JAGANNATH PARADISE

By MAYUR GROUP

RG-MH-44410 · RERA P51700050635 · Last updated on MahaRERA portal: 26 Feb 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
8 of 20Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 65%
12 of 121Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

JAGANNATH PARADISE is a Others project by MAYUR GROUP in BADLAPUR WEST, 421503, registered with MahaRERA as P51700050635 on 21 Apr 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 109 of the 121 units on this registration are recorded sold or booked, and 8 of 20 construction stages are filed complete.

At a glance

Project

  • NameJAGANNATH PARADISE
  • TypeOthers
  • Location
    • SURVEY NO 258 HISSA NO 1 SURVEY NO 258 HISSA NO 4 MAUJE BADLAPUR TAL AMBERNATH
    • BADLAPUR WEST
    • 421503
  • Pincode421503
  • RERA no.P51700050635
  • ReraGenie IDRG-MH-44410

Builder

  • NameMAYUR GROUP
  • Entity typePartnership
  • GSTIN27AAZFM8650R1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBHAVANA JAGANNATH PISEKAR, DHANANJAY JAGANNATH PISEKAR
  • Other registrations3 more →
  • Completed2 of 4
  • Past their filed date1
  • Declared earlier projects3 →

Key dates

1 months past promisethis monthRegisteredApr 2023First promiseDec 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed84 files

Current status

90%109 of 121 units booked
89.3%Work done, per cost certificate

Figures as on 26 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAGANNATH PARADISE A WINGNA7748452
JAGANNATH PARADISE B WINGNA8062769

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

JAGANNATH PARADISE A WING63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
JAGANNATH PARADISE B WING63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes44%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Open Space132
BuildingOpen SpaceTotal
JAGANNATH PARADISE A WING6666
JAGANNATH PARADISE B WING6666

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,540 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Nov 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNCIPAL COUNCIL
Permissible FSI5568.2
Proposed, not sanctioned5,568 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR AND FIRST FLOOR, PATEL ESTATE,BAZAR PETH ROAD,KALYAN,THANE,MAHARASHTRA
Estimated costRs 14.44 cr
Cost incurredRs 12.90 cr
Work done89.35%
BuildingWingEstimatedIncurred
JAGANNATH PARADISE B WINGNARs 7.51 crRs 7.13 cr
JAGANNATH PARADISE A WINGNARs 5.68 crRs 5.40 cr
-NARs 1.26 crRs 37.68 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECT SACHIN VILAS SA
ArchitectMOHIT C WAKLE
EngineerATUL KUDTARKAR AND ASSOCIATES PVT LTD
EngineerSACHIN BORSE
Chartered AccountantNILESH A PATKI
Chartered AccountantRAVIRAJ B DANGE AND ASSOCIATES
PartnerRole in project
MAYUR GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518970Dec 2025 → Sep 2026

Reason as filed by the promoterThe project has been substantially completed in accordance with sanctioned plans, with structural, finishing, and allied works executed for the building. We are in a process of applying of the Completion Certificate to the Competent Authority, Further there is procedural requirements and inspection timelines, it could not be obtained within the registration period ending 31.12.2025. To comply with the Real Estate (Regulation and Development) Act, 2016, and protect the interests of allottees, we seek an extension of project registration solely to align validity with the certification process. T

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A 31032025.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf22 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf22 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf22 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Mayur group.pdf18 Sep 2025
Form 1File: Form 1 _Architect certificate.pdf20 Jul 2025
Form 2File: Form 2 MG.pdf20 Jul 2025
Form 3File: Form 3 MG.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold unsold.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE 31032025.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MG_11zon.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mayur Group.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE .pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MG jun 24_11zon.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance certificate.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: disclosure- mayur group.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Mayur.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - MAYUR GROUP.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - DEC-23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - DEC-23.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold jun23_11zon.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold Sept-23_11zon.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Dec23_11zon.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - DEC-23.pdf12 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf12 Jan 2024
Other - TechnicalFile: SELF DECLARATION CUM UNDERTAKING_11zon.pdf12 Jan 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrances - Finance.pdf29 Nov 2023
Details of encumbrances concerned to LegalFile: Non Encumbrances - Finance.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate MG SEPT-23.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate MG SEPT-23.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 2023-24 Q2_11zon.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mayur Group Engineers Certificate.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mayur Group CA Certificate.pdf20 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate new_11zon.pdf14 Apr 2023
Other - TechnicalFile: PLINTH LEVEL CERTIFICATE.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3_11zon.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECH CERTIFICATE_11zon.pdf13 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DICLOSURE-JAGANNATH PISEKAR.pdf13 Mar 2023
Layout approvalFile: PLAN-1.pdf22 Feb 2023
Building plan approvalFile: PLAN-1.pdf22 Feb 2023
Building plan approvalFile: PLAN-2.pdf22 Feb 2023
Building plan approvalFile: PLAN-3.pdf22 Feb 2023
Layout approvalFile: PLAN-2.pdf22 Feb 2023
Layout approvalFile: PLAN-3.pdf22 Feb 2023
PAN CardFile: Mayur Group Pan.pdf22 Feb 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT_11zon.pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Non encumbrances (finance)_11zon.pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Non encumbrances (Legal)_11zon.pdf22 Feb 2023
Details of encumbrances concerned to LegalFile: Non encumbrances (finance)_11zon.pdf22 Feb 2023
Details of encumbrances concerned to LegalFile: Non encumbrances (Legal)_11zon.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: PLAN-1.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: PLAN-2.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: PLAN-3.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-1.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-2.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN-3.pdf22 Feb 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf22 Feb 2023
Declaration in FORM BFile: FORM B BUILDER_11zon.pdf22 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200260761698_For_Asset_Based_Search_20_02_2023_11_23_27_497.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest mayur pisekar.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest dhananjay pisekar.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Jyoti pisekar.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest bhavana pisekar.pdf22 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf22 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
JAGANNATH GALAXYP51700018451JOVELI, ThaneNov 2018CompletedDec 2024Registered original: Oct 2022Aug 2023
JAGANNATH PRIDEP51700004903Badlapur (M Cl), ThaneAug 2017CompletedMar 2022Apr 2019

Keep JAGANNATH PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR WEST

Builder: MAYUR GROUP

MAYUR GROUP has 4 registrations on MahaRERA, including JAGANNATH PRIDE and JAGANNATH GALAXY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if JAGANNATH PARADISE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAGANNATH PARADISE?

The registered promoter entity is MAYUR GROUP, a partnership as per the filing. Its GSTIN 27AAZFM8650R1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAGANNATH PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAGANNATH PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAGANNATH PARADISE?

The professionals named in the filing: Architect: ARCHITECT SACHIN VILAS SA; Architect: MOHIT C WAKLE; Engineer: ATUL KUDTARKAR AND ASSOCIATES PVT LTD; Engineer: SACHIN BORSE; Chartered Accountant: NILESH A PATKI; Chartered Accountant: RAVIRAJ B DANGE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAGANNATH PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAGANNATH PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAGANNATH PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.