec 2018Late, Dec 2019

How this compares with Mumbai Suburban

3%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jagdale Giriraj on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND EAST6,700+ in Mumbai Suburban

2 kmJagdale GirirajCompleted 96Lapsed / revoked 87Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: JAGDALE INFRASTRUCTURE PVT. LTD.

JAGDALE INFRASTRUCTURE PVT. LTD. has 5 registrations on MahaRERA, including AMIZRA and JAGDALE AASTHA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Jagdale Giriraj is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jagdale Giriraj?

The registered promoter entity is JAGDALE INFRASTRUCTURE PVT. LTD., a company as per the filing. Its CIN U45200MH2007PTC174171 and GSTIN 27AACCJ0653K1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jagdale Giriraj?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jagdale Giriraj?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jagdale Giriraj?

The professionals named in the filing: Architect: Arch. Yateen Gokhale; Engineer: EPICONS CONSULTANTS PVT. LTD.; Engineer: JACOB DOSUZA; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jagdale Giriraj?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jagdale Giriraj. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jagdale Giriraj to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.