JAGANNATH GALAXY

By MAYUR GROUP

RG-MH-53247 · RERA P51700018451 · Last updated on MahaRERA portal: 11 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2022Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

JAGANNATH GALAXY is a Others project by MAYUR GROUP in Thane, Maharashtra, registered with MahaRERA as P51700018451 on 1 Nov 2018. The registration is recorded completed; possession was promised by 30 Oct 2022.

At a glance

Project

  • NameJAGANNATH GALAXY
  • TypeOthers
  • Location
    • JOVELI
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700018451
  • ReraGenie IDRG-MH-53247

Builder

  • NameMAYUR GROUP
  • Entity typePartnership
  • GSTIN27AAZFM8650R1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersJAGANNATH PANDURANG PISEKAR, BHAVANA JAGANNATH PISEKAR, JYOTI JAGANNATH PISEKAR, DHANANJAY JAGANNATH PISEKAR, DHANANJAY JAGANNATH PISEKAR, BHAVANA JAGANNATH PISEKAR
  • Other registrations3 more →
  • Completed2 of 4
  • Past their filed date1
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2018PromisedOct 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Nov 2018
  • Promised completion30 Oct 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA90000
B WINGNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Open Space62
BuildingOpen SpaceTotal
A WING2222
B WING4040

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,460 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10330.0
Proposed, not sanctioned10,330 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPATEL ESTATE, NEAR GANDHI CHOWK, BAZAEPETH ROAD, KALYAN -421301

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARTI V JAMGAONKAR
EngineerATUL KUDTARKAR & ASSOCIATES
Chartered AccountantNILESH A PATKI
PartnerRole in project
MAYUR GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009629Oct 2022 → Jun 2024

Reason as filed by the promoterPlan has been revised for construction of additional floors vide revised construction permission dated 19.04.2021 from Kulgaon Badlapur Municipal Corporation. The copy of the construction permission with Application for Extension of project completion date u/s 7 (3) in format B is enclosed herewith for your reference & perusal.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Oct 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality 22-23.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registraion Certificate B wing.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_11zon.pdf28 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate mar23_11zon.pdf28 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate june23_11zon.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec22.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Mar 23.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Jun 23.pdf28 Oct 2023
Certificates of CA (Form 3)File: Form 3 MG Dec22_11zon.pdf28 Oct 2023
Certificates of CA (Form 3)File: CA certificate 22-23 Q4_11zon.pdf28 Oct 2023
Certificates of CA (Form 3)File: Form 3 MG Jun 23 Galaxy _11zon.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 MG 22-23.pdf28 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KBMC OC MG B WING.pdf28 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf28 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate A wing Galaxy.pdf20 Mar 2023
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE GALAXY-DCB.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RERA AUDIT.pdf18 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf14 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf14 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf14 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate MG.pdf14 Nov 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 1_11zon.pdf14 Nov 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 1_11zon.pdf14 Nov 2022
Certificates of CA (Form 3)File: CA CERTIFICATE _1_11zon.pdf14 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A wing OC-Jagannath Galaxy.pdf20 Apr 2022
Certificates of CA (Form 3)File: MG CA CERTIFICATE_COMPRESS.pdf1 Mar 2022
Layout approvalFile: REVISED Plan A-Wing 1-2.pdf24 Feb 2022
Layout approvalFile: REVISED Plan B-Wing 2-2.pdf24 Feb 2022
Copy of Layout Approval (in case of layout)File: REVISED Plan A-Wing 1-2.pdf24 Feb 2022
Copy of Layout Approval (in case of layout)File: REVISED Plan B-Wing 2-2.pdf24 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf24 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf24 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf24 Feb 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf1 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Q1-19-20.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Q2-19-20.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Q3-19-20.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Q4-19-20.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Q1-20-21.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Q2-20-21.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Q3-20-21.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Q4-20-21.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Annexure A SOLD INVENTORY COMPRESS.pdf29 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Audit Form 5 Jaganath Galaxy 2021.pdf29 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 310321.pdf13 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 310321.pdf13 May 2021
Certificates of CA (Form 3)File: CA Certificate 310321.pdf13 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA AUDIT JAGANATH GALAXY 2020.pdf21 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf23 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf23 Jan 2020
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf23 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA AUDIT FORM 5.pdf27 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31032019.pdf5 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE 310319.pdf5 Jun 2019
Certificates of CA (Form 3)File: CA Certificate.pdf5 Jun 2019
Copy of the legal title reportFile: TITLLE CERTIFICATE FINAL.pdf30 Oct 2018
Details of encumbrancesFile: NON ENCOMBRANCES CERTIFICATE.pdf30 Oct 2018
Building plan approvalFile: PLAN A WING.pdf29 Oct 2018
Building plan approvalFile: PLAN B- WING.pdf29 Oct 2018
Layout approvalFile: PLAN A WING.pdf29 Oct 2018
Layout approvalFile: PLAN B- WING.pdf29 Oct 2018
PAN CardFile: PAN Card.pdf29 Oct 2018
Copy of Layout Approval (in case of layout)File: PLAN A WING.pdf29 Oct 2018
Copy of Layout Approval (in case of layout)File: PLAN B- WING.pdf29 Oct 2018
Building Plan Approval (IOD)File: PLAN A WING.pdf29 Oct 2018
Building Plan Approval (IOD)File: PLAN B- WING.pdf29 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC PDF FINAL.pdf29 Oct 2018
Declaration in FORM BFile: FORM B.pdf29 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf29 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf29 Oct 2018
Certificates of CA (Form 3)File: CA Certificate.pdf29 Oct 2018
Proforma of Allotment letterFile: BLANK AGREEMENT FOR SALE - MAYUR GROUP JOVELI.pdf29 Oct 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Oct 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JAGANNATH PARADISEP51700050635BADLAPUR WEST121Apr 2023OngoingDec 2025Not delivered
JAGANNATH PRIDEP51700004903Badlapur (M Cl), Thane-Aug 2017CompletedMar 2022Apr 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAGANNATH GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOVELI7,600+ in Thane

Builder: MAYUR GROUP

MAYUR GROUP has 4 registrations on MahaRERA, including JAGANNATH PRIDE and JAGANNATH GALAXY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JAGANNATH GALAXY is delayed beyond 30 Oct 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAGANNATH GALAXY?

The registered promoter entity is MAYUR GROUP, a partnership as per the filing. Its GSTIN 27AAZFM8650R1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAGANNATH GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAGANNATH GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAGANNATH GALAXY?

The professionals named in the filing: Architect: ARTI V JAMGAONKAR; Engineer: ATUL KUDTARKAR & ASSOCIATES; Chartered Accountant: NILESH A PATKI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAGANNATH GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAGANNATH GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAGANNATH GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.